You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HETERODYNE SHEARING INTERFEROMETRY FOR SURFACE PROFILE

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    WE PROPOSE TO DEVELOP AND VERIFY IN THIS PHASE I PROGRAM A TECHNIQUE THAT WILL ACCURATELY AND REPEATABLY MEASURE SURFACE PROFILES AND DISTANCES BETWEEN A TEST OBJECT AND DETECTORS USING THE SHEARING HETERODYNE INTERFEROMETRY TECHNIQUE. THE TECHNIQUE IS BASED ON SHEARING HETERODYNE INTERFEROMETRY WITH A FREQUENCY MODULATED LASER DIODE USING THE FOUR-BUCKET-INTEGRATING TECHNIQUE. IT CAN BE USED TO D ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. ACT PROCESSORS FOR ECM APPLICATIONS

    SBC: Electronic Decisions, Inc.            Topic: N/A

    WITH INCREASING WAVEFORM COMPLEXITY AND EMITTER DENSITY IN THE TACTICAL ELECTROMAGNETIC SIGNAL ENVIRONMENT, THE JOB OF INTERCEPTING AND IDENTIFYING POTENTIALLY THREATS HAS OVERWHELMED THE CAPABILITIES OF CONVENTIONAL ESM RECEIVERS. THIS PROPOSAL DESCRIBES A PROGRAM TO STUDY THE APPLICATION OF ACOUSTIC CHARGE TRANSPORT (ACT) TECHNOLOGY TO ADVANCED ESM RECEIVER ARCHITECTURES. ACT IS AN EMERGING TECH ...

    SBIR Phase I 1991 Department of DefenseArmy
  3. ADVANCED PEROVSKITE ELECTROCATALYSIS FOR DIRECT METHANOL FUEL CELLS

    SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED            Topic: N/A

    THE PROPOSED PHASE I PROGRAM ADDRESSES PROBLEMS CURRENTLY INHIBITING DEVELOPMENT OF DIRECT METHANOL FUEL CELLS BY SUBSTITUTING HIGH AREA PEROVSKITE ELECTROCATALYSTS OF THE GENERAL COMPOSITION LN1-XAXCOO3, AND ACO1-XFEXO3 (WHERE LN - LA, ND, SM AND EU; A' = BA, SR, CA AND CE WITH O < X < 0.6; A - BA AND SR WITH O < X < O.4) FORDISPERSED NOBLE METAL ELECTOCATALYSTS CURRENTLY USED FOR THIS APPLICATIO ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  4. SURVIVABLE ADAPTIVE TACTICAL MULTIMEDIA COMMUNICATIONS

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  5. FAILURE INVESTIGATION OF CERAMIC ARMOR BACKED BY ALUMINUM OR ALUMINUM MATRIX COMPOSITE SUPPORT-PLATES

    SBC: Lanxide Corporation            Topic: N/A

    IT IS PROPOSED THAT THE BALLISTIC PERFORMANCE OF TIB2 CERMAIC ARMOR TILES BACKED UP BY A VARIETY OF LIGHTWEIGHT SUPPORT-PLATES BE INVESTIGATED BY 1MEV FLASH X-RAY EQUIPMENT DURING PENETRATION, AND BY MACROSCOPIC AND MICROSCOPIC OBSERVATIONS OF RECOVERED TARGETS. THE SUPPORT-PLATE TEST MATRIX INCLUDES TWO MATERIALS (A STRUCTURAL ALUMINUM ALLOY AND A CERAMIC REINFORCED ALUMINUM MATRIX COMPOSITE), TW ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  6. INVESTIGATION OF STRESS WAVES AND FAILURE PHENOMENOLOGY IN ALUMINUM METAL MATRIX COMPOSITE AND TIB2 LAMINATED ARMOR

    SBC: Lanxide Corporation            Topic: N/A

    TO UNDERSTAND BETTER HOW LAMINATED CERAMIC ARMOR PERFORMS, IT IS PROPOSED TO INVESTIGATE THE EFFECT OF THE IMPEDANCE MISMATCH AND INTERLAYER BOND STRENGTH (BETWEEN AI(2)0(3) REINFORCED ALUMINUM MATRIX COMPOSITES AND TIB(2)) ON STRESS WAVE PROPAGATION AND PENETRATION PHENOMENOLOGY DUE TO LONG ROD IMPACT. LANXIDE'S UNIQUE PROCESSING TECHNOLOGIES WILL BE USED TO FORM A STRONG METALLURGICAL BOND AT TH ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  7. NOVEL CERAMIC/METAL COMPOSITES FOR ARMOR APPLICATIONS

    SBC: Lanxide Corporation            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  8. HIGH SPEED AERIAL CABLE TARGET TROLLEY

    SBC: Product Planning, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. SEMANTIC SEARCH OF INFORMATION DATABASES

    SBC: Utek Inc            Topic: N/A

    THIS RESEARCH WILL DEVELOP A METHODOLOGY FOR UTILIZING A LEXICAL DATABASE IN A STATISTICAL RETRIEVAL MODEL TO IMPROVE RETRIEVAL PERFORMANCE (I.E., RECALL AND PRECISION). THE SESAME ARCHITECTURE PROPOSED IN THIS PROPOSAL WILL UTILIZE THE LEXICAL DATABASE IN FOUR MAJOR PHASES OF RETRIEVAL: (1) DOCUMENT ANALYSIS; (2) QUERY FORMULATION; (3) RETRIEVAL AND RANKING; AND (4) QUERY REFORMULATION. A PROTOTY ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  10. WIZARD: AN INTEGRATED DESIGN AND MANUFACTURABILITY ANALYSIS TOOL SET

    SBC: WIZDOM SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government