You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Real-Time Planning and Training System to Improve Long-Term Care Disaster Prepare

    SBC: Benten Technologies Inc            Topic: N/A

    DESCRIPTION (provided by applicant): The primary long-term goal of this project is to develop a user-friendly, online all-hazards planning and site- specific training system with an information sharing framework with real-time data aggregation available fo r access by the long term care (LTC) facility, other LTC facilities and ancillary and cooperating agencies. The overall goal of REALPREP is imp ...

    SBIR Phase I 2009 Department of Health and Human ServicesCenters for Disease Control and Prevention
  2. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: MANUFACTURING LABORATORIES, INC.            Topic: DLA08001

    Significant advances have been made in machining technology, most notably machining centers capable of spindle speeds and feedrates that are an order of magnitude higher than conventional. However, the use of this new technology requires much more technical expertise, and experience and intuition are no longer sufficient. Specifically, machine tool productivity can be greatly enhanced if informati ...

    SBIR Phase I 2009 Department of DefenseDefense Logistics Agency
  3. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: Luna Innovations Incorporated            Topic: DLA08001

    Wet installation of fasteners offers proven corrosion protection and fuel sealing in aircraft structures, but it''''s a labor-intensive, messy, hazmat-laden process whose quality can vary significantly from fastener to fastener. Under a Navy SBIR Phase II, SMRC has developed a proprietary process called QwikSeal® for pre-coating fasteners with cure-blocked sealant, then overcoating the pre-applie ...

    SBIR Phase I 2009 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government