You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Advanced Digital Man-Machine Interface Analysis

    SBC: Ryan Nuclear, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. N/A

    SBC: Arctec Engineering Inc            Topic: N/A

    THIS PROJECT WILL EXAMINE THE PROCESS OF WAVE EROSION OF FROZEN OR PARTIALLY FROZEN SLOPES. THE SPECIFIC APPLICATION IS THE EROSION OF UNPROTECTED CAUSEWAY BERMS BEING CONSTRUCTED IN THE ARCTIC. THE RATE EROSION, THE NEED FOR SLOPE PROTECTION (OR NON-NEED), AND THE TYPE OF SLOPE PROTECTION REQUIRED WILL BE IDENTIFIED. THE TEST WILL BE CONDUCTED AT PROTOTYPE SCALE TO CORRECTLY MODEL THE THERMAL ERO ...

    SBIR Phase I 1984 Department of the Interior
  6. N/A

    SBC: BUSBY ASSOCIATES INC.            Topic: N/A

    SUBSEA OIL AND GAS PRODUCTION SYSTEMS ARE FINDING INCREASING APPLICATION AS THE DEPTHS AND ENVIRONMENTS FROM WHICH PRODUCTION WILL TAKE PLACE BECOME MORE DEMANDING. SOME OF THESE ENVIRONMENTS, SPECIFICALLY THE ARCTIC, WILL NOT PERMIT UTILIZATION OF CONVENTIONAL UNDERWATER INTERVENTION TECHNIQUES OWING TO THE ICE COVER. TO ASSURE SAFE AND POLLUTION-FREE OPERATION OF THESE STRUCTURES WILL REQUIRE DE ...

    SBIR Phase I 1984 Department of the Interior
  7. ON-LINE PLANT ANALYZER UTILIZATION IN CONTROL ROOM FOR SURVEILLANCE OF PLANT SAFETY

    SBC: Dynatrek Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  8. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government