You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Parameter Development for the Scaled Manufacturing of Mycelium Bound Panels for Commercial Interior Products
SBC: Ecovative Design Llc Topic: 16NCER6AEcovative Design uses grown mycelium structures to bind agricultural and wood byproducts into inherently nontoxic_x000D_ products containing no added urea formaldehyde or flame-retardant chemicals. This research program focuses_x000D_ on maturing mycelium technology for use in the production of large scale board products, from low density (LD) particle board to acoustic panels and thermal insulati ...
SBIR Phase II 2018 Environmental Protection Agency -
An Enhanced Contact Plasma Reactor: A Competitive Remediation Technology for Per- and Perfluoroalkyl Substance (PFAS) Contaminated Water
SBC: DMAX PLASMA, INC. Topic: 17NCER1APerfluoroalkyl substances (PFASs) have received considerable attention due to their toxicity, ubiquitous presence and recalcitrance. Manufacture and disposal of PFAS-containing products has resulted in PFAS contamination of numerous water supplies. Recent reports indicate the Air Force alone is expecting to spend > $2.25 billion for cleanup for PFAS-contaminated sites. Thus, there is a huge market ...
SBIR Phase I 2018 Environmental Protection Agency -
A Novel, Nanostructured, Metal-organic Frameworks-Based Product Loss Prevention Technology in the Oil and Natural Gas Sector
SBC: FRAMERGY INC Topic: 17NCER2CTo reach the end user, oil and gas production at the wellhead must be transmitted through the country and distributed to a wide range of customers. This logistical system requires natural gas gathering lines, processing facilities, product storage tanks and lots of other equipment. What results is air pollution caused by industry losses during these operations and the use of continuous or intermit ...
SBIR Phase I 2018 Environmental Protection Agency -
Green Process for Plastic Chrome
SBC: VERGASON TECHNOLOGY INC Topic: 17NCER5BThis green approach to manufacturing plastic with decorative chrome will eliminate health and environmental hazards from the chrome electroplating process. The US and global market for decorative chrome on plastic is 12 million m2/year and 84 million m2/year respectively, with 80% in automobile trim, 10% in appliances and 10% in sanitary fixtures. Without a viable commercial alternative, US provid ...
SBIR Phase I 2018 Environmental Protection Agency -
Formulation and testing of an entirely wood-based exterior insulation board for the high-performance building market
SBC: GO Lab Inc. Topic: 17NCER6BThe goal of this project is the formulation a rigid, insulating, low-density wood composite, with physical and thermal properties comparable to fossil fuel derived foams. _x000D_ _x000D_ To achieve energy conservation standards mandated by certification agencies such as Passive House and LEED, high performance buildings require multiple shells of insulation – an inner shell that contains electri ...
SBIR Phase I 2018 Environmental Protection Agency -
Lead Acid Battery Monitoring, Diagnostics, and Prognostics
SBC: OCEANIT LABORATORIES INC Topic: A17023In this Phase II, Oceanit proposes to further the impedance approach and battery analyzer device developed in Phase I to demonstrate an optimized technique for monitoring, diagnosis and prognosis of lead acid batteries. Oceanit shall design an integrated lead-acid battery health monitoring tool prototype for testing in an operationally relevant environment. Impedance model will be further refined ...
SBIR Phase II 2018 Department of DefenseArmy -
Additive Manufacturing for RF Materials and Antennas
SBC: Delux Advanced Manufacturing, LLC Topic: A18020To reduce size, weight, power and cost (SWaP-c), military platforms have been evolving towards more integrated platforms that utilize all available space. For radiating systems, this will require exploring innovative design methods, materials and manufacturing approaches to realize cost-effective, customizable and conformal antennas. An attractive solution to this challenge is offered by additive ...
SBIR Phase I 2018 Department of DefenseArmy -
Advanced Direct Wideband Analog to Digital Conversion for Radar
SBC: HELIOS REMOTE SENSING SYSTEMS, INC. Topic: A18029Helios Remote Sensing Systems proposes to develop and demonstrate a direct wideband (WB) analog-to-digital conversion (ADC) capability for all types of radar systems to improve performance capability and reduce costs.Helios will define and develop a concept for a Direct Wideband ADC Digital Down converter that meets the requirements of advanced radar systems.We will demonstrate the feasibility of ...
SBIR Phase I 2018 Department of DefenseArmy -
Dynamic Collaborative Visualization Ecosystem (DynaCoVE)
SBC: OCEANIT LABORATORIES INC Topic: A18032Oceanit proposes to develop visual analytics tool to support collaborative decision making with high-dimensional variables using 2D, 2 1/2D, and 3D visualization with interaction for demonstration.
SBIR Phase I 2018 Department of DefenseArmy -
Low-cost Imager for Heavily Degraded Visual Environments
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: A18040This project aims to develop a low-cost millimeter-wave (mmW) imaging system for ground vehicles, to operate in combination with a long-wave infrared (LWIR) camera. Such a system will mitigate the challenges of driving in degraded visual environments (DVE) including night time, fog, dust, or smoke by providing real-time image of the vehicle surrounding independent from the presence of naturally oc ...
SBIR Phase I 2018 Department of DefenseArmy