You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Voltage Power Sources for Long-Life Electronics

    SBC: TALOSTECH LLC            Topic: SB163009

    There is a critical need for DoD to develop power sources that will increase the mission lifetime for unattended sensors and sensor radio networks. In order to take advantage of recent advances in extremely low power subthreshold circuits to greatly exte...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  2. Advanced Manufacturing Technologies

    SBC: SENTIENT SCIENCE CORPORATION            Topic: DLA152001

    In response to DLA SBIR Topic DLA152-001 for Advanced Manufacturing Technologies, Sentient Corporation (Sentient) proposes to develop a life cycle cost optimization tool based on our commercial DigitalClone modeling technology. This tool will enable users to evaluate the tradeoffs between alternate manufacturing processes, implementation costs, and the performance/durability of the resultant comp ...

    SBIR Phase II 2017 Department of DefenseDefense Logistics Agency
  3. Secure Protocol Unalterable Data (SPUD) Phase II

    SBC: IDAHO SCIENTIFIC LLC            Topic: MDA15009

    Idaho Scientific proposes the development of Secure Protocol Unalterable Data (SPUD) as a means to identify activity against system technologies. Approved for Public Release | 17-MDA-9219 (31 May 17)

    SBIR Phase II 2017 Department of DefenseMissile Defense Agency
  4. ATCOM SHARP Box for Real-Time Turbulence Mitigation

    SBC: EM PHOTONICS INC            Topic: NASAA402

    When imaging over long distances, atmospheric turbulence between the camera and subject degrades the collected data limiting the effective resolution, regardless of the quality of the optic and sensor used. This reduction in image quality can have serious impacts on the ability to carry out missions by reducing situational awareness and preventing target identification. EM Photonics has been worki ...

    SBIR Phase II 2017 Department of DefenseSpecial Operations Command
  5. Materials Development for Affordable Maritime Compatible Radio Frequency Materials

    SBC: SPECTRUM MAGNETICS LLC            Topic: N162117

    This Phase I SBIR proposal aims to develop flexible and maritime compatible radio frequency (RF) materials for microwave absorbing material applications and antenna applications at GHz frequencies. Based on the deep understanding of material physics for high frequency properties, and extensive experience in fabricating and supplying RF materials, Spectrum Magnetics proposes several material platfo ...

    SBIR Phase I 2017 Department of DefenseNavy
  6. 1 Micron Fiber Optic Receiver for Mil-Aero Environment

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: N171031

    In this SBIR effort we will develop a high-power, high-speed photodiode (PD) receiver optimized for operation at 1 micron wavelength based on collaboration with Dr. J.C. Campbells research group at the UVA. Demand of such photonic receiver arose from the urgent need of high performance microwave photonic links that replace the conventional metal cables for better SWaP, immunity to EMI and broader ...

    SBIR Phase I 2017 Department of DefenseNavy
  7. Improved Skirt System for Air Cushion Vehicles

    SBC: Kubota Research Associates            Topic: N171042

    Both the Deep Skirt and Advanced Skirt System material used on Landing Craft Air Cushion (LCAC) experience significant wear during normal operations, which require expensive, time-consuming maintenance repairs. The US Navy is looking for innovative new material and manufacturing method for skirt systems to improve it durability and reduces Total Ownership Cost (TOC). Rubber skirts experience two m ...

    SBIR Phase I 2017 Department of DefenseNavy
  8. Image Enhancement and Machine Learning for Improving Man-Portable Targeting Systems

    SBC: EM PHOTONICS INC            Topic: N172102

    Modern DoD applications are benefiting from the proliferation of EO/IR sensor technology. As imagers become cheaper and smaller, they are being more widely deployed for a variety of scenarios. This trend is exemplified by the Navys Future Targeting System (FTS), which will provide laser designation, laser spot imaging, and some target location functions in a single 5.5-pound unit, replacing discre ...

    SBIR Phase I 2018 Department of DefenseNavy
  9. Reliability Centered Additive Manufacturing Design Framework

    SBC: SENTIENT SCIENCE CORPORATION            Topic: N152109

    Sentient along with sub-contractors at Iowa State University, and Honeywell Aerospace will develop and validate the full standalone DigitalClone - Component (DCC) simulation package (the proposed Reliability Centered Additive Manufacturing Design Framework), for assessing tradeoffs in reliability, inspectability, performance/durability and life-cycle costs of parts made through Additive Manufactur ...

    SBIR Phase II 2017 Department of DefenseNavy
  10. Functional Additive Manufacturing for Printable & Networkable Sensors to Detect Energetics and Other Threat Materials

    SBC: Delux Advanced Manufacturing, LLC            Topic: A17AT004

    Chemiresistors are an important class of electronic sensors that detect the presence of analytes/chemicals via a change in the resistance of a sensor element. A typical interdigitated electrode array is deposited onto an insulating substrate with metallic electrodes that have feature sizes in the 5-500 m range. The metal electrodes are typically sputter coated onto the substrate, using lithogra ...

    STTR Phase I 2017 Department of DefenseArmy
US Flag An Official Website of the United States Government