You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: ADVANCED POWDER SOLUTIONS INC            Topic: DLA08001

    Understanding that saving weight without sacrificing performance on a vehicle is important, the objective of this program is to continue to demonstrate advanced lightweight materials that can have multi-functional capability and be discretely made into parts for DLA. Many applications will have specific requirements of high thermal conductivity, low thermal conductivity, radiation resistance, Mod ...

    SBIR Phase I 2009 Department of DefenseDefense Logistics Agency
  2. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: Luna Innovations Incorporated            Topic: DLA08001

    Wet installation of fasteners offers proven corrosion protection and fuel sealing in aircraft structures, but it''''s a labor-intensive, messy, hazmat-laden process whose quality can vary significantly from fastener to fastener. Under a Navy SBIR Phase II, SMRC has developed a proprietary process called QwikSeal® for pre-coating fasteners with cure-blocked sealant, then overcoating the pre-applie ...

    SBIR Phase I 2009 Department of DefenseDefense Logistics Agency
  3. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: Systems & Materials Research Corporation            Topic: DLA08001

    Wet installation of fasteners offers proven corrosion protection and fuel sealing in aircraft structures, but it''''s a labor-intensive, messy, hazmat-laden process whose quality can vary significantly from fastener to fastener. Under a Navy SBIR Phase II, SMRC has developed a proprietary process called QwikSeal® for pre-coating fasteners with cure-blocked sealant, then overcoating the pre-applie ...

    SBIR Phase I 2009 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government