You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. THE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES.

    SBC: Cas Inc.            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES. THESE PARAMETERS AND WEIGHTING SCHEMES WILL BE ESTABLISHED TO ACHIEVE OPERATIONAL EFFECTIVENESS, AS WELL AS THE DEFINITION, DESIGN, AND CONSTRUCTION PROCESSES AND METHODOLOGIES DEVEL ...

    SBIR Phase I 1983 Department of DefenseArmy
  2. THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO PROVIDE THE DESIGNER OF AN TI-RADIATION HOMING MISSILES WITH THE INFORMATION NECESSARY TO STRUCTURE FUTURE STUDIES AND TECHNOLOGY PROGRAMS AIMED AT DEVELOPING AN ANTI- RADIATION MISSILE CAPABLE OF HOMING ON

    SBC: Cas Inc.            Topic: N/A

    THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO PROVIDE THE DESIGNER OF AN TI-RADIATION HOMING MISSILES WITH THE INFORMATION NECESSARY TO STRUCTURE FUTURE STUDIES AND TECHNOLOGY PROGRAMS AIMED AT DEVELOPING AN ANTI- RADIATION MISSILE CAPABLE OF HOMING ON THREAT RADIATION MISSILE CAPABLE OF HOMING THREAT RADARS UTILIZING SPREAD SPECTRUM TECHNIQUES. THIS INVOLVES THE FOLLOWING TWO TASKS: 1. DEFINE THE C ...

    SBIR Phase I 1983 Department of DefenseAir Force
  3. AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE

    SBC: Engineering Analysis Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  4. (BMDATIC) TECHNOLOGY BASE MANAGEMENT INFORMATION SYSTEM

    SBC: ENGINEERING AND SCIENTIFIC RESEARCH ASSO            Topic: N/A

    EER PROPOSES TO CONDUCT A 4 1 MAN MONTH EXPLORATORY DEVELOPMENT EFFORT WHICH WILL FOCUS UPON THE FESIBILITY OF ADAPTING A PREVISOUSLY DEVELOPED MANAGEMENT TOOL WHICH IS CAPABLE OF IDENTIFYING BOTH HIERARCHIAL AND RELATIONAL DATA BASE ATTRIBIUTES. SPECIFICALLY,EER PROPOSES TO ADAPT A REQUIREMENTS DATA BASE TOOL THAT IS CAPABLE OF BEING IDENIFIED IN TERMS OF A MAJOR SYSTEM CONSTRUCTOR IN TERMS OF WR ...

    SBIR Phase I 1983 Department of DefenseArmy
  5. GROWTH OF GAAS USING ION CLUSTER BEAM TECHNOLOGY

    SBC: ETONNET, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  6. CRASHWORTHNESS REQUIRE A CUSHION OF MINIMUM THICKNESS TO MINIMIZE DYNAMIC OVER-SHOOT OCCURRING DURING

    SBC: Simula, Inc.            Topic: N/A

    LOAD-ATTENUATING SEAT CUSHIONS DESIGNED FOR CRASHWORTHY SEATING SYSTEMS MUST SERVE A DUAL PURPOSE. SUFFICIENT CUSHIONING MUST BE USED TO EVENLY DISTRIBUTE CONTRACT LOADS TO AVOID CONTARACT LOADS TO AVOID PRESSURE POINTS THAT CAN CAUSE DISCOMFORT,BUT THE DEMANDS OF CRASH LOADING. ALSO, THE RIGORS OF FIELD USE CAN SERIOUSLY DEGRADE MATERIALS COMMONLY IN USE. THEREFORE, THE DESIGN OF CRASHWORTHY CUSH ...

    SBIR Phase I 1983 Department of DefenseArmy
  7. DETECTION OF FATIGUE CRACKS IN MILITARY BRIDGES AND STRUCTURES

    SBC: Spectra Research, Inc.            Topic: N/A

    UNDER STEDILY REPEATED CYCLIC LOADING IMPOSED BY LIVE LOADS, FATIGUE CRACKS IN BRIDGES CAN BE INITIATED AT SMALL DEFECTS. BECAUSE DEFECTS CAN ELIMINATE THE INITIAL STAGE OF CRACK GROWTH, THE FATIGUE LIFE IS GREATLY REDUCED, ESPECIALLY IF FRACTURE IS CONTROLLED BY CRACK INITIATION. THEREFORE, THE FATIGUE CRACK GROWTH PROCESS IS REDUCE TO CRACK PROPAGATION AND UNSTABLE CRACK GROWTH. FATIGUE STUDIES ...

    SBIR Phase I 1983 Department of DefenseArmy
  8. IMPROVEMENTS, MAINTENANCE AND REFURBISHMENT

    SBC: Spectra Research, Inc.            Topic: N/A

    THIS RESEARCH ADDRESSES TECHNIQUES AND MATERIALS FOR ON-ORBIT MAINTENANCE AND REFURBISHMENT OF THERMAL CONTROL SURFACE COATINGS USED ON LONG-LIFE SPACECRAFT. IN MANY CASES, CONSERVATIVE ASSUMPTIONS ON THE EFFECTS OF LONG-TERM DEGRADATION HAVE DRIVEN THE DESIGN OF SPACECRAFT THERMAL SYSTEMS TOWARD OVER CAPACITY WHICH RESULTS IN WEIGHT, SIZE, COMPLEXITY, AND COST PENALTIES. IF CRITICAL SURFACES COUL ...

    SBIR Phase I 1983 Department of DefenseAir Force
  9. RESEARCH ON LARGE, HIGHLY ACCURATE INFLATABLE REFLECTORS

    SBC: Spectra Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  10. PORTABLE SOLAR POWERED WATER PURIFICATION AND DESALINATION SYSTEM DEVELOPMENT

    SBC: Spectra Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government