You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ArrayFire-ML: An Accelerated Open Source Machine Learning Primitives Library
SBC: Accelereyes LLC Topic: SB132002Numerous machine learning frameworks exist, each with highly variable support for accelerated computing (e.g. Graphics Processing Units (GPUs), Field-Programmable Gate Arrays (FPGAs), etc). A library of machine learning primitives could support the many disparate frameworks and boost the advancement of machine learning research and programs, such as those underway in the DARPA Data-Driven Discover ...
SBIR Phase II 2018 Department of DefenseDefense Advanced Research Projects Agency -
Advanced Technologies for Reducing Decompression Obligation and Risk
SBC: CREARE LLC Topic: SB131004Despite over 100 years of research, decompression sickness (DCS) remains the mission-limiting factor in the design and execution of combat diving operations.Divers may spend over an hour decompressing after spending as little as ten minutes at the target depth.While decompressing, divers are limited in vertical mobility, making then susceptible to detection and threatening their survivability.This ...
STTR Phase II 2018 Department of DefenseDefense Advanced Research Projects Agency -
A Novel, Nanostructured, Metal-organic Frameworks-Based Product Loss Prevention Technology in the Oil and Natural Gas Sector
SBC: FRAMERGY INC Topic: 17NCER2CTo reach the end user, oil and gas production at the wellhead must be transmitted through the country and distributed to a wide range of customers. This logistical system requires natural gas gathering lines, processing facilities, product storage tanks and lots of other equipment. What results is air pollution caused by industry losses during these operations and the use of continuous or intermit ...
SBIR Phase I 2018 Environmental Protection Agency -
Phytoremediation of perfluoroalkyl substances (PFAS) via phytoextraction
SBC: NUTTER & ASSOCIATES, INC. Topic: 17NCER3ANAI has a strategy to identify plant species best suited for proof-of-concept testing for phytoremediation of perfluoroalkyl substances (PFAS) via phytoextraction. Phytoextraction refers to the uptake and translocation of contaminants in the soil by plant roots into the aboveground portions of plants. Once the phytoextraction concepts are proven at the bench-scale (Phase I) and followed with succe ...
SBIR Phase I 2018 Environmental Protection Agency -
Low-Cost Sensing Array for Infrasound
SBC: CREARE LLC Topic: DTRA172001Infrasound and seismic measurements are used by DTRA and the DoD for nuclear test monitoring, terrorist blast forensics, battle damage assessment, and environmental monitoring. However, these long wavelength physical signals are typically recorded through single-point sensors or sparse low density arrays. As a result, the critical signals of interest are often corrupted or masked by noise or inter ...
SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency -
Photovoltaic Cells for Very High Altitude Very Long Endurance Solar Aircraft
SBC: 4POWER LLC Topic: SB072043We propose a research and development path that leads to the creation of triple-junction, high efficiency (30%, and greater in time) III-V cells on 200mm Si substrates, manufactured in a volume-scalable 200mm silicon manufacturing infrastructure. This combination of efficiency, weight, and cost is not possible with any other technology. Our estimates show that specific weight, cost per W, and sp ...
SBIR Phase I 2007 Department of DefenseDefense Advanced Research Projects Agency -
Universal Imaging Sensor: Robotic Broadband Night Vision Camera
SBC: B & W TEK INC Topic: ST071009Imaging sensors are a crucial component of modern defense. The ideal sensor has acute visual sensing capabilities and communicates instantly when threats are identified. It should also have night vision capabilities and cover a broadband spectral range including near ultraviolet and infrared. A robotic broadband night vision camera is highly desirable. Such a robotic broadband low-light-level came ...
STTR Phase I 2007 Department of DefenseDefense Advanced Research Projects Agency -
High Efficient Photodetectors
SBC: CERMET, INC. Topic: DTRA07004The goal of this effort is to demonstrate an high efficient photodetector to replace the conventional photo multiplier tubes (PMT) in gamma radiation detection process. In the proposed effort. Cermet will grow and fabricate ZnO based photodetectors for the detector of scintillated light in the wavelength region between 340 and 430nm. The proposed technology will bring an improved, high efficient p ...
SBIR Phase I 2007 Department of DefenseDefense Threat Reduction Agency -
Small Scale Ethanol Drying
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: N/AThere continues to be a need for production of fuel-grade ethanol from agricultural sources. The Federal Government is actively looking for biomass renewable feed stocks for enhancing gasoline and reducing our dependence on foreign oil. Ethanol from agricultural sources has many advantages including development of fuel independence, and ethanol has significant value as an oxygenate and octane im ...
SBIR Phase I 2007 Environmental Protection Agency -
NanoEnhanced Toxic Industrial Chemicals Sensor
SBC: ENGENIUSMICRO LLC Topic: SB072001The detection and classification of toxic industrial chemicals (TICS) is an important capability to the nation’s defense forces, first responder units, and law enforcement, not to mention the more traditional needs in industrial monitoring and control, construction, and even household applications. First responders, in all levels of government, need to be warned of the presence and type of TICS ...
SBIR Phase I 2007 Department of DefenseDefense Advanced Research Projects Agency