You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Hybrid Laser Arc Welding for Thick Plate High Performance Steels

    SBC: TECHKNOWSERV CORP            Topic: 132FH1

    Welding of HPS70W is well understood when using submerged arc welding (SAW) and shielded metal arc welding (SMAW) techniques. A Welding Advisory Group (WAG) which consisted of technical advisors from the Navy, AISI, and FHWA, major filler metal manufacturers, and steel producers determined the guidelines for welding HPS70W. As a result, comprehensive guidelines and welding procedures exist for SAW ...

    SBIR Phase II 2015 Department of Transportation
  2. Happy Atoms

    SBC: Schell Games LLC            Topic: edIES15R0008

    Video Demonstration of the Phase I Prototype: http://youtu.be/vS0XzzPl3iU Purpose: This project will develop and test Happy Atoms, a physical modeling set and an interactive iPad app for use in high school chemistry classrooms. Happy Atoms is designed to facilitate student learning of atomic modeling, a difficult topic for chemistry high school students to master. Standard instructional practice ...

    SBIR Phase II 2015 Department of EducationInstitute of Education Sciences
  3. Whimbrel Unmanned Aircraft System-Borne Atmospheric and Sea Surface Temperature (SST) Sensor

    SBC: PIASECKI AIRCRAFT CORP            Topic: 845RWP

    Piasecki Aircraft (PiAC) proposes to continue development and testing efforts of the Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel USA has been developed to support the Tropical Cyclone Boundary Layer mission requirements and contains sensors an ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    This proposal leverages our current DOT-funded SBIR Phase II project developing software to assist truck drivers and companies to fatigue optimize driver scheduling and route planning. This project will build a set of web-services specially designed to provide objective quantitative feedback to truck drivers, dispatchers, and safety managers about fatigue from fatigue stressors common in trucking ...

    SBIR Phase II 2015 Department of Transportation
  5. Compact Laser Shearography System for Crack Detection

    SBC: Laser Technology Inc.            Topic: 05FH1

    Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...

    SBIR Phase II 2008 Department of Transportation
  6. Low Cost Transverse Rail Defect Detector

    SBC: Mide Technology Corporation            Topic: 02FR1

    Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...

    SBIR Phase II 2008 Department of Transportation
  7. An Investigation of Feasibility of Adapting the Arlyn Arm Workstation for the Educational Use of People with Disabilities

    SBC: Arlyn Toolworks            Topic: N/A

    The prototype Arlyn Arm Workstation, a robotic arm workstation, created, designed, and built by Arlyn Toolworks will be modified to makeit transportable and capable of handling items such as textbooks and lunch used in an educational setting. Then the resulting device, the Arlyn Arm Transportable will then be tested by students performing educational tasks and reviewed by teachers, occupational t ...

    SBIR Phase II 1997 Department of Education
  8. Innovative Multi-cellular Pultruded Composite Guardrail

    SBC: Creative Pultrusions, Inc            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Transportation
  9. Advanced Software for Interactive Learning of Applied Mathematics

    SBC: Quantum Simulations, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
  10. Instrumented Anchor Pin for Heavy Truck Brake

    SBC: Stratcom International Llc            Topic: N/A

    The bonded resistance strain gage has made possible a varety of force sensing transducers, commonly known as "load cells." Widely used types of load cells include the column, the bending beam, the ring, the circular plat and the shear web. To instrument the anchor pins used in heavy truck air braking systems, STRAINSERT will utilize proven research and evaluation techniques implemented during th ...

    SBIR Phase II 1997 Department of Transportation
US Flag An Official Website of the United States Government