You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Thermally Modulated Solid-State Batteries for Ultra-Safe Fast-Charging Electric Vehicles

    SBC: Ampcera Inc.            Topic: 1

    Heatable solid-state batteries (SSBs) have the potential to enable high energy density and ultra-safe fast charging in electric vehicles (EVs) during cold weather overcoming many of the consumer acceptance barriers hindering widespread adoption. With proper material and system optimization, they are expected to reach desired charging rates of 4C or higher with 80% capacity retention at ambient tem ...

    SBIR Phase I 2023 Department of EnergyARPA-E
  2. Thermally Modulated Solid-State Batteries for Ultra-Safe Fast-Charging Electric Vehicles

    SBC: Ampcera Inc.            Topic: 1

    Heatable solid-state batteries (SSBs) have the potential to enable high energy density and ultra-safe fast charging in electric vehicles (EVs) during cold weather overcoming many of the consumer acceptance barriers hindering widespread adoption. With proper material and system optimization, they are expected to reach desired charging rates of 4C or higher with 80% capacity retention at ambient tem ...

    SBIR Phase II 2023 Department of EnergyARPA-E
  3. XtruJog: Modernization of Joggling of Extruded Aluminum Parts

    SBC: FAIRMOUNT TECHNOLOGIES LLC            Topic: AFX234DCSO2

    In this proposed D2P2 project, we will rapidly develop a second generation XtruJog machine, XJ-2, to be capable of automatically hot joggling parts with the required joggles at the programmed locations. Self-funded proof-of-concept research has shown that

    SBIR Phase II 2023 Department of DefenseAir Force
  4. Space Launch & Operations Common Operating Picture

    SBC: TESSERACT VENTURES LLC            Topic: AFX234DCSO2

    The Tesseract Smart Space Environment is a collaborative workspace designed to create immersive situational awareness and control over highly desperate information streams. This may include incoming feeds from IoT assets, cameras, sensors, enterprise soft

    SBIR Phase II 2023 Department of DefenseAir Force
  5. HotSwap System for ISAM Friendly Spacecraft

    SBC: THERMASAT, INC.            Topic: AFX234DCSO1

    In-orbit servicing, assembly, and manufacturing (ISAM) technologies are taking the space industry by storm and will undoubtedly shape the future industry. These ISAM services generally focus around providing mobility for different spacecraft improving lif

    SBIR Phase II 2023 Department of DefenseAir Force
  6. ThermaSat Plus OTV

    SBC: THERMASAT, INC.            Topic: AFX234DCSO1

    The space domain is changing with in-orbit servicing, assembly, and maintenance (ISAM) technologies quickly dominating new spacecraft designs and developments. A future space economy undoubtedly will be based around ISAM services for satellites. As these

    SBIR Phase II 2023 Department of DefenseAir Force
  7. US-Based High-Speed I/O for Space-Based Defense Applications

    SBC: ALPHACORE INC            Topic: AFX234DCSO2

    The US Space Force (SF) wishes to advance existing dual-purpose interface technology for its modernization priorities in broadly identified segments. A rad-hard SerDes is a “must” technology to have in any electronic system, or a set of systems, in which

    SBIR Phase II 2023 Department of DefenseAir Force
  8. Rapid Deploy CUI Development Environments for Dev Team

    SBC: SHE BASH LLC            Topic: AF231D012

    The Technical Problem: The Air Force Nuclear Weapons Center (AFNWC) and the broader Department of Defense (DOD) require operational agility that can only be achieved through the implementation of Software Defined Weapon Systems. In today's modern systems,

    SBIR Phase II 2023 Department of DefenseAir Force
  9. AI Assistance for Derivative Classification and Redaction

    SBC: CONDUCTORAI CORPORATION            Topic: AFX236DPCSO1

    Classifying and marking documents in the Department of Defense is largely a manual process. Manual classification is challenging, time-consuming, resource-intensive, and sometimes inconsistent. Recent advancements in AI and large language models (LLMs) ar

    SBIR Phase II 2023 Department of DefenseAir Force
  10. AI Arsenal Management Panel (AIMP)

    SBC: YRIKKA, INC.            Topic: X224OCSO1

    DoD’s 2018 Artificial Intelligence (AI) Strategy [1] noted that adversaries and strategic competitors such as China and Russia are making significant investments in AI technologies for national security purposes. Since 2018, DoD has made organizational changes and is investing billions of dollars to incorporate AI technology into its operations. However, there exists a potential for unintended c ...

    SBIR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government