You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Innovative Approaches to Produce Narrow, Long and Curved Core Passages in Large Metallic Investment Castings
SBC: ATS-MER, LLC Topic: N131001In the Phase II of this program, work will be focused on producing controlled solidification investment cast (CSIC) articles with net shape, complex, narrow, long, and curved channels within an aluminum alloy article representing military gearbox housing. The program has strict requirements for the materials and techniques used to produce the channel forming core. The produced technical solutions ...
SBIR Phase II 2014 Department of DefenseNavy -
Efficient Cargo and Personnel Handling System
SBC: SAFE INC Topic: N131014The cargo and personnel handling system in the C-2 Greyhound is functionally behind most cargo capable aircraft in the U.S. military. The current cargo and personnel handling system utilized on the C-2 requires enormous manpower efforts to load/unload cargo. Depending on the size of cargo, passenger seating must be removed in order to load the aircraft, and then reinstalled for passenger use. Exce ...
SBIR Phase II 2014 Department of DefenseNavy -
Non-Mechanically Moving Solar Directing System for Photovoltaic Modules
SBC: TIPD LLC Topic: N131019A key focus of the United States government?s energy policy is to develop technologies that will allow the country to reduce Green House Gases by 80% by 2050. In support of this effort, the US Secretary of the Navy has developed a set of energy goals which include producing at least 50% of shore-based energy requirements using alternative sources primarily solar power. We have developed two thin ...
SBIR Phase II 2014 Department of DefenseNavy -
Dynamic Frequency Passive Millemeter-Wave Radiometer Based on Optical Up-Conversion
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: 94Passive microwave sensors aboard satellites provide valuable information regarding weather conditions by measuring atmospheric attenuation over a broad range of frequencies from 0-200 GHz. Additional ground-based sensors are desirable to provide complementary upward looking measurements that can be used to refine existing attenuation models. Operating over such a large bandwidth, however, places ...
SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration -
Direct Digital Fabrication and Characterization of New Low Cost Titanium Alloys
SBC: ATS-MER, LLC Topic: N122123The objective is to develop and demonstrate new high performance aerospace alloys suitable for direct digital manufacturing (DDM). The shift from conventional titanium ingot metallurgy to DDM manufacturing provides the capability to develop alloy compositions which exhibit enhanced exemplary properties and at significantly lower cost in near/net shapes. The Phase I demonstrated titanium alloys wit ...
SBIR Phase II 2014 Department of DefenseNavy -
Automated Analysis and Verification of Application Program Interfaces (APIs)
SBC: DataSoft Corp. Topic: N093227The DataSoft Interface Verification Application (DIVA) provides an automated robust solution for accurate and repeatable verification of developer source code compliance to a set of Standard API"s. DIVA generates customized compliance reports for the user that accurately summarize all vendor deviations from the standard API. In addition, DIVA can verify a single API file or all of the API files in ...
SBIR Phase II 2014 Department of DefenseNavy -
Secure wireless access points for tactical radios
SBC: DataSoft Corp. Topic: AF071072Secure-Private Area Network (S-PAN) provides a secure, short-range wireless link between COTS end user devices (smartphones/tablets) and associated tactical radios. The tactical radios provide for communications over longer ranges to applications served to the user devices running on secured backend networks. The DoDs field integration and test activities held during NIE 12.1 and 12.2 at the Ft. ...
SBIR Phase II 2014 Department of DefenseNavy -
Paragon Dive System (PDS)
SBC: PARAGON SPACE DEVELOPMENT CORPORATION Topic: CBD02201Terrorist attacks (e.g. USS Cole, chemical and biological warfare) and accident recovery (e.g. TWA 800, Ehime Maru) can require extensive Navy dive operations in contaminated, hazardous environments. However, current diving equipment was not designed to operate in such conditions, much less protect divers from exposure to contaminants in the water. These environments are so severe that equipment d ...
SBIR Phase II 2014 Department of DefenseNavy -
Weaponized Heating of Ignited Plasma (WHIP)
SBC: Geost, Inc. Topic: N113171GEOST and the University of Arizona propose to develop and demonstrate the Weaponized Heating of Ignited Plasma Acoustic Modulation (WHIP-AM). This device produces acoustic signals at long range thereby providing the capability to convey messages and produce irritating acoustic tones. Through these effects WHIP-AM will provide the long range capability to determine intent, affect behavior, and com ...
SBIR Phase II 2014 Department of DefenseNavy -
Fully autonomous retrieval, turnaround, and launch for a long-endurance UAV with VTOL capability
SBC: Aerovel Corporation Topic: N09T001We propose to develop techniques and equipment for fully automated retrieval, refueling/ recharging, and relaunch of Aerovel"s Flexrotor. Our method would be suitable for use on a small platform such as a boat in a choppy sea. It would allow the ground-handling cycle to be performed remotely with no manual intervention, and so enable extended missions through remote unattended sites. Planned work ...
STTR Phase II 2011 Department of DefenseNavy