You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. IM Modeling/Simulation Tool for KEI Dynamic/Thermal Loads Associated with Stage Separation

    SBC: COMBUSTION RESEARCH AND FLOW TECHNOLOGY INC            Topic: MDA06041

    Intense dynamic and thermal loads will occur during stage-separation events that are of major concern from both operational and safety viewpoints. The insensitive-munitions (IM) stimuli and thermal/dynamic response associated with such events has received very little attention, yet this is of major concern for the KEI vehicle undergoing Stage 1 to Stage 2 separation. The KEI event is at lower alti ...

    SBIR Phase II 2008 Department of DefenseMissile Defense Agency
  2. Optimal Sensor Scheduling for Ballistic Missile Defense

    SBC: DANIEL H. WAGNER ASSOCIATES, INCORPORATED            Topic: MDA06009

    Our Phase I research involved the development of an innovative sensor scheduling algorithm in support of Ballistic Missile Defense. This algorithm schedules multiple diverse and distributed sensors to perform time-critical tasks relating to multiple moving targets; specifically, to detect, classify, localize, track, support the interception of, and conduct BDA for ballistic missiles throughout t ...

    SBIR Phase II 2008 Department of DefenseMissile Defense Agency
  3. Safe High Power (High Rate) Lithium Battery for MKV (Missiles) with Long storage Life

    SBC: LithChem Energy / Div. of TOXCO, inc.            Topic: MDA06026

    r

    SBIR Phase II 2008 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government