You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Image Enhancement and Machine Learning for Improving Man-Portable Targeting Systems

    SBC: EM PHOTONICS INC            Topic: N172102

    Modern DoD applications are benefiting from the proliferation of EO/IR sensor technology. As imagers become cheaper and smaller, they are being more widely deployed for a variety of scenarios. This trend is exemplified by the Navys Future Targeting System (FTS), which will provide laser designation, laser spot imaging, and some target location functions in a single 5.5-pound unit, replacing discre ...

    SBIR Phase I 2018 Department of DefenseNavy
  2. Power Factor Correction

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N181005

    The primary objective of this Phase I proposal is to design, develop, and demonstrate the feasibility of a power factor compensation device for a 65 kVA, 115V, 400-Hz aircraft power system. Based on identified power factor conditions in the F-18 Super Hornet platform, the compensation system must correct an existing leading 0.98 power factor to a target lagging 0.93 (minimum objective lagging 0.97 ...

    SBIR Phase I 2018 Department of DefenseNavy
  3. A Novel, Nanostructured, Metal-organic Frameworks-Based Product Loss Prevention Technology in the Oil and Natural Gas Sector

    SBC: FRAMERGY INC            Topic: 17NCER2C

    To reach the end user, oil and gas production at the wellhead must be transmitted through the country and distributed to a wide range of customers. This logistical system requires natural gas gathering lines, processing facilities, product storage tanks and lots of other equipment. What results is air pollution caused by industry losses during these operations and the use of continuous or intermit ...

    SBIR Phase I 2018 Environmental Protection Agency
  4. Reduced Cavitation, High Efficiency Outboard Propulsors for Small Planing Craft

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N17AT019

    The Candent Technologies “Reduced Cavitation, High Efficiency Outboard Propulsor for Small Planing Craft” Phase II program is structured to develop an advanced waterjet propulsor for the Combat Rubber Raiding Craft (CRRC). This new axial flow waterjet propulsion system is designed as a “bolt on” assembly that replaces the lower unit of the existing MFE 55 outboard motor. This new propulsio ...

    STTR Phase II 2018 Department of DefenseNavy
  5. Multicore Fiber Optic Package Optical Subassembly for Wideband Digital and Analog Photonic Links

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: N182101

    In this SBIR effort we will develop a balanced detection analog photonic link consisting of a DFB laser, a dual-output high-speed, low-Vp mach-zehnder modulator (MZM) and a high-power, high-linearity balanced photodetector (BPD) using a dual-core, single mode, multicore fiber (MCF) that is supplied by our subcontractor, OFS. We will design, fabricate and characterize (phase I) the MZM and the BPD, ...

    SBIR Phase I 2018 Department of DefenseNavy
  6. Photonic Integrated Circuit Reliability

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: N182108

    Photonic integration, and specifically silicon photonics, has emerged as one of the leading solutions for maintaining or improving the performance of optical systems while addressing the requirements related to size, weight, and power (SWaP). Photonic integrated circuits (PICs), which integrate multiple photonic elements onto a single chip, are specifically suited to providing the complexity and f ...

    SBIR Phase I 2018 Department of DefenseNavy
  7. High Density, High Efficiency Electrical Power Generation

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N103207

    The movement to more-electric architectures during the past decade in military and commercial airborne systems continues to increase the complexity of designing and specifying the electrical power system in such architectures. In particular, electrical starter/generators (ES/G) on airborne systems have become much more complex in terms of design due to growth in electrical power and energy require ...

    SBIR Phase II 2018 Department of DefenseNavy
  8. SIMBA: Secure Messaging on the Blockchain Architecture

    SBC: INDIANA TOOL & MFG. CO., INC.            Topic: SB162004

    The secure messaging on a Blockchain architecture (SIMBA) project will architect and design a decentralized mobile peer-to-peer, end-to-end, secure messaging application that uses Blockchain technology. We aim to build SIMBA from the Fabric (Open Blockchain) implementation due to its novel approach to smart contracts using chaincode services and several other features including membership, consens ...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  9. Low Voltage Power Sources for Long-Life Electronics

    SBC: TALOSTECH LLC            Topic: SB163009

    There is a critical need for DoD to develop power sources that will increase the mission lifetime for unattended sensors and sensor radio networks. In order to take advantage of recent advances in extremely low power subthreshold circuits to greatly exte...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  10. Materials Development for Affordable Maritime Compatible Radio Frequency Materials

    SBC: SPECTRUM MAGNETICS LLC            Topic: N162117

    This Phase I SBIR proposal aims to develop flexible and maritime compatible radio frequency (RF) materials for microwave absorbing material applications and antenna applications at GHz frequencies. Based on the deep understanding of material physics for high frequency properties, and extensive experience in fabricating and supplying RF materials, Spectrum Magnetics proposes several material platfo ...

    SBIR Phase I 2017 Department of DefenseNavy
US Flag An Official Website of the United States Government