You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DISPENSER STRUCTURE

    SBC: Abaris            Topic: N/A

    THIS PROJECT IS TO EXAMINE THE STRUCTURAL REQUIREMENTS OF A MUNITIONS DISPENSER, AND IDENTIFY COMPOSITE MATERIALS AND THEIR APPLICATION TO DESIGNS THAT WOULD REDUCE PARASITIC STRUCTURAL WEIGHT BY 30%. THERE ARE A VARIETY OF FIBERS, RESINS, AND MANUFACTURING PROCESSES THAT HAVE THE POTENTIAL FOR ACHIEVING SIGNIFICANT WEIGHT REDUCTION. AS THE PROPERTIES AND COSTS OF COMPLETED COMPONENTS VARYWITH MAN ...

    SBIR Phase I 1984 Department of DefenseAir Force
  2. EMERGENCY BREATHING APPARATUS UTILIZING HYDROGEN PEROXIDE

    SBC: Abel Company            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  3. LEARNING SYSTEMS FOR ELECTRONIC COMBAT APPLICATIONS (LSECA)

    SBC: ABTECH CORPORATION            Topic: N/A

    ADVANCES IN ELECTRONIC COMBAT APPLICATIONS WILL SIGNIFICANTLY INCREASE THE ABILITY OF PILOTS TO OUTPERFORM A LARGE NUMBER OF ADVERSARIES IN ENVIRONMENTS WHERE THERE IS AN EXTREME INFORMATION PROCESSING BURDEN. THE NUMBER OF FACTORS PILOTS MUST CONSIDER IN MAKING ELECTRONIC COMBAT RELATED DECISIONS IS VERY HIGH AND OFTEN INVOLVE UNKNOWN RELATIONSHIPS THAT MUST BE LEARNED FROM EXPERIENCE. IN ADDITIO ...

    SBIR Phase I 1988 Department of DefenseAir Force
  4. Wide Temperature, High Energy Density Capacitors for Power System Conditioning

    SBC: Active Signal Technologies, Inc.            Topic: OSD09EP4

    Active Signal Technologies, in collaboration with Novacap and Alfred University, will advance the development of two bismuth sodium titanate (NBT) ceramic materials with very promising dielectric properties across the temperature range -55°C to 300°C. The work will include enhanced formulation variants and improved processing techniques to optimize for permittivity, loss, breakdown voltage and ...

    SBIR Phase I 2009 Department of DefenseAir Force
  5. Lightweight Virtualization to Detect, React, and Adapt to Cyber Attacks

    SBC: ZEPHYR SOFTWARE LLC            Topic: OSD09IA3

    Many software defenses against reverse engineering, piracy, and tampering rely on disabling the software when such attacks are detected. The proposed research makes innovative use of proces-level software virtualization on a per-application basis to defeat such attacks without disabling the software. The virtualization technology keeps normal operational run time overhead low, invoking more expens ...

    SBIR Phase I 2009 Department of DefenseAir Force
  6. A Novel Microwave Sensor for Non- Destructive Evaluation of Silicon Nitride Bearing Balls

    SBC: ALPHASENSE, INC.            Topic: AF083109

    In this proposal, Alphasense, Inc. details the development of a novel microwave NDE sensor for defect inspections in silicon nitride bearing balls. The key innovations of this proposal include the following: a) the use of the spherical bearing ball as a dielectric resonator, thus enabling us to correlate the resonance characteristics of the bearing ball with various defects; b) the measurements in ...

    SBIR Phase I 2009 Department of DefenseAir Force
  7. Anti-Jam Improvements by Combining Remotely Located Global Positioning System (GPS) Antennas on an Unpiloted/Uninhabited Aerial Vehicle (UAV) Platform

    SBC: Applied EM Inc.            Topic: AF083159

    Currently, there are two types of antenna configurations which are used with GPS receivers, fixed reception pattern antenna (FRPA) and controlled reception pattern antenna (CRPA). FRPA is a single element antenna and can not use angle of arrival as a discriminator to suppress interfering or jamming signals. CRPA is an array of antenna elements with the ability to reject interference signals. Many ...

    SBIR Phase I 2009 Department of DefenseAir Force
  8. N/A

    SBC: Arctec Engineering Inc            Topic: N/A

    THIS PROJECT WILL EXAMINE THE PROCESS OF WAVE EROSION OF FROZEN OR PARTIALLY FROZEN SLOPES. THE SPECIFIC APPLICATION IS THE EROSION OF UNPROTECTED CAUSEWAY BERMS BEING CONSTRUCTED IN THE ARCTIC. THE RATE EROSION, THE NEED FOR SLOPE PROTECTION (OR NON-NEED), AND THE TYPE OF SLOPE PROTECTION REQUIRED WILL BE IDENTIFIED. THE TEST WILL BE CONDUCTED AT PROTOTYPE SCALE TO CORRECTLY MODEL THE THERMAL ERO ...

    SBIR Phase I 1984 Department of the Interior
  9. UNOBTRUSIVE REAL-TIME MONITORING OF PILOT MENTAL STATUS: DEVELOPMENT OF A TEST-BED SYSTEM

    SBC: Ard Corp.            Topic: N/A

    THE REAL-TIME DETERMINATION OF PILOT MENTAL STATUS IS A CRITICAL FEATURE OF THE WORKLOAD MONITORING AND MINDWARE SUBSYSTEMS THAT HAVE BEEN ENVISIONED FOR FUTURE FIGHTER AIRCRAFT, INCLUDING THE VIRTUALWORLD SUPER-COCKPIT. RECENT LABORATORY AND SIMULATOR STUDIES, SOME CONDUCTED BY ARD, HAVE SUGGESTED THE VALUE OF VARIOUS BEHAVIORAL AND PHYSIOLOGICAL INDICES FOR REFLECTING OPERATIONALLY RELEVANT MENT ...

    SBIR Phase I 1988 Department of DefenseAir Force
  10. GAASP TOP SOLAR CELLS FOR INCREASED SOLAR CONVERSION EFFICIENCY

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
US Flag An Official Website of the United States Government