You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED COMPOSITE MATERIALS FOR LIGHTWEIGHT ROTOCRAFT/AIR-VEHICLE SYSTEM COMPONENTS

    SBC: ATS-MER, LLC            Topic: N/A

    CHRONIC NEEDS FOR HIGHER PERFORMANCE IN PRESENT AND FUTURE ARMY ROTOCRAFT/AIR-VEHICLE SYSTEMS MANDATE IMPROVEMENTS IN MATERIALS PROPERTIES. LIGHTWEIGHT METAL MATRIX COMPOSITES (MMC) INCLUDING MAGNESIUM AND ALUMINUM ARE AMONG THE BEST CANDIDATES TO FULFILL THE REQUIREMENTS THAT ENABLE LIGHTWEIGHT STRUCTURES, ADVANCED PROPULSION, TRANSMISSIONS, ROTORS, THRUST DEVICES, ETC. A UNIQUE COATINGS APPROACH ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. ADVANCED FASTENER SYSTEM FOR COMPOSITE STRUCTURES

    SBC: Fatigue Technology Inc            Topic: N/A

    A RESEARCH PROGRAM WILL BE PERFORMED TO PRODUCE A MORE COMPLETE UNDERSTANDING OF FASTENING SYSTEMS FOR ADVANCED COMPOSITES. THIS WILL INCLUDE EVALUATIONS OF CURRENT PRODUCTION FASTENER SYSTEMS AS WELL AS A CANDIDATE SYSTEM BASED ON THE USE OF A COLD EXPANSION PROCESS TO PERMANENTLY INSTALL THIN WALL PROTECTIVE GROMMETS IN FASTENER HOLES IN COMPOSITIES. THESE FASTENER SYSTEMS WILL BE TESTED FOR INT ...

    SBIR Phase I 1991 Department of DefenseArmy
  3. AN ADAPTIVE CONTACT FUZE

    SBC: Silicon Designs, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseNavy
  4. A PROPOSAL TO DEVELOP AN IONOSPHERIC TOMOGRAPHY SYSTEM

    SBC: NORTHWEST RESEARCH ASSOCIATES, INC.            Topic: N/A

    TRANSIONOSPHERIC C3I RADIO SYSTEMS AND OTH RADARS BENEFIT FROM KNOWLEDGE OF PLASMA DENSITY (RADIO REFRACTIVE INDEX) IN THE IONOSPHERE AND GRADIENTS HEREIN. WE PROPOSE TO ASSESS FEASIBILITY OF AN IONOSPHERIC TOMOGRAPHY SYSTEM (ITS) FOR PROVIDING SUCH INFORMATION IN THE FORM OF NEAR-REAL-TIME IMAGES, USING MUTUALLY COHERENT VHF-UHF SIGNALS PRESENTLY TRANSMITTED FROM THE NNSS ("TRANSIT") SATELLITES. ...

    SBIR Phase II 1991 Department of DefenseAir Force
  5. BROADBAND OPTICAL COMMUNICATION TECHNOLOGY FOR FAULT TOLERANT FIBER OPTIC NETWORKS, PROVIDING INCREASED PERFORMANCE, THROUGHPUT, AND CAP

    SBC: Phoenix Digital Corpon            Topic: N/A

    DOD OPTICAL COMMUNICATION REQUIREMENTS HAVE MOVED BEYOND THE PERFORMANCE CAPABILITIES OF CONVENTIONAL FIBER OPTIC COMMUNICATION TECHNOLOGIES. CONVENTIONAL OPTICAL COMMUNICATION NETWORKS ARE LIMITED TO BASEBAND COMMUNICATION. HOWEVER, BREAKTHROUGHS IN NEW, BIREFRINGENT CRYSTAL TECHNOLOGY COMBINED WITH THE APPLICATION OF NEW HEURISTIC TECHNIQUES FOR OPTICAL LASER POWER MODULATION MAKE IT POSSIBLE TO ...

    SBIR Phase I 1991 Department of DefenseNavy
  6. CDTE OPTICAL COMPONENTS IN LONG WAVELENGTH INFRARED SYSTEMS

    SBC: Xacton Corp            Topic: N/A

    INFRARED SYSTEMS ARE NEEDED FOR A VARIETY OF DEFENSE RELATED APPLICATIONS, SUCH AS: SURVEILLANCE, TARGET DETECTION, ACQUISITION AND TRACKING, MISSILE GUIDANCE, ETC. FOR MANY APPLICATIONS SUCH AS THOSE INVOLVING COLD-DIM TARGETS, THESE SYSTEMS NEED TO OPERATE IN THE VERY LONG WAVELENGTH REGION OF THE INFRARED SPECTRUM, E.G. 15-35 MICRONS CUTOFF. IN THIS WAVELENGTH REGION, THE AVAILABILITY OF SUITAB ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  7. CONCEPT DEVELOPMENT FOR AN AIRBAG CRASH-PROTECTION SYSTEM

    SBC: Simula, Inc.            Topic: N/A

    THE LATEST U.S. ARMY PRODUCTION HELICOPTERS INCLUDE CREWSEATS WHICH SIGNIFICANTLY REDUCE THE PROBABILITY OF SPINAL INJURY DUE TO VERTICAL IMPACT FORCES. HOWEVER, THE RISK OF INJURY TO THE UPPER TORSO AND HEAD DUE TO SECONDARY IMPACTS IS STILL UNACCEPTABLY HIGH. ONE OF THE REASONS FOR THIS IS THAT THE STANDARD FIVE-POINT RESTRAINT SYSTEM IS NOT DESIGNED TO RESTRAIN LATERAL MOTION, AND IMPACTS WITH ...

    SBIR Phase II 1991 Department of DefenseArmy
  8. CONTROLLED MICROSTRUCTURAL DEVELOPMENT OF SI(3)N(4) TO ENHANCE FRACTURE TOUGHNESS

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. DEVELOPMENT OF A FIBER-OPTIC CHAMBER PRESSURE TRANSDUCER

    SBC: Waterjet Technology Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. DEVELOPMENT OF ALUMINUM ALLOYS FOR USE IN- 9OOF FASTENER APPLICATIONS

    SBC: ATS-MER, LLC            Topic: N/A

    THERE IS A CHRONIC NEED FOR LIGHTER YET STRONGER MATERIALS FOR BOTH AMBIENT AND ELEVATED TEMPERATURE APPLICATIONS IN BOTH IAILITARY AND COMMERCIAL SECTORS. ONE REQUIREMENT IS FOR A 9OODEGF ALUMINUM FASTENER COMPATIBLE WITH ALUMINUM AND TITANIUM ALLOYS. MECHANICAL ALLOYING/RAPID SOLIDIFICATION PROCESSING USING INTERMETALLIC AND SPINEL DISPERSIONS HAVE DEMONSTRATED PROMISE FOR INCREASING THE SERVICE ...

    SBIR Phase I 1991 Department of DefenseAir Force
US Flag An Official Website of the United States Government