You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Environmental Protection: Power Line Bird-Diverter Installation with Novel Touch-Capable Drone
SBC: PITCH AERONAUTICS INC. Topic: 84Our water air soil farms and forests depend on birds as vital natural resources. Birds consumeinsects pollinate plants disperse seeds and maintain wetlands. Unfortunately transmission linecollisions kill 57 million birds annually in the United States. Installing markers that help birdssee and not hit power lines can decrease bird collisions by more than 70%. Today powerlinemen use bucket trucks an ...
SBIR Phase I 2023 Department of Agriculture -
Autonomous harvester for cilantro with bunching and tying capability
SBC: PADMA AGROBOTICS LLC Topic: 813This project aims to develop an automated robotic harvester for cilantro and other specialty cropsthat are harvested in bunches. Currently this is a labor-intensive task that takes up to 50% of totalcosts. Automating this task would mean reducing OPEX for farms by 40%-50% and moreimportantly tackling the huge labor shortage currently affecting the agricultural sector. This willpermit to grow produ ...
SBIR Phase I 2023 Department of Agriculture -
HERMES: Humanitarian Emergency Response Messenger of Essential Supplies drone payload attachment
SBC: HYDRONALIX INC Topic: 86HERMES: Humanitarian Emergency Response Messenger of Essential Supplies drone payloadattachmentPI: Anthony C. MulliganSmall business: Hydronalix Green Valley AZMore than 95% of U.S. land area is classified as rural but home to just 19% of the population.Rural communities face geographic and demographic obstacles in responding to and preparing forextreme events such as hurricanes tornadoes and floo ...
SBIR Phase I 2023 Department of Agriculture -
Designer Biochar- low-cost adsorbents for nitrate and phosphate nutrients to prevent eutrophication of watercourses and to provided nutrients in soil augmentation
SBC: GLANRIS WATER SYSTEMS INC Topic: 88Project Summary/AbstractFunding Opportunity Number: USDA-NIFA-SBIR-009301Topic Area 8.8: Biofuels and Biobased ProductsTitle of Project: Designer Biochar - Low-cost adsorbents and fertilizers for nitrate and phosphateadsorption and nutrient deliveryPD/PI: Brigano Frank A. Glanris Inc.Co PD/PI: Mlsna Todd E. Mississippi State UniversityCo PD/PI: Pittman Charles Mississippi State UniversityGlanris I ...
STTR Phase I 2023 Department of Agriculture -
HotSwap System for ISAM Friendly Spacecraft
SBC: THERMASAT, INC. Topic: AFX234DCSO1In-orbit servicing, assembly, and manufacturing (ISAM) technologies are taking the space industry by storm and will undoubtedly shape the future industry. These ISAM services generally focus around providing mobility for different spacecraft improving lif
SBIR Phase II 2023 Department of DefenseAir Force -
ThermaSat Plus OTV
SBC: THERMASAT, INC. Topic: AFX234DCSO1The space domain is changing with in-orbit servicing, assembly, and maintenance (ISAM) technologies quickly dominating new spacecraft designs and developments. A future space economy undoubtedly will be based around ISAM services for satellites. As these
SBIR Phase II 2023 Department of DefenseAir Force -
US-Based High-Speed I/O for Space-Based Defense Applications
SBC: ALPHACORE INC Topic: AFX234DCSO2The US Space Force (SF) wishes to advance existing dual-purpose interface technology for its modernization priorities in broadly identified segments. A rad-hard SerDes is a “must” technology to have in any electronic system, or a set of systems, in which
SBIR Phase II 2023 Department of DefenseAir Force -
Rapid Deploy CUI Development Environments for Dev Team
SBC: SHE BASH LLC Topic: AF231D012The Technical Problem: The Air Force Nuclear Weapons Center (AFNWC) and the broader Department of Defense (DOD) require operational agility that can only be achieved through the implementation of Software Defined Weapon Systems. In today's modern systems,
SBIR Phase II 2023 Department of DefenseAir Force -
AI Assistance for Derivative Classification and Redaction
SBC: CONDUCTORAI CORPORATION Topic: AFX236DPCSO1Classifying and marking documents in the Department of Defense is largely a manual process. Manual classification is challenging, time-consuming, resource-intensive, and sometimes inconsistent. Recent advancements in AI and large language models (LLMs) ar
SBIR Phase II 2023 Department of DefenseAir Force -
AI Arsenal Management Panel (AIMP)
SBC: YRIKKA, INC. Topic: X224OCSO1DoD’s 2018 Artificial Intelligence (AI) Strategy [1] noted that adversaries and strategic competitors such as China and Russia are making significant investments in AI technologies for national security purposes. Since 2018, DoD has made organizational changes and is investing billions of dollars to incorporate AI technology into its operations. However, there exists a potential for unintended c ...
SBIR Phase I 2023 Department of DefenseAir Force