You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Tube Launched UAS with Modular Payload Bays and Interfaces
SBC: Brock Technologies, Inc. Topic: AF083006The submarine communitys critical need for advanced payload and expanded flight-envelop capable small Unmanned Aircraft Systems (UAS) is stalled by current tube launched UAS which have low endurance with low performance Intelligence, Surveillance, and Reconnaissance (ISR) packages. Additionally, todays market tube-launched UAS are generally deployed from specific tube launching systems to collect ...
SBIR Phase II 2011 Department of DefenseNavy -
Process Improvements for the Production of Large-Area, Monolithic Reconnaissance Windows
SBC: ATS-MER, LLC Topic: N102164This Navy Phase I SBIR Program main objective was to scale up MER"s window technology to make large, strong, monolithic windows from spinel polycrystalline ceramic up to 18"x22"during Phase I and up to 21.5"x37"during Phase II. The window manufacturing concept pursued in this project presents a solution to the Navy"s need for durable, monolithic, infrared-transmitting sensor windows with target ar ...
SBIR Phase II 2011 Department of DefenseNavy -
ZnO Nanowire Interleave for Enhanced Interlaminar Strength
SBC: HARP ENGINEERING LLC Topic: N093171The objective of this SBIR research project is to develop a treatment for interlaminar reinforcement that maintains the composite"s in-plane properties. Because the interlaminar region is a critical component of the composite and no current technology adequately addresses its weaknesses, this research has the potential for major commercial and technological impacts. The current technology gap to a ...
SBIR Phase II 2011 Department of DefenseNavy -
Forward Bathymetry Sensing for Safe High Speed Boat Operation
SBC: ENGINEERING SCIENCE ANALYSIS CORP Topic: N101077ESA is pleased to provide the following proposal regarding the Lidar Collision Avoidance Bathymetry System (L-CABS), an above-water, laser-based, forward-looking collision avoidance and bathymetry sensor system. The significance of this innovation is the use of lidar sensors mounted above the water surface. Lidar is a mature technology that has been proven in numerous applications, including but n ...
SBIR Phase II 2011 Department of DefenseNavy -
Automated Analysis and Verification of Application Program Interfaces (APIs)
SBC: DataSoft Corp. Topic: N093227The DataSoft Interface Verification Application (DIVA) provides an automated robust solution for accurate and repeatable verification of developer source code compliance to a set of Standard API"s. DIVA generates customized compliance reports for the user that accurately summarize all vendor deviations from the standard API. In addition, DIVA can verify a single API file or all of the API files in ...
SBIR Phase II 2011 Department of DefenseNavy -
Net-Centric Prognostics Health Management
SBC: RIDGETOP GROUP INC Topic: N07108Building on the successful research performed in Phase I of this SBIR, Ridgetop will develop cost-saving technologies to assess and improve the state-of-health of IT network components and services. The approach taken involves a four-step process: (1) regularly query network hardware and software via existing measurement points, (2) process the extracted data with advanced diagnostic and prognost ...
SBIR Phase II 2008 Department of DefenseNavy -
Shipboard Lighting System
SBC: Breault Research Organization, Inc. Topic: N04081In 2004, Breault Research Organization (BRO) was awarded and successfully completed the “Ship Board Lighting System” Phase 1 SBIR. The goal of this project was to develop a new solid-state deck floodlight that met the Navy’s irradiance and uniformity requirements. In addition, the new deck floodlight had to be night vision goggle (NVG) compatible and have a lower life cycle cost than a tra ...
SBIR Phase II 2008 Department of DefenseNavy -
Autonomous Movement of Containers from Ship to Shore
SBC: ART ANDERSON ASSOCIATES INC Topic: N05152The JHSV will reach speeds of 35+ knots and allow for the rapid transit and deployment of conventional or Special Operations Forces (SOF) as well as equipment and supplies. It is planned for an FY10 IOC. One of program’s objectives is to reduce the Reception, Staging, Onward movement and Integration (RSO&I) burden in theater. Although the JHSV will be small enough to provide austere port a ...
SBIR Phase II 2008 Department of DefenseNavy -
JP-10 Fueled Stirling UUV Energy System with Thermal Energy Storage
SBC: INFINIA CORPORATION Topic: OSD07ES2The overall Phase II objective is to demonstrate functionality and performance of a 3-kW Stirling engine integrated with Thermal Energy Storage (TES) that is fueled by JP-10. The laboratory configuration energy module will be representative of such a system for application to unmanned undersea vehicle (UUV) needs at the 21-inch diameter level. Because of the modular nature of the Stirling energy s ...
SBIR Phase II 2008 Department of DefenseNavy -
Low-Cost, Eye Limiting Resolution, Immersive Display
SBC: ADVANCED SIMULATION DISPLAYS CO. Topic: N07029The continued advance of flat panel display technology in the commercial and consumer display industry offers the opportunity to provide wide field of view high resolution displays to the flight simulation community with significantly higher performance and lower cost than previously available. These flat panel displays offer exceptional brightness and contrast and steadily increasing resolution ...
SBIR Phase II 2008 Department of DefenseNavy