You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AMMO- Phase II

    SBC: Breault Research Organization, Inc.            Topic: N221075

    Breault Research is proud to provide our Navy customer with the technology and tools to design, produce and field a true Twenty First Century warhead. Breault’s Adaptive Multi-Mission Ordnance (AMMO) incorporates state-of-the-art lethality materials and flexible configurations to optimize warhead effectiveness in a smaller form factor. Breault’s unique design and production processes provide t ...

    SBIR Phase II 2023 Department of DefenseNavy
  2. DIALR Phase II

    SBC: PRIME SOLUTIONS GROUP, INCORPORATED            Topic: OSD221002

    The pace of remotely sensed data collection is increasing exponentially while the skilled workforce that is available to analyze and interpret the data is not. Artificial Intelligence (AI) offers a technology pathway to automation which promises to rapidly reduce the gap between data and information products and services. However, AI techniques require massive quantities of labeled data to train m ...

    SBIR Phase II 2023 Department of DefenseNational Geospatial-Intelligence Agency
  3. Large Form Factor Scintillators for Nuclear Battlefield Operations

    SBC: N.P. PHOTONICS, INC.            Topic: DTRA22D002

    The current state-of-the-art radiation detection materials have different drawbacks limiting their applications in the next-generation mobile radiation detection system. NP Photonics proposes to develop a novel scintillating glass that can be used to make large form-factor scintillators for nuclear battlefield operations. The proposed scintillating glass has the advantages of low cost, short decay ...

    STTR Phase I 2023 Department of DefenseDefense Threat Reduction Agency
  4. Modular Solar Generation to Advance the Objectives of The Army Climate Strategy

    SBC: INERGY HOLDINGS, LLC            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  5. IRIS: InfraRed Imager optimized for low SWAP

    SBC: ALPHACORE INC            Topic: A234013

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  6. VECSEL Based NV Diamond Magnetometry for Brain Machine Interfacing

    SBC: CThru Lasers Inc.            Topic: AF224D028

    Recent interest in high sensitivity magnetic sensing has spurred the development of several technologies, but none are ideal for Magnetoencephalography (MEG) imaging systems.  The development of engineered diamonds with defects such as NV centers has been

    SBIR Phase II 2023 Department of DefenseAir Force
  7. Seaweed-based bioplastic replacement for commercial lobster fishing gear.

    SBC: VIABLE GEAR LLC            Topic: 93

    Viable Gear will provide proof-of-concept for a seaweed-based bioplastic to be used in manufacturing a compostable biotwine for marine equipment, designed to replace petroleum-based plastics. This addresses NOM-SBIR research topic area 9.3, The Changing Ocean - specifically to "support increased protection and restoration of marine and coastal habitats to enhance vital ecosystems", by helping decr ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  8. Tungsten 3% Rhenium Wire Manufacturing

    SBC: Elmet Technologies LLC            Topic: DLA231D08

    When GTP discontinued the manufacture of WRe wire, it ended US-based production of a material critical in the operations of MWT/TWT equipment for defense applications.  The objective of this project is to produce a WRe wire that matches as closely as possible the wire produced by GTP while also potentially developing a process that meets or exceeds the yields achieved by GTP.  The wire produced ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  9. OWL 40mm Photoluminescent Tracer

    SBC: NOSTROMO LLC            Topic: N231005

    Nostromo, LLC  (“Nostromo”) proposes to: (1) optimizes propellant combustion spectrum to produce radiation in a wavelength that optimally charges phosphors; (2) develop and refine a translucent epoxy matrix that can be incorporated into 40mm training and operational cartridges; (3) design, optimize and test phosphors that are configurable in a thin translucent epoxy and can be readily charged ...

    SBIR Phase I 2023 Department of DefenseNavy
  10. Active Low-Voltage Thin-Film Lithium Niobate Electro-Optic Modulator

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: N231010

    The primary technical objective of the proposed effort will be to investigate integration of optical gain medium with thin-film lithium niobate on insulator (TFLNOI) optical waveguides. Recent developments in crystal ion-sliced (CIS) TFLNOI have enabled a new class of electro-optic modulators and photonic integrated circuits with tighter mode confinement, a compact footprint, ultra-high bandwidth, ...

    SBIR Phase I 2023 Department of DefenseNavy
US Flag An Official Website of the United States Government