You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Hybrid Acoustic Emission and Guided Wave Inspection System for Radar Tower Structures

    SBC: FBS INC            Topic: AF161011

    A novel hybrid acoustic emission (AE) and guided wave (GW) inspection approach for radar towers inspection is presented. Keeping aging radar sites (many are over 50 years old) in good repair is important because they are critical intelligence components that provide advanced aircraft notification. This proposed work will continue development of new, patent-pending shear-type AE sensors, and apply ...

    SBIR Phase II 2018 Department of DefenseAir Force
  2. Nonlinear Ultrasonic Guided Wave System for Detection of SCC

    SBC: FBS INC            Topic: AF161017

    Sudden structural failure caused by stress corrosion cracking (SCC) in aircraft components is becoming a severe safety threat to Air Force aircraft and other aviation vehicles. Detection of SCC often occurs late in the damage development cycle, in which fast-growing macroscale cracking has already developed. This significantly increases depot maintenance cost and can negatively impact aircraft ava ...

    SBIR Phase II 2018 Department of DefenseAir Force
  3. Wafer-Level Electronic-Photonic Co-Packaging

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF16AT01

    In phase II work, we will collaborate with Prof. Stefan Preble in RIT and continue to develop large scale hybrid integration and packaging techniques for key active photonic components such as lithium niobate on insulator (LNOI) modulators and modified uni-traveling (MUTC) photodiodes. We will demonstrate a low V, broadband, small footprint LNOI modulator with hybrid Si/LN or SiN/LN waveguide usin ...

    STTR Phase II 2018 Department of DefenseAir Force
  4. Development of Room-Temperature Ionic Liquids for Reversible Electroplating

    SBC: BORON SPECIALTIES LLC            Topic: AF16AT20

    This phase 2 proposal builds upon Phase 1 successes, with plans for the construction of an electrochemical variable emissivity device (EC VED). The viability of this EC VED will be determined by the development of a new family of ionic liquid (IL) electrolytes featuring polyhedral boron cages as the anionic component. In these new electrolytes, the negligible vapor pressures and high ionic conduct ...

    STTR Phase II 2018 Department of DefenseAir Force
  5. Instant k-Space Tomography for Spatial-Spectral Monitoring

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF17AT013

    The Army is frequently forced to operate in hostile climates. Heavy fog, rain, snow, and dust storms can inhibit the performance of tracking technologies such as mid-wave infrared cameras. In such conditions, Army early warning systems are blinded and put personnel and assets at risk.There is a specific need for a degraded visual environment (DVE) penetrative target tracking solution.Radio frequen ...

    STTR Phase II 2018 Department of DefenseAir Force
  6. Wideband Efficient Dual Polarized High Frequency (HF) Communication Antenna

    SBC: SABRE SYSTEMS INC            Topic: AF161137

    This program is the next step in the development of a wideband dual polarized HF antenna covering 3 to 30 MHz supporting transmit and receive functions with instantaneous bandwidth of 10 MHz. A prototype design was developed in Phase I of this program. This design included the use of lossy impedance matching techniques for the horizontal and vertical transmit antennas. This ground based antenna de ...

    SBIR Phase II 2018 Department of DefenseAir Force
  7. Theater Weather Imaging and Cloud Characterization Sensor (TWICCS)

    SBC: BRANDYWINE PHOTONICS LLC            Topic: AF171073

    Theater Weather Imaging and Cloud Characterization Sensor (TWICCS) payload for the MetNet-1 Small Satellite will demonstrate the capabilities of a push-frame, multispectral imager in acquiring high quality weather data covering from the Visible through Longwave Infrared. Data products supported include Theater Weather Imaging products (ie. discrimination of ground fog, dust, and smoke, etc.) and C ...

    SBIR Phase II 2018 Department of DefenseAir Force
  8. High Voltage (HV) Fireset Systems and Subsystem Component Level Designs

    SBC: HYPERION TECHNOLOGY GROUP INC            Topic: AF171089

    If the work proposed herein is successful, AFR/DOD would have two new next generation Firesets capable of significantly advancing the testing capabilities of current Firesets to support future hydrocode simulation/modeling of insensitive initiators/EFIs. The two Fireset Systems to be delivered as a result of the proposed Phase II SBIR would first include a refined System 1 design within the first ...

    SBIR Phase II 2018 Department of DefenseAir Force
  9. Develop integrated analog photonic modulator components compatible with photonic foundry production

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF171126

    In phase II work, we will collaborate with Prof. Dennis W. Prather in UD and continue to develop broadband, low VÏ€, high linearity, thin-film lithium niobate on insulator (LNOI) modulators that are fully compatible with silicon photonic integrated circuits (PIC) foundry processes. We will demonstrate a low VÏ€, broadband, small footprint LNOI modulator with hybrid Si/LN or SiN/LN waveguide ...

    SBIR Phase II 2018 Department of DefenseAir Force
  10. Identification and Resolution of Events

    SBC: INTUIDEX INC            Topic: AF083055

    ABSTRACT:The Air Force has a need to maintain strong intelligence capability in semi-permissive and anti-access area denial (A2/AD) scenarios where full-motion video (FMV)-based surveillance assets are rare or unavailable. In such environments, priority is given to leveraging any and all other sources of intelligence available, which may include ?open sources? of data available on the public Web, ...

    SBIR Phase II 2015 Department of DefenseAir Force
US Flag An Official Website of the United States Government