You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: BUSBY ASSOCIATES INC.            Topic: N/A

    SUBSEA OIL AND GAS PRODUCTION SYSTEMS ARE FINDING INCREASING APPLICATION AS THE DEPTHS AND ENVIRONMENTS FROM WHICH PRODUCTION WILL TAKE PLACE BECOME MORE DEMANDING. SOME OF THESE ENVIRONMENTS, SPECIFICALLY THE ARCTIC, WILL NOT PERMIT UTILIZATION OF CONVENTIONAL UNDERWATER INTERVENTION TECHNIQUES OWING TO THE ICE COVER. TO ASSURE SAFE AND POLLUTION-FREE OPERATION OF THESE STRUCTURES WILL REQUIRE DE ...

    SBIR Phase I 1984 Department of the Interior
  2. CONTINUOUS FURNACE FOR FERROCHROMIUM PRODUCTION

    SBC: CENTER FOR INNNOVATION, INC.            Topic: N/A

    INTEREST HAS DEVELOPED IN THE REDUCTION OF MINERALS BY A 150KW LABORATORY MODEL OF THE ROTARY PLASMA ARC FURNACE (RPAF) PARTICULARLY FOR CONTINUOUS PREPARATION OF FERROCHROMIUM FROM DOMESTIC CHROMITE FINES. ALL SUPPORT, TO DATE IS IN PROCESS DEVELOPMENT BUT A LARGER IMPROVED PROTOTYPE IS NEEDED FOR IMPROVED FURNACE COMPARISON DATA. THIS IS A DIFFICULT DESIGN PROBLEM BECAUSE OF THE HIGH SENSITIVITY ...

    SBIR Phase I 1984 Department of the Interior
  3. N/A

    SBC: Water Engineering & Technology            Topic: N/A

    QUANTITATIVE GEOMORPHIC GUIDELINES ARE LACKING FOR THE DESIGN AND CONSTRUCTION OF RECLAIMED SURFACE MINE TOPOGRAPHY. STABLE TOPOGRAPHY IS NECESSARY FOR RECLAIMED AREAS IN ORDER TO REDUCE SEDIMENT POLLUTION TO OFFSITE AREAS, TO ALLOW RAPID DEVELOPMENT OF VEGETATION, AND TO MEET STATE AND FEDERAL LAWS. GUIDELINES FOR GEOMORPHIC DESIGN OF STREAM CHANNEL NETWORKS WILL BE DEVELOPED FROM ANALYSIS OF NAT ...

    SBIR Phase I 1984 Department of the Interior
US Flag An Official Website of the United States Government