You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TeraSense Ocelot
SBC: TERASENSE, INC. Topic: AFX234DCSO2There is an immediate need to confirm the integrity of Kessel Run (KR) software supply chain (IAW EO 14028, Improving the Nation's Cybersecurity) and ensure deployed solutions are secure and function as intended. Kessel Run developers leverage software comprised of different components to enable capabilities for mission outcomes. However, unknown components can cause systems to perform in unexpect ...
SBIR Phase II 2023 Department of DefenseAir Force -
Automated Confined Space Inspection Using Mobile Devices and Systems Enabled With 3D+ Software Platform
SBC: QUIDIENT, LLC Topic: AFX234DCSO2Quidient proposes to leverage its Quidient Reality® Platform to develop the proposed Automated Confined Space Inspection Prototype System (CSI-4100). The system will include a 3D+ scanning application enabling mobile devices, like tablets and small COTS c
SBIR Phase II 2023 Department of DefenseAir Force -
Rendezvous and Proximity Operations Reconstruction Tool (RePORT) for Virtualizing In-Space Servicing Operations
SBC: QUIDIENT, LLC Topic: AFX234DCSO1Quidient proposes to leverage its Quidient Reality® Platform to develop the Rendezvous and Proximity Operations Reconstruction Tool (RePORT-4100) for Virtualizing In-Space Servicing Operations. The system will include a 3D+ scanning application to close i
SBIR Phase II 2023 Department of DefenseAir Force -
HotSwap System for ISAM Friendly Spacecraft
SBC: THERMASAT, INC. Topic: AFX234DCSO1In-orbit servicing, assembly, and manufacturing (ISAM) technologies are taking the space industry by storm and will undoubtedly shape the future industry. These ISAM services generally focus around providing mobility for different spacecraft improving lif
SBIR Phase II 2023 Department of DefenseAir Force -
TeraSense Lynx
SBC: TERASENSE, INC. Topic: AFX234DCSO2Space Systems Command (SSC) has an immediate need for a security solution to replace the SCAP Compliance Checker (SCC) to ensure their environment remains compliant with NIST 800-53 policies, free of security vulnerabilities (EO 14028, Improving the Natio
SBIR Phase II 2023 Department of DefenseAir Force -
ThermaSat Plus OTV
SBC: THERMASAT, INC. Topic: AFX234DCSO1The space domain is changing with in-orbit servicing, assembly, and maintenance (ISAM) technologies quickly dominating new spacecraft designs and developments. A future space economy undoubtedly will be based around ISAM services for satellites. As these
SBIR Phase II 2023 Department of DefenseAir Force -
US-Based High-Speed I/O for Space-Based Defense Applications
SBC: ALPHACORE INC Topic: AFX234DCSO2The US Space Force (SF) wishes to advance existing dual-purpose interface technology for its modernization priorities in broadly identified segments. A rad-hard SerDes is a “must” technology to have in any electronic system, or a set of systems, in which
SBIR Phase II 2023 Department of DefenseAir Force -
Authoritative Lineage Determination for DOcuments with Metadata (ALDDOM)
SBC: REDSHRED, LLC Topic: AF231D010Authoritative resources are a significant factor in the success of developing and integrating tools and infrastructure to facilitate the adoption of Digital Engineering.” RedShred has developed an API-first platform designed to allow teams to extract and
SBIR Phase II 2023 Department of DefenseAir Force -
Rapid Deploy CUI Development Environments for Dev Team
SBC: SHE BASH LLC Topic: AF231D012The Technical Problem: The Air Force Nuclear Weapons Center (AFNWC) and the broader Department of Defense (DOD) require operational agility that can only be achieved through the implementation of Software Defined Weapon Systems. In today's modern systems,
SBIR Phase II 2023 Department of DefenseAir Force -
Global Eyes
SBC: TEAMWORX SECURITY, INC. Topic: AFX236DPCSO1Today, the United States is under constant threat in the cyber domain as Russia and the People's Republic of China (PRC) have penetrated, compromised, and maintained advanced persistent threats (APTs) within US networks and applications. Since these threa
SBIR Phase II 2023 Department of DefenseAir Force