You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative CubeSat Payloads for USSOCOM Space Missions

    SBC: A-TECH CORPORATION            Topic: SOCOM17003

    Small satellites have proven capable and cost effective, and innovative payloads and technologies will expand the mission space that CubeSats can support. ATA proposes to build a CubeSat-sized laser communications prototype payload, adapting high photon efficiency optical communications techniques to achieve data transfer rates up to 100 mega-bits per second (Mbps) with the small apertures require ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  2. Provably Unclonable Functions on Re-configurable Devices

    SBC: IERUS TECHNOLOGIES INC            Topic: A18BT001

    The ability to authenticate electronic devices is an important step towards modernizing the hardware/software of our Nations communication systems. Protecting these targeted networks and devices from malicious cyber-based attacks is becoming increasingly important as the technological and cyber capabilities of our adversaries continue to advance. In addition to network security, device authenticat ...

    STTR Phase I 2018 Department of DefenseArmy
  3. Multicore Fiber Optic Package Optical Subassembly for Wideband Digital and Analog Photonic Links

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: N182101

    In this SBIR effort we will develop a balanced detection analog photonic link consisting of a DFB laser, a dual-output high-speed, low-Vp mach-zehnder modulator (MZM) and a high-power, high-linearity balanced photodetector (BPD) using a dual-core, single mode, multicore fiber (MCF) that is supplied by our subcontractor, OFS. We will design, fabricate and characterize (phase I) the MZM and the BPD, ...

    SBIR Phase I 2018 Department of DefenseNavy
  4. Photonic Integrated Circuit Reliability

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: N182108

    Photonic integration, and specifically silicon photonics, has emerged as one of the leading solutions for maintaining or improving the performance of optical systems while addressing the requirements related to size, weight, and power (SWaP). Photonic integrated circuits (PICs), which integrate multiple photonic elements onto a single chip, are specifically suited to providing the complexity and f ...

    SBIR Phase I 2018 Department of DefenseNavy
  5. Data Analytics for Navy Aircraft Component Fatigue Life Management

    SBC: AVNIK DEFENSE SOLUTIONS INC            Topic: N182100

    Operational availability, reliability, and performance of Navy aircraft are key factors in achieving mission success. The Army maintains extensive data sets to document historical and current field experience with in-service aircraft. Engineering, logistics,and maintenance organizations,at all levels, use these data sets as inputs to guide decision processes about engineering and sustainment plann ...

    SBIR Phase I 2018 Department of DefenseNavy
  6. Workflow Automation for Simulations of Optical and RF Exposures

    SBC: STELLAR SCIENCE LTD. CO.            Topic: AF181001

    Devices that produce high-power radio frequency and optical radiation can be hazardous to operate and can lead to overexposures in humans. Because human experiments are undesirable, analysts use software chains to predict exposures: these range from simulations of the devices to propagation of the electromagnetic waves through the environment and finally to simulations of effects in human tissue. ...

    SBIR Phase I 2018 Department of DefenseAir Force
  7. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions

    SBC: GASTOPS INC            Topic: AF182005

    This GasTOPS Inc. proposal is aimed at providing a high quality, low risk solution to the MQ-9 platform by providing an onboard engine health monitoring capability to support current and future missions. Currently there is a lack of wear monitoring capability for the Honeywell TPE331 propulsion system in the Air Force’s MQ-9 Reaper remotely piloted aircraft (RPA) which has caused a number o ...

    SBIR Phase I 2018 Department of DefenseAir Force
  8. Coupled Multi-Physics Tool for Analysis of Structural Profile Disruption Effects of Aerovehicles

    SBC: CFD RESEARCH CORPORATION            Topic: AF17AT025

    High speed air vehicles operate at material strength performance limits and are at significant risk when subjected to additional localized heating that can result in softening, pitting and burn-through the material and potentially change the vehicle structural profile. These effects degrade aerodynamic performance. The team of CFDRC and UDRI proposed to develop, validate and deliver a comprehensiv ...

    STTR Phase II 2018 Department of DefenseAir Force
  9. In Theater Additive Manufacturing of Ceramic Armor for Dismounted Soldiers and Structures

    SBC: GOODMAN TECHNOLOGIES LLC            Topic: A17AT012

    Goodman Technologies (GT) and University of Hawaii (a Department of Defense University Affiliated Research Center and Minority Serving Institution) in partnership with Robocasting Enterprises (Small Business spin-off from Sandia National Laboratories technology transfer program), will meet all Army objectives (and more) by 3D printing B4C, B6O, B4C-SiC hybrid and other ceramic nanocomposite armor ...

    STTR Phase II 2018 Department of DefenseArmy
  10. Dismounted Soldier Positioning, Navigation and Timing (PNT) System Initialization

    SBC: Integrated Solutions for Systems, Inc.            Topic: A17AT017

    Integrated Solutions for Systems, Inc. (IS4S) and teammate Auburn University (AU) propose to develop a PNT initialization system for dismounted soldiers. The proposed system will enhance warfighters’ ability to operate immediately in a GPS denied environments once their mission begins and has wide commercialization potential outside of DoD. In Phase I, the feasibility and expected benefits of in ...

    STTR Phase II 2018 Department of DefenseArmy
US Flag An Official Website of the United States Government