You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED COMPOSITE MATERIALS FOR LIGHTWEIGHT ROTOCRAFT/AIR-VEHICLE SYSTEM COMPONENTS

    SBC: ATS-MER, LLC            Topic: N/A

    CHRONIC NEEDS FOR HIGHER PERFORMANCE IN PRESENT AND FUTURE ARMY ROTOCRAFT/AIR-VEHICLE SYSTEMS MANDATE IMPROVEMENTS IN MATERIALS PROPERTIES. LIGHTWEIGHT METAL MATRIX COMPOSITES (MMC) INCLUDING MAGNESIUM AND ALUMINUM ARE AMONG THE BEST CANDIDATES TO FULFILL THE REQUIREMENTS THAT ENABLE LIGHTWEIGHT STRUCTURES, ADVANCED PROPULSION, TRANSMISSIONS, ROTORS, THRUST DEVICES, ETC. A UNIQUE COATINGS APPROACH ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. BROADBAND OPTICAL COMMUNICATION TECHNOLOGY FOR FAULT TOLERANT FIBER OPTIC NETWORKS, PROVIDING INCREASED PERFORMANCE, THROUGHPUT, AND CAP

    SBC: Phoenix Digital Corpon            Topic: N/A

    DOD OPTICAL COMMUNICATION REQUIREMENTS HAVE MOVED BEYOND THE PERFORMANCE CAPABILITIES OF CONVENTIONAL FIBER OPTIC COMMUNICATION TECHNOLOGIES. CONVENTIONAL OPTICAL COMMUNICATION NETWORKS ARE LIMITED TO BASEBAND COMMUNICATION. HOWEVER, BREAKTHROUGHS IN NEW, BIREFRINGENT CRYSTAL TECHNOLOGY COMBINED WITH THE APPLICATION OF NEW HEURISTIC TECHNIQUES FOR OPTICAL LASER POWER MODULATION MAKE IT POSSIBLE TO ...

    SBIR Phase I 1991 Department of DefenseNavy
  3. CDTE OPTICAL COMPONENTS IN LONG WAVELENGTH INFRARED SYSTEMS

    SBC: Xacton Corp            Topic: N/A

    INFRARED SYSTEMS ARE NEEDED FOR A VARIETY OF DEFENSE RELATED APPLICATIONS, SUCH AS: SURVEILLANCE, TARGET DETECTION, ACQUISITION AND TRACKING, MISSILE GUIDANCE, ETC. FOR MANY APPLICATIONS SUCH AS THOSE INVOLVING COLD-DIM TARGETS, THESE SYSTEMS NEED TO OPERATE IN THE VERY LONG WAVELENGTH REGION OF THE INFRARED SPECTRUM, E.G. 15-35 MICRONS CUTOFF. IN THIS WAVELENGTH REGION, THE AVAILABILITY OF SUITAB ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  4. CONCEPT DEVELOPMENT FOR AN AIRBAG CRASH-PROTECTION SYSTEM

    SBC: Simula, Inc.            Topic: N/A

    THE LATEST U.S. ARMY PRODUCTION HELICOPTERS INCLUDE CREWSEATS WHICH SIGNIFICANTLY REDUCE THE PROBABILITY OF SPINAL INJURY DUE TO VERTICAL IMPACT FORCES. HOWEVER, THE RISK OF INJURY TO THE UPPER TORSO AND HEAD DUE TO SECONDARY IMPACTS IS STILL UNACCEPTABLY HIGH. ONE OF THE REASONS FOR THIS IS THAT THE STANDARD FIVE-POINT RESTRAINT SYSTEM IS NOT DESIGNED TO RESTRAIN LATERAL MOTION, AND IMPACTS WITH ...

    SBIR Phase II 1991 Department of DefenseArmy
  5. CONTROLLED MICROSTRUCTURAL DEVELOPMENT OF SI(3)N(4) TO ENHANCE FRACTURE TOUGHNESS

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  6. DEVELOPMENT OF ALUMINUM ALLOYS FOR USE IN- 9OOF FASTENER APPLICATIONS

    SBC: ATS-MER, LLC            Topic: N/A

    THERE IS A CHRONIC NEED FOR LIGHTER YET STRONGER MATERIALS FOR BOTH AMBIENT AND ELEVATED TEMPERATURE APPLICATIONS IN BOTH IAILITARY AND COMMERCIAL SECTORS. ONE REQUIREMENT IS FOR A 9OODEGF ALUMINUM FASTENER COMPATIBLE WITH ALUMINUM AND TITANIUM ALLOYS. MECHANICAL ALLOYING/RAPID SOLIDIFICATION PROCESSING USING INTERMETALLIC AND SPINEL DISPERSIONS HAVE DEMONSTRATED PROMISE FOR INCREASING THE SERVICE ...

    SBIR Phase I 1991 Department of DefenseAir Force
  7. DEVELOPMENT OF PLASMA SYNTHESIS TO PRODUCE PRE-ALLOYED ULTRAFINE INTERMETALLIC ALUMINIDE POWDERS FOR INJECTION MOLDING

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  8. FABRICATION AND TESTING OF A LOW COST PULSE JET

    SBC: M-DOT Aerospace            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. FAILURE INVESTIGATION OF CERAMIC ARMOR BACKED BY ALUMINUM OR ALUMINUM MATRIX COMPOSITE SUPPORT-PLATES

    SBC: Lanxide Corporation            Topic: N/A

    IT IS PROPOSED THAT THE BALLISTIC PERFORMANCE OF TIB2 CERMAIC ARMOR TILES BACKED UP BY A VARIETY OF LIGHTWEIGHT SUPPORT-PLATES BE INVESTIGATED BY 1MEV FLASH X-RAY EQUIPMENT DURING PENETRATION, AND BY MACROSCOPIC AND MICROSCOPIC OBSERVATIONS OF RECOVERED TARGETS. THE SUPPORT-PLATE TEST MATRIX INCLUDES TWO MATERIALS (A STRUCTURAL ALUMINUM ALLOY AND A CERAMIC REINFORCED ALUMINUM MATRIX COMPOSITE), TW ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  10. FIRE CONTROL BATTLE MANAGEMENT AND DECISION SUPPORT SYSTEM TECHNOLOGY (DECISION SUPPORT SYSTEM TECHNOLOGY WITHIN EMBEDDED...)

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government