You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  2. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  3. RESEARCH AND DEVELOPMENT OF AUDIO, VISUAL AND PRINTED MATERIALS FOR EMS PERSONNEL

    SBC: Association Management & Cons.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Transportation
  4. RESEARCH AND DEVELOPMENT OF AUDIO, VISUAL AND PRINTED MATERIALS FOR EMS PERSONNEL

    SBC: Association Management & Cons.            Topic: N/A

    ASSOCIATION MANAGEMENT AND CONSULTATION, INC.(AMC) PROPOSES TO CONDUCT AN ANALYSIS OF THE ACTUAL AND PERCEIVED AUDIO VISUAL NEEDS OF EMERGENCY MEDICAL SERVICES (EMS) PROVIDERS IN THEIR NETWORKING EFFORTS WHICH CURRENTLY REVOLVE AROUND ACURRICULUM ENTITLED "OCCUPANT SAFETY SYSTEMS, LESSON PLANS AND INSTRUCTOR GUIDE FOR EMS PERSONNEL". WHILE THE CURRICULUM AND THE STRATEGIES WHICH IT DETAILS HAVE ME ...

    SBIR Phase II 1987 Department of Transportation
  5. COGNITIVE SKILL BASED CHILD-RESISTANT SAFETY BELT BUCKLE DEVICE

    SBC: Yellowstone Environmental            Topic: N/A

    A RELATIVELY UNDOCUMENTED PROBLEM OF UNAUTHORIZED RELEASE OFSAFETY BELT AND CAR SAFETY SEAT (CSS) HARNESS BUCKLES BY YOUNG CHILDREN HAS BEEN REPORTED BY PARENTS TO THE NHTSA AND TO CSS EDUCATORS. THE OBJECTIVE OF THIS RESEARCH IS TO DOCUMENT THE NATURE AND EXTENT OF THE PROBLEM AND DEVELOP AND TEST COGNITIVE SKILL BASED SOLUTIONS TO IT. WORK WILL INCLUDE A SURVEY OF CSS USERS; VISUAL OBSERVATION O ...

    SBIR Phase I 1989 Department of Transportation
  6. EcoSod: An Alternative Native Sod Solution for Highway Construction Projects

    SBC: Bitterroot Restoration Inc.            Topic: N/A

    The Surface Transporation and Uniform Relocation Assistance Act (STURAA) requires the use of native grasses and wildflowers within highway corridors. A major problem for the revegetation industry has been the ability to predictably establish native vegetation from seed. The production of native sods would allow for the most sensitive period of establishment-germination and initial seedling growt ...

    SBIR Phase I 2003 Department of Transportation
  7. Phase II: EcoSod An Alternative Native Sod Solution for Highway Construction

    SBC: Bitterroot Restoration Inc.            Topic: N/A

    The Surface Transportation and Uniform Relocation Assistance Act requires the use of native grasses and wildflowers within highway corridors. A major problem for the revegetation industry has been the ability to predictably establish native vegetation from seed. The production of native sods would allow for the most sensitive period of establishment-germination and initial seedling growth-to be ...

    SBIR Phase II 2006 Department of Transportation
  8. Environmentally Friendly Low Friction Coating for Concrete Barriers

    SBC: RESODYN CORPORATION            Topic: 121FH1

    Resodyn Corporation is proposing a material and application system that will create a low friction coating on concrete median barriers. The advanced material developed for the low friction coating is an affordable, tough, weather resistant, and environmentally friendly copolymer. The proposed application concept is for truck mounted equipment that enables a single pass application of the coating ...

    SBIR Phase I 2012 Department of Transportation
  9. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  10. Development of a Long Term pH and pCO2 Lagrangian Drifter

    SBC: SUNBURST SENSORS, LLC            Topic: 831C

    Quantifying oceanic CO2 uptake and ocean acidification and understanding their impact on global climate and ocean ecology are key goals of NOAA’s climate change research programs. NOAA’s request for Development of a long-term Lagrangian pH and pCO2 drifter (SBIR Subtopic 8.3.1C) aims to address these goals by developing technology that measures both pCO2 and pH that can be widely deployed in t ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government