You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 3165 results
  1. A Maine Wild Blueberry Value-Added Product for Profitability andSustainability of Small and Mid-Sized Growers

    SBC: Wicked Wild, LLC            Topic: 812

    Project SummaryA Maine Wild Blueberry Value-Added Product for Profitability andSustainability of Small and Mid-Sized GrowersProject Director Lucille Van Hook M.S.Wicked Wild LLCDescription of the Problem or Opportunity: The viability of Maine's small and mid-size wildblueberry farms depends on developing and selling value-added products. Wicked Wild LLCshall prove the feasibility of a wild blueber ...

    SBIR Phase I 2023 Department of Agriculture
  2. A low-cost snow water equivalent sensor

    SBC: NWB SENSORS INC            Topic: 84

    Project SummaryAccumulated snowpack is a major source of water throughout the United States. Accuratelymonitoring snow on the northern plains is a significant need for streamflow forecasting andreservoir management. This has been demonstrated by the US Army Corp of Engineersestablishment of the Upper Missouri River Basin Plains Snow and Soil Moisture MonitoringNetwork. The availability of a low-co ...

    SBIR Phase I 2023 Department of Agriculture
  3. Environmental Protection: Power Line Bird-Diverter Installation with Novel Touch-Capable Drone

    SBC: PITCH AERONAUTICS INC.            Topic: 84

    Our water air soil farms and forests depend on birds as vital natural resources. Birds consumeinsects pollinate plants disperse seeds and maintain wetlands. Unfortunately transmission linecollisions kill 57 million birds annually in the United States. Installing markers that help birdssee and not hit power lines can decrease bird collisions by more than 70%. Today powerlinemen use bucket trucks an ...

    SBIR Phase I 2023 Department of Agriculture
  4. Autonomous harvester for cilantro with bunching and tying capability

    SBC: PADMA AGROBOTICS LLC            Topic: 813

    This project aims to develop an automated robotic harvester for cilantro and other specialty cropsthat are harvested in bunches. Currently this is a labor-intensive task that takes up to 50% of totalcosts. Automating this task would mean reducing OPEX for farms by 40%-50% and moreimportantly tackling the huge labor shortage currently affecting the agricultural sector. This willpermit to grow produ ...

    SBIR Phase I 2023 Department of Agriculture
  5. HERMES: Humanitarian Emergency Response Messenger of Essential Supplies drone payload attachment

    SBC: HYDRONALIX INC            Topic: 86

    HERMES: Humanitarian Emergency Response Messenger of Essential Supplies drone payloadattachmentPI: Anthony C. MulliganSmall business: Hydronalix Green Valley AZMore than 95% of U.S. land area is classified as rural but home to just 19% of the population.Rural communities face geographic and demographic obstacles in responding to and preparing forextreme events such as hurricanes tornadoes and floo ...

    SBIR Phase I 2023 Department of Agriculture
  6. HotSwap System for ISAM Friendly Spacecraft

    SBC: THERMASAT, INC.            Topic: AFX234DCSO1

    In-orbit servicing, assembly, and manufacturing (ISAM) technologies are taking the space industry by storm and will undoubtedly shape the future industry. These ISAM services generally focus around providing mobility for different spacecraft improving lif

    SBIR Phase II 2023 Department of DefenseAir Force
  7. ThermaSat Plus OTV

    SBC: THERMASAT, INC.            Topic: AFX234DCSO1

    The space domain is changing with in-orbit servicing, assembly, and maintenance (ISAM) technologies quickly dominating new spacecraft designs and developments. A future space economy undoubtedly will be based around ISAM services for satellites. As these

    SBIR Phase II 2023 Department of DefenseAir Force
  8. US-Based High-Speed I/O for Space-Based Defense Applications

    SBC: ALPHACORE INC            Topic: AFX234DCSO2

    The US Space Force (SF) wishes to advance existing dual-purpose interface technology for its modernization priorities in broadly identified segments. A rad-hard SerDes is a “must” technology to have in any electronic system, or a set of systems, in which

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Rapid Deploy CUI Development Environments for Dev Team

    SBC: SHE BASH LLC            Topic: AF231D012

    The Technical Problem: The Air Force Nuclear Weapons Center (AFNWC) and the broader Department of Defense (DOD) require operational agility that can only be achieved through the implementation of Software Defined Weapon Systems. In today's modern systems,

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Biomineralization using in situ materials to enhance Rapid Airfield Damage Recovery (RADR) and Development of Expeditionary Airfields

    SBC: BIOSQUEEZE INC            Topic: AFX236DPCSO1

    Select microbes contain an enzyme that promotes the hydrolysis of urea (ureolysis). This triggers an increase in pH and carbonate concentrations that, in turn, can cause dissolved minerals to precipitate and form solids similar to limestone. Recent resear

    SBIR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government