You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Affordable Wastewater Disposal for Coastal Households Adapting to Sea Level Rise

    SBC: WAIHOME LLC            Topic: 92

    "Rising sea levels and king tide flooding in coastal areas across America are saturating onsite wastewater disposal systems (OSDS), resulting in the degradation of coastal ecosystems and 200,000+ illnesses annually. Many States are mandating system upgrades, with 88,000 upgrades required by 2050 in Hawaii alone. Unfortunately, existing upgrade options are unaffordable for 97% of Hawaiian homeowner ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Carbon-Negative Oceanit Reef for Aquatic Life (CORAL) Surveying via Hyperspectral Imaging-Equipped Littoral Drones (SHIELD)

    SBC: OCEANIT LABORATORIES INC            Topic: 93

    Oceanit proposes the design, construction, and testing of a hyperspectral imaging equipped Unmanned Aerial System (UAS) for the detection of various coral species and the monitoring of coral health. This system will be the prototype for the sensor part of a robust, COTS-based UAS system to aid the NOAA National Coral Reef Monitoring Program. Different coral families and species will be identified ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Rapid Deploy CUI Development Environments for Dev Team

    SBC: SHE BASH LLC            Topic: AF231D012

    The Technical Problem: The Air Force Nuclear Weapons Center (AFNWC) and the broader Department of Defense (DOD) require operational agility that can only be achieved through the implementation of Software Defined Weapon Systems. In today's modern systems,

    SBIR Phase II 2023 Department of DefenseAir Force
  4. AI Assistance for Derivative Classification and Redaction

    SBC: CONDUCTORAI CORPORATION            Topic: AFX236DPCSO1

    Classifying and marking documents in the Department of Defense is largely a manual process. Manual classification is challenging, time-consuming, resource-intensive, and sometimes inconsistent. Recent advancements in AI and large language models (LLMs) ar

    SBIR Phase II 2023 Department of DefenseAir Force
  5. Sustainable Aviation Fuel Manufacturing in Island Locations (SAF MIL)

    SBC: SIMONPIETRI ENTERPRISES LLC            Topic: X224OCSO1

    The overall goal of the project is to show feasibility of adapting our proprietary process of manufacturing commercial sustainable aviation fuel (SAF) in remote island locations from locally available solid waste, to be able to produce military-specification jet fuel for USAF/DoD use, while maintaining delivered cost at or below the current state-of-the-art for commercial SAF made from solid waste ...

    SBIR Phase I 2023 Department of DefenseAir Force
  6. AI Arsenal Management Panel (AIMP)

    SBC: YRIKKA, INC.            Topic: X224OCSO1

    DoD’s 2018 Artificial Intelligence (AI) Strategy [1] noted that adversaries and strategic competitors such as China and Russia are making significant investments in AI technologies for national security purposes. Since 2018, DoD has made organizational changes and is investing billions of dollars to incorporate AI technology into its operations. However, there exists a potential for unintended c ...

    SBIR Phase I 2023 Department of DefenseAir Force
  7. Enterprise PKI API to Enable Successful Execution of DAF CIO ICAM Strategy

    SBC: SHE BASH LLC            Topic: X224OCSO1

    Within three months, SHE BASH will conduct the research necessary to confirm the applicability of their Department of the Air Force Enterprise Public Key Infrastructure (DAF ePKI) solution to determine how the capabilities of the technology can address well-defined defense needs and conduct outreach with empowered and committed USAF Customers and End-Users to plan a SBIR Phase II prototype effort. ...

    SBIR Phase I 2023 Department of DefenseAir Force
  8. Improved Integrated Circuit based Electricity to Radio Frequency Conversion Efficiency Development for Space based Applications

    SBC: OCEANIT LABORATORIES INC            Topic: SF22BT002

    Oceanit proposes to develop a array-based wireless power transfer transmitter using RFIC modules.

    STTR Phase I 2023 Department of DefenseAir Force
  9. In-Situ Atmospheric Path Characterization and Performance Forecasting

    SBC: EO SOLUTIONS LLC            Topic: AF22DT003

    EO Solutions in partnership with the Center for Directed Energy at the Air Force Institute of Technology (AFIT) will demonstrate through modeling and simulation the concepts of using meteorological data and forecasting along with optical measurements to demonstrate the ability to forecast the optical seeing parameters predicting statistical turbulence on a longer time basis, and the actual turbule ...

    STTR Phase I 2023 Department of DefenseAir Force
  10. Hybrid Biological Systems/Biomaterials for In-Body Sensing

    SBC: OCEANIT LABORATORIES INC            Topic: AF23AT002

    The proposal describes an under-the-human skin implantable sensor that can measure biological markers of interest continuously and provide a signal that can be interrogated either with an external device or internally, as part of the implantable device it

    STTR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government