You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A DIS/HLA Datalink Emulator and Linkalyzer for Application to JTIDS/MIDS Application to Air Support Operations

    SBC: NAVMAR APPLIED SCIENCES CORP            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  2. ADVANCED HEAT SHIELD MATERIALS

    SBC: GENERAL SCIENCES INC            Topic: N/A

    THIS PROPOSAL DESCRIBES THE EFFORTS REQUIRED TO STUDY THE EFFECTS OF VARIOUS MATERIALS ON THE REDUCTION OF ELECTRONIC INTERFACE IN THE PLASMA OF A RE-ENTRY VEHICLE HEAT SHIELD. A FUNDEMENTAL UNDERSTANDING OF THE MECHANISM BY MEANS OF WHICH THESE MATERIALS ACHIEVE A REDUCTION IN ELECTRONIC INTERFERENCE IS THE GOAL OF THE PROPOSED INVESTIGATIONS, IN WHICH THE GSI FLAME TEST APPARATUS IS USED TO DETE ...

    SBIR Phase II 1993 Department of DefenseAir Force
  3. Advanced Wave Rotor, Fluid-Fluid Energy Exchanger

    SBC: Unistry Assoc., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  4. ANALYSIS OF E-2C LONG DURATION MISSIONS

    SBC: CHI SYSTEMS INC            Topic: N/A

    CHI Systems Inc, proposes to study the E-2C mission and to determine the conditions under which its traditional 4-5 hour duration can be extended without additional detrimental effects on aircrew performance. In Phase I we will (1) identify and assess key factors in E-2C fatigue via knowledge acquisition from current aircraft domain experts using interview, survey, and literature search, (2) make ...

    SBIR Phase I 1993 Department of DefenseNavy
  5. An Improved Munition Container for Reduced Hazard Classification

    SBC: Dyna East Corp.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  6. AN INFORMATION SYSTEM FOR ECM/ESM CONTACTS

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    THE PROPOSED PROJECT IS TO DEVELOP AN INFORMATION SYSTEM FOR PROCESSING ECM/ESM CONTACT REPORTS ON BOARD A NAVY SURFACE SHIP. THE SYSTEMWILL COMBINE REPORTS FROM ORGANIC AND REMOTE (0TH) SENSORS WITH OTHER AVAILABLE INFORMATION AND WITH REASONABLE ASSUMPTIONS CONCERNING TARGET TACTICS IN ORDER TO PROVIDE INFORMATION OF VALUE TO THE MISSION COMMANDER. OUR APPROACH IS TO COMBINE TWO EXISTING SYSTEMS ...

    SBIR Phase II 1993 Department of DefenseNavy
  7. A Novel Ultrasonic B-Scan Technique For One-Sided Inspection Of Thick Composites With Complex Surface Shapes

    SBC: Strainoptic Technologies, Inc.            Topic: N/A

    A high power low frequency, frequency bandwidth control ultrasonic sector B-scan system with specially designed sector scan transducers is proposed for the internal or under water one-sided inspection of thick (at least 3") composite components with complex surface shapes. This technique is based on the following considerations for ultrasonic NDT of thick composite components: high attenuation, lo ...

    SBIR Phase I 1993 Department of DefenseNavy
  8. ANTHROPOMETRIC GUIDANCE FOR E-2C CREWSTATION REDESIGN

    SBC: CHI SYSTEMS INC            Topic: N/A

    CHI Systems proposes to develop and exercise a methodology that will enable pilot anthropometry and eye positioning data to be used to optimize the selection and placement of electronic displays in the E-2C cockpit. In Phase I we will (1) define electronic information display options and human factors issues that impact display selection and placement, (2) identify E-2C critical pilot tasks that i ...

    SBIR Phase I 1993 Department of DefenseNavy
  9. ANTIMULTIPATH SYSTEM FOR MEASUREMENT OF ULTRALOW SIDELOBE ANTENNA PATTERNS

    SBC: ZEGER-ABRAMS, INC.            Topic: N/A

    A NOVEL TECHNIQUE IS PROPOSED WHICH WILL ALLOW THE RESOLUTION, ANALYSIS, AND SUPPRESSION OF THE MULTIPATH COMPONENTS OF AN ANTENNA RANGE MEASUREMENT TEST SIGNAL% THE TECHNIQUE ACHIEVES TIME DELAY RESOLUTION MUCH FINER THAN THE RECIPROCAL OF THE BANDWIDTH OF THE TEST SIGNAL* AS A RESULT, ULTRA LOW SIDELOBE ANTENNA MEASUREMENTS CAN BE MADE IN REAL TIME WITHOUT USING AN ULTRA WIDEBAND TEST SIGNAL AND ...

    SBIR Phase II 1993 Department of DefenseAir Force
  10. COMPUTER-AIDED DESIGN & SYNTHESIS SYSTEM FOR ELECTRONIC SYSTEM DESIGN

    SBC: Omniview Inc.            Topic: N/A

    THERE IS A RAPIDLY GROWING NEED FOR TOOLS FOR THE DESIGN AND SYNTHESISOF ELECTRONIC SYSTEMS AND MULTI-DEVICE CIRCUITS: TO SUPPORT GREATER CLOCK SPEEDS; PACKAGING DENSITITES AND CIRCUIT COMPLEXITY; TO ENABLE DESIGNERS TO RAPIDLY CREATE AND COMPARE ALTERNATIVE DESIGN CONCEPTS; TO ELIMINATE MULTIPLE RE-DESIGN CYCLES; AND TO ENABLE REUSE OF PRIOR DESIGN KNOWLEDGE. THERE ARE NO CAE TOOLS COMMERCIALLY A ...

    SBIR Phase II 1993 Department of DefenseAir Force
US Flag An Official Website of the United States Government