List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. "AN ELECTRONICALLY SCANNED IMPULSE RADAR FOR THE DETECTION OF MINES"

    SBC: Anro Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  2. "BIOPOLYMER- BASED NONLINEAR OPTICAL MATERIALS"

    SBC: CAMBRIDGE SCIENTIFIC, INC.            Topic: N/A

    RECENT DEVELOPMENT OF MATERIALS WITH LARGE SECOND AND THIRD ORDER NONLINEAR EFFECTS HAS GENERATED INTEREST IN APPLICATIONS TO FUTURE TELECOMMUNICATIONS AND ELECTRONIC SYSTEMS. THE IDEAL NONLINEAR OPTICAL MATERIAL (NLOM) FOR MOST APPLICATIONS WOULD HAVE A VERY LARGE NONLINEAR RESPONSE, EXTREMELY LOW SWITCHING THRESHOLDS AND RAPID SWITCHING TIMES. POPULAR APPROACHES FOR THE GENERATION OF POLYMERS EX ...

    SBIR Phase I 1992 Department of DefenseAir Force
  3. A CLOUD FORECASTER FOR RV LAUNCHES

    SBC: Ktaadn Inc.            Topic: N/A

    THE OBJECTIVES WILL BE: (1) AN ASSESSMENT OF EXISTING ANALYTICAL TOOLS FOR PREDICTING CLOUD-FREE FIELDS-OF-VIEWS (CFFOV) AND (2) A SPECIFICATION OF A NEW MODEL FOR IMPROVING CFFOV FORECASTS. A REVIEW OF EXISTING CLOUD MEASUREMENT AND MODELING EFFORTS WILL BE MADE. AN IMPROVED MODEL (\CFFOV PREDICTOR\) BASED ON GENERALIZED, NONLINEAR TEMPORAL PREDICTION BY NEURAL NETWORKS TRAINED ON CFFOV DATA WILL ...

    SBIR Phase II 1992 Department of DefenseMissile Defense Agency
  4. A COLD FLOW TEST FACILITY FOR IR SUPPRESSORS

    SBC: Aerodyne Research, Inc.            Topic: N/A

    THE PRESENT NEED TO TEST IR SUPPERSSORS ON APPLICATION ENGINES INCURS SIGNIFICIANT COSTS DUE TO THE REQUIREMENTS OF A FULL-SCALE ENGINE INCLUDING: ITS FUEL UE, SAFE EXHAUST DISPOSAL, AND THE NECESSITY OF UTILIZING FULL-SCALE, HEAT-RATED SUPPRESSOR PROTOTYPES. THESE COSTS CAN BE REDUCED USING A CORRECTLY SCALED AMBIENT TEMPERATURE TEST FACILITY. RELIABLE ESTIMATES OF GAS TURBINE ENGINE EXHAUST SYST ...

    SBIR Phase II 1992 Department of DefenseArmy
  5. A Compact Borazane Hydrogen Generator for a Soldier Fuel Cell Power System

    SBC: PROTONEX TECHNOLOGY CORP.            Topic: A05034

    Lightweight and compact power sources are a critical need to a broad range of defense, homeland security and communication applications. Proton exchange membrane (PEM) hydrogen/air fuel cells coupled with chemical hydride fuels such as borazane which are gravimetrically high in extractable hydrogen content can provide quiet, lightweight solutions to the escalating energy demands of the modern sol ...

    SBIR Phase I 2005 Department of DefenseArmy
  6. A FIBER OPTIC AQUEOUS PHASE TRICHLOROETHYLENE SENSING INSTRUMENT

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  7. A FLEXIBLE DISTRIBUTED INTERACTIVE SIMULATION ADAPTER UNIT (DAU) FOR INTERCONNECTING EXISTING SIMULATORS

    SBC: MAK TECHNOLOGIES            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  8. A FRAMEWORK FOR DYNAMIC INFORMATION SYSTEM INTEGRATION

    SBC: I-Kinetics, Inc.            Topic: N/A

    DEVELOPMENT OF BATTLE MANAGEMENT/COMMAND, CONTROL, AND COMMUNICATION SYSTEMS (BM/C3) PRESENT SIGNIFICANT INTEGRATION, AUTHENTICATION, AND CONCURRENCY CONTROL PROBLEMS. DIFFICULT INTEGRATION PROBLEMS ARE CAUSED BY THE WIDE RANGE OF APPLICATIONS REQUIRED BY BM/C3. SUCH SYSTEMS INCLUDE: OPERATIONAL SUPPORT APPLICATIONS, DATABASES, SIMULATION, TELEMETRY MANAGEMENT, AND NEW TECHNOLOGIES SUCH AS KNOWLED ...

    SBIR Phase I 1992 Department of DefenseArmy
  9. A High Fidelity Digital Interference Generator (DIG) with an Electromagnetic Wavefront Generator (EWG)

    SBC: Bedford Signals Corporation            Topic: AF04279

    The Air Force is looking to develop an open-air jamming and interference test capability, that does not require jamming clearance from the FAA. The system must be able to provide realistic system level tests for GPS receivers, antennas, and amplifiers. Bedford Signals proposes the advanced development of innovative technologies to enable a Completely Integrated Jamming Test System (CIJTS): an Elec ...

    SBIR Phase II 2005 Department of DefenseAir Force
  10. A HIGH THRUST DENSITY, C60 CLUSTER, ION THRUSTER

    SBC: Busek Co., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government