You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. COMBAT VEHICLE TACTICAL DISPLAY SYSTEMS (TDS)

    SBC: Advanced Programming Concepts            Topic: N/A

    ADVANCED PROGRAMMING CONCEPTS (APC) PROPOSES TO EXPAND A PREVIOUSLY DEVELOPED TACTICAL DISPLAY SYSTEM (TDS) TO ORIENT IT FOR USE BY TANK AND OTHER ARMORED VHEICLE COMMANDERS. THIS TDS WILL (FOR PHASE I) BE UPDATED VIA SMALL VHF PORTABLE RADIOS USING X.25 PROTOCOL. THE TACTICAL DISPLAY WILL CONSIST OF TERRAIN, OWN UNIT POSITION, FRIENDLY AND ENEMY UNIT POSITIONS AND MAP OVERLAYS FOR REFERENCE. FREE ...

    SBIR Phase I 1990 Department of DefenseArmy
  3. ACTIVATED METAL DECOY FOR LOW IR SIGNATURE AIRCRAFT

    SBC: Alloy Surfaces Company, Inc.            Topic: N/A

    ACTIVATED STEEL FOIL FABRICATED INTO ELEMENTS TO BE PACKAGED AS EXPENDABLE DECOYS HAS SHOWN GOOD PERFORMANCE IN LOW IR SIGNATURE APPLICATIONS. THE PRESENT BATCH PRODUCTION PROCESS FOR THESE FOILS ENTAILS, IN PART, TWENTY HOURS OF FURNACE TREATMENT. A COMBINATION OF NINE SEPARATE OPERATIONS, LOW PRODUCTION RATES AND HIGH LABOR COSTS YIELDS A UNIT MANUFACTURING COST OF MORE THAN $250.00. WE PROPOSE ...

    SBIR Phase I 1990 Department of DefenseNavy
  4. DIRECTED GAMMA RADIATION BEAM

    SBC: Applied Research Associates, Inc.            Topic: N/A

    A FEASIBILITY STUDY IS PROPOSED ON A NOVEL CONCEPT FOR A GENERATION OF A VERY LIGHTWEIGHT, HIGHLY FOCUSED GAMMA RADIATION BEAM USEFUL FOR MULTIPLE APPLICATIONS IN DEFENSE SUCH AS KILL OF ELECTRONIC SYSTEMS IN LAND WARFARE, AND (AS DESCRIBED HEREIN) DISCRIMINATION OF TARGETS IN SPACE. THE DEVICE IS SMALL ENOUGH TO "PIGGY BACK" ON THE PROPOSED REENTRY VEHICLE (RV) INTERCEPTOR MISSILES, OR BE CARRIED ...

    SBIR Phase I 1990 Department of DefenseArmy
  5. HIGH-SPEED LAUNCHER FOR FRAGMENT SIMULATOR

    SBC: Applied Research Associates, Inc.            Topic: N/A

    AN ECONOMICAL FRAGMENT LAUNCH SYSTEM IS NEEDED TO DUPLICATE WARHEAD FRAGMENT/AIR TARGET ENCOUNTER CONDITIONS ASSOCIATED WITH MODERN AIR TO AIR COMBAT. THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE A DETAILED CONCEPTUAL DESIGN, INCLUDING BUILDING AND OPERATING COST ESTIMATES, FOR A LAUNCH SYSTEM CAPABLE OF PROJECTING METALLIC, PARALLELEPIPED FRAGMENTS WITH WEIGHTS IN THE RANGE OF 30-250 GRAINS (1.9-16 ...

    SBIR Phase I 1990 Department of DefenseNavy
  6. EXPERIMENTAL EVALUATION OF THE INFLUENCE OF GEOLOGY ON EXPLOSIVE SOURCE YIELD DETERMINATION

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  7. EXPERIMENTAL EVALUATION OF THE INFLUENCE OF SITE LAYERING AND BURST DEPTH ON RADIATED SEISMIC ENERGY

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  8. DECOUPLED PENETRATION ANALYSIS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  9. PHASED ARRAY TELESCOPE IMAGE PROCESSING

    SBC: A-TECH CORPORATION            Topic: N/A

    AN ANALYTIC MODEL OF A WIDE FIELD, PHASED ARRAY IMAGING SYSTEM WILL BE DEVELOPED. THE MODEL IS BASED ON A MEASUREMENT SYSTEM CAPABLE OF ERROR MEASUREMENT DIRECTLY WITH RESPECT TO THE FINAL IMAGE PLANE. THE BEAMS FROM INDIVIDUAL SUBAPERTURES WILL BE COMPACTED AND CONFORMALLY MAPPED TO A DEMAGNIFIED PUPIL. WE WILL DEVELOP NONREDUNDANT, CODED APERTURE MASKS TO BE INSERTED AT THIS COMPACT PUPIL WHICH ...

    SBIR Phase I 1990 Department of DefenseAir Force
  10. ALUMINUM-GALLIUM-ARSENIDE TOP SOLAR CELL FOR MECHANICAL ATTACHMENT TO A SILICON CONCENTRATOR WITH IMPROVED AMO EFFICIENCY

    SBC: ASTROPOWER, INC.            Topic: N/A

    INCREASES IN SOLAR CELL EFFICIENCY CAN BE ACHIEVED WITH TANDEM MULTI-JUNCTION STRUCTURES TO IMPROVE THE PERFORMANCE AND SCALE OF SPACE PHOTOVOLTAIC CONCENTRATORS. THE "TOP SOLAR CELL" TANDEM APPROACH COULD INCREASE ENERGY CONVERSION EFFICIENCY BY AS MUCH AS 100%. A SELF-SUPPORTING ALUMINUM-GALLIUM-ARSENIDE (ALGAAS) TOP SOLAR CELL IS BEING DEVELOPED FOR MECHANICAL ATTACHMENT TO A SILICON CONCENTRAT ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government