You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED NULLING TECHNIQUES

    SBC: Pollard Road Inc.            Topic: N/A

    IT IS PROPOSED TO DEVELOP A SET OF ADVANCED ADAPTIVE NULLING ALGORITHMS TO ENABLE SENSOR ARRAYS TO OPERATE EFFECTIVELY IN A RAPIDLY CHANGING ELECTROMAGNETIC ENVIRONMENT CHARACTERIZED BY SPREAD-SPECTRUM SIGNALS AND SOPHISTICATED JAMMERS. AS ENVISIONED THE ADVANCED ADAPTIVE NULLING ALGORITHM WILL CONSIST OF TWO ELEMENTS: (1) A QUICK REACTION CAPABILITY (QRC) THAT ENABLES THE ARRAY TO RESPOND RAPIDLY ...

    SBIR Phase II 1986 Department of DefenseAir Force
  2. AN IMPROVED GATED VIDEO CAMERA WILL BE DEVELOPED AND RUGGEDIZED TO PERMIT THE ACQUISITION OF WEAPON POINTING ERRORS ON STABILIZED VEHICLE MOUNTED WEAPON SYSTEMS IN A HIGH SHOCK AND VIBRATION FIELD ENVIRONMENT.

    SBC: Strauss Photo-technical Servic            Topic: N/A

    AN IMPROVED GATED VIDEO CAMERA WILL BE DEVELOPED AND RUGGEDIZED TO PERMIT THE ACQUISITION OF WEAPON POINTING ERRORS ON STABILIZED VEHICLE MOUNTED WEAPON SYSTEMS IN A HIGH SHOCK AND VIBRATION FIELD ENVIRONMENT. IMPROVEMENTS OVER EXISTING GATED CAMERAS WILL BE IN THE AREAS OF PHYSICAL SIZE AND WEIGHT, SENSITIVITY, RESOLUTION, LINEARITY, AND DYNAMIC RANGE. VIDEO SIGNAL INTERFACING WILL BE COMPATABLE ...

    SBIR Phase I 1986 Department of DefenseArmy
  3. DEVELOPMENT OF AN IMPROVED NECK FOR EJECTION SYSTEM TESTING MANIKINS

    SBC: Simula, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  4. DIRECT GROWTH/FUSION CIRCUITRY DEVICES ON OPTICAL FIBER

    SBC: Advanced Fiberoptics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  5. ELASTOMERIC MATRIX MATERIALS FOR USE IN AIRCRAFT PRIMARY STRUCTURES EVALUATION

    SBC: Simula, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  6. HIGH-EFFICIENCY THIN-FILM SILICON-ON-GAP SOLAR CELL FOR IMPROVED RADIATION RESISTANCE

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  7. LIGHTWEIGHT SEALED PARACHUTE AND HARNESS ASSEMBLY

    SBC: Simula, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  8. MONOLITHIC GAAS LIGHT-EMITTING DIODES ON SILICON VLSI CIRCUITS ELEMENTS

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  9. MOST SURFACE COATINGS (PAINTS) USED ON THE EXTERIOR OF MILILTARY HARDWARE POSSESS HIGH THERMAL EMITTANCE IN THE 3 TO 5 MICRON AND 8 TO 23 MICRON WAVELENGTH REGIONS, MAKING THEM VULNERABLE TO DETECTION USING STATE-OF-THE-ART OPTICAL INFRARED DETECTORS.

    SBC: Dset Labs Inc            Topic: N/A

    MOST SURFACE COATINGS (PAINTS) USED ON THE EXTERIOR OF MILILTARY HARDWARE POSSESS HIGH THERMAL EMITTANCE IN THE 3 TO 5 MICRON AND 8 TO 23 MICRON WAVELENGTH REGIONS, MAKING THEM VULNERABLE TO DETECTION USING STATE-OF-THE-ART OPTICAL INFRARED DETECTORS. THIS PROPOSED EFFORT HAS AS ITS OBJECTIVE THE DEVELOPMENT OF SURFACE COATINGS THAT HAVE LOW SPECTRAL EMITTANCE PROPERTIES IN THE SENSITIVE WAVELENGT ...

    SBIR Phase I 1986 Department of DefenseArmy
  10. (RIMAND)

    SBC: Digital Development Corp            Topic: N/A

    IN THE PHASE I OF THE RETAIL INVENTORY MANAGEMENT ADVISORY NETWORK DEVELOPMENT (RIMAND) EFFORT A LIMNITED PROTOTYPE OF THE ADVISORY NETWORK WILL BE DEVELOPED. A SMALL AREA OF RETAIL INVENTORY MANAGEMENT RESPONSIBILITY WILL BE EXAMINED, AND THE ASSOCIATED POLICIES AND PROCEDURES WILL BE CODIFIED IN AN EXPERT SYSTEM IMPLEMENTED ON A PROGRAMMABLE WORKSTATION. A DEMONSTRATION OF THE NETWORK ACCESS FAC ...

    SBIR Phase I 1986 Department of DefenseNavy
US Flag An Official Website of the United States Government