You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ABL Smart Piping System for Containment and Control of Highly Corrosive and Hazardous Chemicals
SBC: Odyssian Technology, L.L.C. Topic: MDA03030During this program, multifunctional (smart) piping system technology will be developed for used on the Airborne Laser (ABL). This system, which was demonstrated in phase I, has a multifunctional design with integrated containment and leak detection functionality. The smart piping system design uses lightweight materials in conjunction with integrated sensors to achieve an advanced lightweight pi ...
SBIR Phase II 2005 Department of DefenseMissile Defense Agency -
Acoustic Intensity Localization System
SBC: Applied Physical Sciences Corp. Topic: N04T020Applied Physical Sciences Corp. (APS) proposes the Phase II development of an Acoustic Intensity Localization System (AILS). AILS utilizes a vector hydrophone to measure the latitude-longitude offset to an acoustic projector attached to surface buoy whose position is known via GPS. A major advantage of the AILS concept is that it can operate with extreme precision even at relatively low frequenc ...
STTR Phase II 2005 Department of DefenseNavy -
ADAPTIVE MULTISPECTRAL FILTER
SBC: CIENCIA INC Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseMissile Defense Agency -
Advanced Biomechanical and Physiological Monitoring System for Amputees and Rehabilitating Personnel
SBC: TENXSYS, INC. Topic: OSD05H11This SBIR Phase I project will develop a health and motion monitoring sensor and analysis system to support the return of military personnel with prosthetic devices to active duty. DoD is allowing increasing numbers of Soldiers with prosthetics to return to active duty if they are performance capable, minimizing the loss of their valuable core expertise to the services. There are significant cha ...
SBIR Phase I 2005 Department of DefenseArmy -
Advanced 2212 BSCCO Superconductors
SBC: Intermagnetics General Corp Topic: N/APhase I work wil focus on developing a stabilizer which surrounds the high temperature superconductor, with improved mechanical strength. To date, silver (Ag) has been the preferred stabilizer because it allows oxygen to easily penetrate during heat treatments and does not adversely react with the HTS material, decreasing the superconducting properties. However, the mechanical properties of anneal ...
SBIR Phase I 1992 Department of DefenseMissile Defense Agency -
Advanced Commercially Available Inherently Radhard Primitive Cell Designs.
SBC: American Semiconductor, Inc. Topic: AF05018The Air Force Research Laboratory (AFRL), Military Satellite Communication (MILSATCOM), and National Aeronautics and Space Administration (NASA) have a current and future need for advanced commercially available inherently radhard primitive cell libraries to support new designs for satellites and other spacecraft. American Semiconductor Inc. proposes the use of double gated Flexfet technology for ...
SBIR Phase I 2005 Department of DefenseAir Force -
ADVANCED FABRICATION METHODS FOR HIGH PERFORMANCE THERMAL DETECTORS
SBC: JET PROCESS CORP Topic: N/AHIGH DETECTIVITY II-VI SEMICONDUCTOR FAR-IR DETECTOR ARRAYS HAVE EXISTED FOR OVER A DECADE. THEY ARE THE ENABLING COMPONENT IN IR IMAGING DEVICES USED IN CRITICAL MILITARY SURVEILLANCE AND WEAPONS GUIDANCE SYSTEMS. HOWEVER, THERE DETECTORS ARE NOT SUITABLE FOR ALL APPLICATIONS BECAUSE THEY REQUIRE COOLING TO CRYOGENIC TEMPERATURES. CONSEQUENTLY, THERE IS A NEED TO DEVELOP NEW PROCESS TO FABRICATE ...
SBIR Phase I 1992 Department of DefenseArmy -
ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS
SBC: General Network Corp. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
ADVANCED SECONDARY GAS PATH METHODOLOGY
SBC: SCIENTIFIC RESEARCH ASSOC., INC. Topic: N/AAN INNOVATIVE APPROACH IS PROPOSED TO DEVELOP AN INLET/FAN COMPRESSION SYSTEM DESIGN METHODOLOGY FOR THOSE COMPONENTS FOR WHICH THE INLET AND FAN HAVE A STRONG MUTUAL INTERDEPENDENCE AND CANNOT BE CONSIDERED SEPARATELY. THE PROPOSED PHASE I/PHASE II EFFORT WOULD BE PERFORMED WITH SRA AS THE PRIME CONTRACTOR AND TELEDYNE CAE AS A SUBCONTRACTOR. UNDER THIS PROGRAM AN EXISTING STATE-OF-THE-ART NAVIER ...
SBIR Phase II 1992 Department of DefenseAir Force -
Advanced Stress Measurement Technologies for Small Turbine Engines
SBC: AERODYN ENGINEERING, INC. Topic: A04083Aerodyn proposes to develop a new concept in slip ring design that would culminate in a new class of high speed slip rings that could operate up to 90,000 RPM with 50 contacts (25 channels), be capable of handling temperatures up to 700 °F without external cooling support, have a bandwidth of 200 KHz, weigh less than 2 lb, and be designed to directly support new developments in small turboshaft e ...
SBIR Phase I 2005 Department of DefenseArmy