You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid, Field-Deployable Water Sampling Device to Facilitate On-Site Total PFAS Measurement

    SBC: FOREVER ANALYTICAL SERVICES, INC.            Topic: 1D

    a. Innovativeness of the proposed technology Forever Analytical Services (FAS) has developed particle-induced gamma-ray emissions (PIGE) spectroscopy for the high-throughput screening of per- and poly-fluoroalkyl substances (PFAS) in water. This proposal seeks to extend the utility of this technique to the field by developing a field-deployable solid phase extraction (SPE) device containing a filt ...

    SBIR Phase I 2023 Environmental Protection Agency
  2. Monitoring network for methane emissions

    SBC: MESA PHOTONICS LLC            Topic: 2C

    Methane (CH4) is the second most important greenhouse gas after carbon dioxide (CO2). Human activity related radiative forcing by methane accounts for about half of that caused by CO2. In the U.S., the largest industrial source of CH4 is oil and gas systems. Fugitive sources are often identified as potentially large sources of CH4 emissions; however, multiple measurement challenges inhibit more co ...

    SBIR Phase I 2023 Environmental Protection Agency
  3. Disaster Platform- Helping communities build resilience to disasters via social networking, gamification and relationship building

    SBC: GOODGAMES LLC            Topic: 3A

    In today’s world of accelerating climate change effects, a community's capacity to plan for and build resilience to disasters, homeland security threats, and extreme weather is of increasing importance. The ability of public safety organizations and local governments to effectively communicate with community members in emergency situations is critical, especially in the immediate aftermath of la ...

    SBIR Phase I 2023 Environmental Protection Agency
  4. Reducing produce waste via novel biopreservative ingredients

    SBC: Imvela Corp.            Topic: 4A

    According to the USDA, 25% of the US fresh fruit supply at the consumer level is wasted, which equates to 9.5 billion pounds. To address consumer food waste, Imvela Corp. proposes to develop a novel, natural ingredient that reduces microbial spoilage and extends shelf life, when applied to berries after they are harvested. Our approach is innovative because we collect experimental data from a larg ...

    SBIR Phase I 2023 Environmental Protection Agency
  5. Prototyping a Process to Reuse Wasted Glass in High Performance Low Carbon Concrete

    SBC: KLAW INDUSTRIES LLC            Topic: 4D

    How Glass SCMs Solve the Market Need. The process of producing cement has remained unchanged since the industrial revolution. Concrete producers need a new high performing cement alternative to lower their concrete products' cost and embodied carbon. Otherwise, we will be building our future communities using a process with the environmental and financial costs of 1820s technology. This project wi ...

    SBIR Phase II 2023 Environmental Protection Agency
  6. Byte-Taint Resonance Imaging (ByteRI)

    SBC: ASSURED INFORMATION SECURITY, INC.            Topic: AF20CTCSO1

    Assured Information Security, Inc. (AIS), in collaboration with Colorado State University (CSU) and the National Renewable Energy Laboratory (NREL), proposes a second (or sequential) Phase II of the Byte-Taint Resonance Imaging (ByteRI) STTR effort. This iteration of the ByteRI program will expand upon the binary analysis and program behavior analysis concepts identified in the original effort and ...

    STTR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  7. Human Performance Monitoring Blast Environment

    SBC: Organic Robotics Corporation            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  8. Improve Group Response to A234-005- Holistic Health and Fitness Readiness Kit

    SBC: Improve Group, Inc.            Topic: A234005

    This effort is more than just a facility innovation question. It is existential to the Army’s preparation for the future fight.  SPRC’s can’t just be a new evolution of fitness facility, but they must meet new soldiers where they are, and lead them to their potential as soldiers.  The right SPRC program will affect recruiting and retention, and ultimately the Army’s global force generati ...

    SBIR Phase I 2023 Department of DefenseArmy
  9. Air Structure Holistic Health & Readiness

    SBC: AIR STRUCTURES AMERICAN TECHNOLOGIES, INC.            Topic: A234005

    Air Structures American Technologies Inc (ASATI) has assembled the right team to develop a unique approach to solving the Army's need for the requisite infrastructure for the Holistic Health and Fitness (H2F) Soldier Performance Readiness Center (SPRC). Utilizing an already proven air-supported structure, our proposal will reduce overall project costs, timelines, and construction risk while main ...

    SBIR Phase I 2023 Department of DefenseArmy
  10. AIExploit: automated detection of exploits in AI/ML models for red team penetration testing

    SBC: YRIKKA, INC.            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government