You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Cost Competitive Wave Energy Without Moving Parts
SBC: OSCILLA POWER INC Topic: 815Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
HF Radar Calibration with Automatic Identification System Ships of Opportunity
SBC: CODAR OCEAN SENSORS, LTD Topic: 841Over 300 HF RADARs worldwide are producing ocean surface data that is used in oil spill response, search & rescue, vessel traffic management, and research. In the U.S. there are 100+ systems supplying real-time data to the Coast Guard, NOAA IOOS, OR&R and other operational groups. To provide the highest quality data to stakeholders, systems should be calibrated by measuring the receive antenna p ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/ASEVERAL STATES ARE CURRENTLY SEEKING MUCH-NEEDED NEW LOW-LEVEL RADIOACTIVE DISPOSAL SITES IN ACCORDANCE WITH THE LOW-LEVEL RADIOACTIVE WASTE POLICY ACT OF 1980. ANY NEW COMMERCIALREQUIREMENT THAT A SITE BE CAPABLE OF BEING MODELED AND THATITS PERFORMANCE BE ASSURED FOR 500 YEARS. FOR MOST SITES, THE HYDROGEOLOGICAL AND RADIONUCLIDE TRANSPORT CHARACTERIS- TICS OF THE UNSATURATED ZONE ARE MAJOR FACT ...
SBIR Phase II 1989 Nuclear Regulatory Commission -
IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA
SBC: Modeling & Computing Services Topic: N/AIT IS NECESSARY TO ESTIMATE J-R OR JI DATA FOR AGING AND RE-SIDUAL LIFE STUDIES, USING DATA FROM SURVEILLANCE CAPSULE SPECIMENS THAT REFLECT THE CURRENT STATE OF THE PRESSURE VESSEL STEEL. AN IMPROVED MODEL IS NEEDED THAT WILL PREDICT J J-R DATA FROM CHARPY DATA, TENSILE PROPERTIES, MATERIAL COM-POSITION AND OTHER MEASURABLE PROPERTIES. SUCH A MODEL WILLBE DEVELOPED UNDER THIS PROJECT, USING INNOV ...
SBIR Phase II 1989 Nuclear Regulatory Commission