You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Developing Model-Based Tools for the Design and Improvement of Manufacturing Systems
SBC: MBSE Tools, Inc. Topic: NAThe vision is to create enterprise-grade software tools supporting the design and improvement of manufacturing systems, tools that can provide answers to fundamental business questions about product selection, resource planning, scheduling, and logistical control – quickly, accurately, and with adequate consideration of risk. Objectives accomplished in Phase I included adding formality and rigor ...
SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology -
Infrasonic Detection of Avalanches
SBC: Chinook Engineering, Inc. Topic: N/AN/A
SBIR Phase II 2001 Department of Commerce -
Ozone Disinfection Process for Shrimp Aquaculture
SBC: Manning International Chemical Systems Topic: N/AN/A
SBIR Phase II 2001 Department of Commerce -
N/A
SBC: Pathway Technologies, Inc Topic: N/ABased on the outline for a theory of intelligence, and using NIST's hierarchical real-time control system (RCS) architecture, in Phase I, we developed proof-of-concept OpenSim and OpenAnimation toolboxes consisting of the following innovations, namely, (i) Simulation and Animation Software Design that will seamlessly interface with RCS Hierarchy, (ii) Knowledge hierarchy consistent with the f ...
SBIR Phase II 2001 Department of Commerce