You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Arctec Engineering Inc            Topic: N/A

    THIS PROJECT WILL EXAMINE THE PROCESS OF WAVE EROSION OF FROZEN OR PARTIALLY FROZEN SLOPES. THE SPECIFIC APPLICATION IS THE EROSION OF UNPROTECTED CAUSEWAY BERMS BEING CONSTRUCTED IN THE ARCTIC. THE RATE EROSION, THE NEED FOR SLOPE PROTECTION (OR NON-NEED), AND THE TYPE OF SLOPE PROTECTION REQUIRED WILL BE IDENTIFIED. THE TEST WILL BE CONDUCTED AT PROTOTYPE SCALE TO CORRECTLY MODEL THE THERMAL ERO ...

    SBIR Phase I 1984 Department of the Interior
  2. N/A

    SBC: BUSBY ASSOCIATES INC.            Topic: N/A

    SUBSEA OIL AND GAS PRODUCTION SYSTEMS ARE FINDING INCREASING APPLICATION AS THE DEPTHS AND ENVIRONMENTS FROM WHICH PRODUCTION WILL TAKE PLACE BECOME MORE DEMANDING. SOME OF THESE ENVIRONMENTS, SPECIFICALLY THE ARCTIC, WILL NOT PERMIT UTILIZATION OF CONVENTIONAL UNDERWATER INTERVENTION TECHNIQUES OWING TO THE ICE COVER. TO ASSURE SAFE AND POLLUTION-FREE OPERATION OF THESE STRUCTURES WILL REQUIRE DE ...

    SBIR Phase I 1984 Department of the Interior
  3. ON-LINE PLANT ANALYZER UTILIZATION IN CONTROL ROOM FOR SURVEILLANCE OF PLANT SAFETY

    SBC: Dynatrek Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  4. INTERGRATING FIBER OPTIC RADIATION DOSIMETER

    SBC: Quantix Corp            Topic: N/A

    N/A

    SBIR Phase I 1986 Nuclear Regulatory Commission
  5. A TEST METHOD FOR RELIAVLY AND EASILY EVALUATING THE CONDITION OF A REACTOR COOLANT PUMP (RCP) SHAFT WHEN THER E IS ONLY LIMITED ACCESS TO THE SHAFT AT THE COUPLING WOULD ENABLE THE NUCLEAR INDUSTRY TO EVALUATE THESE SHAFT SYSTEMS ON SITE.

    SBC: Rem Technologies Inc.            Topic: N/A

    A TEST METHOD FOR RELIAVLY AND EASILY EVALUATING THE CONDITION OF A REACTOR COOLANT PUMP (RCP) SHAFT WHEN THER E IS ONLY LIMITED ACCESS TO THE SHAFT AT THE COUPLING WOULD ENABLE THE NUCLEAR INDUSTRY TO EVALUATE THESE SHAFT SYSTEMS ON SITE. THIS PROJECT PROVIDES A TESTING METHOD WHICH CAN BEAPPLIED TO IDENTIFY THE PRESENCE, SIZE, AND LOCATION OF SHAFT CRACKS IN A VERTICAL RCP SHAFT SYSTEM. CONFIRMA ...

    SBIR Phase I 1986 Nuclear Regulatory Commission
  6. IZATION

    SBC: Waste Management Group Inc.            Topic: N/A

    AT PRESENT, THE INDUSTRY USES MANY DIFFERENT METHODS TO CHARACTERIZE HARDWARE IN TERMS OF TIS RADIONUCLIDE CONTENT AT THE TIME OF DISPOSAL. ALL OF THES METHODS INVOLVE SOME FORM OF COMPONENT RADIATION PROFILING TO OBTAIN CO-60 ES ESTIMATES COUPLED WITH SCALING OF 10CFR PART 61 LONG LIVED NUCLIDES FOUND IN HARDWARE. UNDERWATER RADIATION PROFILES ARE OBTAINED UNDER DIFFERENT CONDITIONS, WITH DIFFERE ...

    SBIR Phase I 1986 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government