You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of Corrosion Resistant Prestressed Concrete Strands Utilizing Liquie Plasma Technology

    SBC: CAP Technologies LLC            Topic: 141FH6

    This proposal is to prove the feasibility of a new and novel zinc-based alloyed coating on both the manufactured Grade 270 0.5 and 0.6 low-relaxation strands and for the individual wires used to make the 7-wire strand for prestressed concrete used in bridge construction. The application of the coating will use CAP Technologies LLC [CAP] proprietary and patented foam plasma technology also kn ...

    SBIR Phase I 2014 Department of Transportation
  2. Hybrid Laser Arc Welding for Thick Plate High Performance Steels

    SBC: TECHKNOWSERV CORP            Topic: 132FH1

    High performance steels were developed in a cooperative program between the Federal Highway Administration (FHA), the American Iron and Steel Institute (AISI), and the U.S. Navy Carderock Division of the Naval Surface Warfare Center. HPS70W high strength steel is currently being used in bridge structures. HPS is stronger than conventional 70W steel and has less than 15% of the sulfur and 60% of th ...

    SBIR Phase I 2014 Department of Transportation
US Flag An Official Website of the United States Government