You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AIR-SPARGED HYDROCYCLONE TECHNOLOGY FOR REMOVAL OF OIL AND AFFF FROM WASTE WATER

    SBC: Advanced Processing Tech.,            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  2. GaP ZnS for Blue Light Emitting Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    AstroPower is developing a two-junction monolithic tandem solar cell composed of (AlxGa1-x)0.51In.49P lattice matched to GaAs for use as the top cell in a three-junction, two-terminal tandem stack. This tunable bandgap material system is capable of current matching, at 2.03eV, in a two-junction monolithic tandem solar cell two terminal design of (AlxGa1-x)0.51In0.49P/GaAs yielding a best case pred ...

    SBIR Phase II 1993 Department of DefenseMissile Defense Agency
  3. LIGHTWEIGHT, LIGHT-TRAPPED, THIN GAAS SOLAR CELL FOR SPACECRAFT APPLICATIONS

    SBC: ASTROPOWER, INC.            Topic: N/A

    ASTROPOWER IS PROPOSING THE DEVELOPMENT OF AN ULTRA-LIGHTWEIGHT, HIGH PERFORMANCE, THIN LIGHT TRAPPING GAAS SOLAR CELL FOR ADVANCED SPACE POWER SYSTEMS. A THIN DEVICE LEADS TO HIGHER PERFORMANCE IN TERMS OF OPEN CIRCUIT VOLTAGE, RADIATION RESISTANCE, AND SPECIFIC POWER. IN A THIN DEVICE, THE INCORPORATION OF LIGHT TRAPPING TO EXTEND THE OPTICAL PATH LENGTH PERMITS GREATER CURRENT GENERATIC THAN CA ...

    SBIR Phase II 1993 Department of DefenseAir Force
  4. High Specific Power, Electrostatically Bonded, Ultra-thin Gaas

    SBC: ASTROPOWER, INC.            Topic: N/A

    ASTROPOWER PROPOSES TO DEVELOP A LIGHTWEIGHT, HIGH PERFORMANCE, ULTRA-THIN ELECTROSTATICALLY BONDED GaAs SOLAR CELL WITH COPLANAR BACK CONTACTS. THE INNOVATIVE DESIGN INCORPORATES LIGHT TRAPPING, ADHESIVELESS COVER SLIDE BONDING, AND ELIMINATES GRID SHADING. THIS NOVEL DEVICE WILL EXHIBIT INCREASED EFFICIENCY AND SPECIFIC POWER DUE TO THE HIGHER OPEN CIRCUIT VOLTAGE AND SHORT CIRCUIT CURRENT OBTAI ...

    SBIR Phase I 1993 Department of DefenseMissile Defense Agency
  5. Monolithically Interconnected, Thin Silicon Solar Cell Array

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseMissile Defense Agency
  6. Bipolar Lead Acid Batteries Using Polymer/carbon Composite Bipolar

    SBC: BIPOLAR TECHNOLOGIES            Topic: N/A

    WORKERS AT BRIGHAM YOUNG UNIVERSITY, BIPOLAR TECHNOLOGIES, HAVE DEVELOPED A MATERIAL FOR USE AS A BIPOLAR ELECTRODE SUPPORT WHICH WILL RESULT IN MORE LIGHTWEIGHT, LONGER LIFE BATTERIES. THE ELECTRODE SUPPORT IS A COMPOSITE MATERIAL COMPOSED OF LOW SURFACE AREA CARBON/POLYMER COMPOSITE MATERIAL WHICH HAS LOW ELECTRICAL RESISTANCE, CHEMICALLY STABLE, AND HAS LOW ACTIVITY FOR OXYGEN EVOLUTION, AN UND ...

    SBIR Phase I 1993 Department of DefenseMissile Defense Agency
  7. REMOVAL OF VOLATILE ORGANIC COMPOUNDS FROM GASEOUS EFFLUENT STREAMS BY NOVEL PERFLUOROMEMBRANES

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Environmental Protection Agency
  8. FEASIBILITY OF UAV AIRFOIL & CONTROL SURFACE MANUFACTURING USING CONTINUOUS MANUFACTURING MACHINES

    SBC: Daedalus Research Inc.            Topic: N/A

    CONTRACTOR WILL EXAMINE THE FEASIBILITY OF UTILIZING PULTRUSION-TYPE CONTINUOUS TAPE LAYING MANUFACTURING EQUIPMENT TO FABRICATE COMPOSITE SANDWICH STRUCTURE WINGS AND STABILIZERS FOR CLOSE RANGE AND SHORT RANGE CLASS UNMANNED AERIAL VEHICLES. DURING PHASE I A SMALL PROOF-OF-CONCEPT MANUFACTURING MACHINE WILL BE DESIGNED, BUILT, AND EVALUATED. IN ADDITION, THE QUALITY OF THE MANUFACTURED PRODUCT F ...

    SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency
  9. A Flexible Concurrent Design System for Rapid Prototype Manufacturing

    SBC: Engineering Geometry Systems            Topic: N/A

    Engineering Geometry Systems (EGS) will create a system specification for an integrated system for design and fabrication of custom parts for use in hydrodynamics experiments. The requirements of the system will be identified and a design will be proposed which is based on EGS underlying design for manufacturing technology. EGS technology is especially suited for this custom system since it encomp ...

    SBIR Phase II 1993 Department of DefenseNavy
  10. ADVANCED, DIRECT AIR SAMPLING GAS CHROMATOGRAPHY MODULE FOR ION MOBILITY SPECTROMETRY

    SBC: FEMTOSCAN CORP.            Topic: N/A

    EXPLORATORY DEVELOPMENT OF AN ADVANCED, DIRECT AIR SAMPLING GAS CHROMATOGRAPHY (GC) MODULE IS PROPOSED. THE GC RIODULE CAN BE READILY COMBINED WITH EXISTING ION MOBILITY SPECTROMETRY (INS) EQUIPMENT FOR DETECTING AND MONITORING CHEMICAL WARFARE AGENTS, E.G., THE CAM (CHEMICAL AGENT MONITOR) CURRENTLY ADOPTED BY SEVERAL NATO MEMBER STATES. THE GC MODULE INCORPORATES A NOVEL, AMBIENT AIR SAMPLING DE ...

    SBIR Phase II 1993 Department of DefenseArmy
US Flag An Official Website of the United States Government