You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Accelerator for UAV Modeling in Near-Ship Environments Based on Commodity Graphics Cards

    SBC: EM PHOTONICS INC            Topic: N07T004

    UAVS (Unmanned Aircraft Vehicle System) integration with naval vessels is currently realized in limited form. This is largely due to the fact that the operational envelopes of these vehicles are based solely on at-sea flight testing. In addition to the complexities involved with at-sea flight testing, the unsteady nature of ship-airwakes and the use of automated UAV control software necessitates ...

    STTR Phase I 2007 Department of DefenseNavy
  2. Advanced Biomechanical and Physiological Monitoring System for Amputees and Rehabilitating Personnel

    SBC: TENXSYS, INC.            Topic: OSD05H11

    This SBIR Phase II project will develop and build a health monitoring sensor and analysis system to support the return of military personnel with prosthetic devices to active duty. DoD is allowing increasing numbers of soldiers with prosthetics to return to active duty if they are performance capable, minimizing the loss of their valuable core expertise to the services. There are significant cha ...

    SBIR Phase II 2007 Department of DefenseArmy
  3. An Extensible Framework for Rapid Fuselet Composition

    SBC: ORIELLE, LLC            Topic: N/A

    We propose to develop scripting language enhancements to enable the rapid synthesis of publish-subscribe fuselets through a unified framework for subscription and resource discovery based on XPath and XQL extensions, to design and prototype itsimplementation in an extensible manner by mapping onto existing interpreter and runtime infrastructures using a combination of dynamic source-to-source tran ...

    SBIR Phase I 2001 Department of DefenseAir Force
  4. A Novel Fiber Optic System for Measuring The Dynamic Structural Behavior of Barachutes

    SBC: PROLOGIC, INC.            Topic: N/A

    In the domain of weapon/fire control systems, embedded software will be a key costdriver in the next generation. The omnipresence of embedded systems in today's marketand the quality of requirements that these systems are expected to meet, put a greatdeal of pressure to bear on the techniques used to develop these systems.The technical objectives of the Phase II SBIR are to:(1) Build a scaleable I ...

    SBIR Phase II 2001 Department of DefenseArmy
  5. Artificial Intelligence Hybrid Range Scheduler

    SBC: QUANTUM LEAP INNOVATIONS, INC.            Topic: N/A

    Scheduling is a complex, NP-hard problem that challenges the use of any single solution technique. In Phase I, we built a model that uses our multi-technique Quantum Leap Problem Solving Engine to solve a representative but simplified version of the AirForce Satellite Control Network (AFSCN) contact scheduling problem. The system demonstrated that it could schedule the hundreds (500 to 600) of t ...

    SBIR Phase II 2001 Department of DefenseAir Force
  6. Artificial Intelligence Hybrid Range Scheduler

    SBC: QUANTUM LEAP INNOVATIONS, INC.            Topic: N/A

    Scheduling is a complex, NP-hard problem that challenges the use of any single solution technique. In Phase I, we built a model that uses our multi-technique Quantum Leap Problem Solving Engine to solve a representative but simplified version of the AirForce Satellite Control Network (AFSCN) contact scheduling problem. The system demonstrated that it could schedule the hundreds (500 to 600) of t ...

    SBIR Phase I 2001 Department of DefenseAir Force
  7. A Sensor for Relative Position and Attitude Determination

    SBC: Radio-Hydro-Physics LLC            Topic: SB072039

    Design miniaturized sensor based on Dispersed Fourier Transform Spectrometer ("DFTS") technology to provide 3-space position and attitude determination between host and target satellites. The DFTS has demonstrated a capability to establish orbital accuracies in near-real-time at an accuracy of 0.5 meters in range as well as position against the plane of the sky. Even higher accuracies are anticip ...

    SBIR Phase I 2007 Department of DefenseDefense Advanced Research Projects Agency
  8. Automated Reasoner Technology for Managing Military Aircraft

    SBC: SENTIENT SCIENCE CORPORATION            Topic: N06023

    Comprehensive health monitoring systems are fielded on some Navy aircraft, including the Integrated Aircraft Health Monitoring (IAHM) on the F/A-18, and rotorcraft Health and Usage Monitoring Systems (HUMS) on a subset of the Navy’s H-60 and H-53 inventory. Due to the early successes and benefits shown by these systems, new platforms such as JSF will have even more comprehensive Prognostic Healt ...

    SBIR Phase II 2007 Department of DefenseNavy
  9. Bi-Directional Power Converters

    SBC: CREATIVE ENERGY SOLUTIONS, INC.            Topic: N06163

    The founders of CES have identified three shortcomings of the proposed Integrated Fight Through Power (IFTP) system. The system’s lack of galvanic isolation will lead to ship-wide ground fault problems. The system’s inability to incorporate alternative power sources (fuel cells or energy storage systems) results from unidirectional power flow. The system’s use of non-commercial bus voltag ...

    SBIR Phase I 2007 Department of DefenseNavy
  10. Compact, Lightweight, Low-Cost, Permanently-Aligned Infrared Spectrometers

    SBC: MANNING APPLIED TECHNOLOGY            Topic: N/A

    Military, government and civilian personnel need timely and cost-effective warning of chemical and biological hazards in many arenas.Timely warning allows for effective personnel protection. ManningApplied Technology proposes to construct a novel Fouriertransform-infrared spectrometer which is modular, compact, costs less than $5000in quantity, and is optically tilt-compensated. The proposed des ...

    SBIR Phase I 2001 Department of DefenseArmy
US Flag An Official Website of the United States Government