You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. 197-412

    SBC: System Planning Corp.            Topic: N/A

    DEVELOPMENT OF INNOVATIVE APPROACHES TO ENHANCING THE GROUND C3 SEGMENT SURVIVABILITY OF SPACE SYSTEMS REQUIRES A METHOD FOR MODELING THE SURVIVABILITY OF THE GROUND SEGMENTS OF SUCH SYSTEMS IN ORDER TO ALLOW COMPARATIVE EVALUATION OF APPROACHES AND SELECTION OF THE MOST EFFECTIVE ONE FOR DEVELOPMENT. SPC HAS DEVELOPED A COMPUTER MODEL OF THE PHYSICAL SURVIVABILITY OF SUCH SYSTEMS. GIVEN RELEVANT ...

    SBIR Phase I 1984 Department of DefenseAir Force
  2. ABSORPTION CAPABILITY

    SBC: Artech Corp            Topic: N/A

    SENSITIVITY OF STELLAR GUIDANCE OPTICS IS LIMITED BY REFLECTION OF STRAY LIGHT INSIDE THE OPTICAL SYSTEM. IMPROVEMENT BY 50-100% OR MORE CAN BE OBTAINED WITH A BLACK COATING, DISCOVERED BY CHARLES FELDMAN AT JOHNS HOPKINS APPLIED PHYSICS LABROATORY, CONSISTING OF SUBMICROSCOPIC COLUMNS OF AMORPHOUS SILICON PRODUCED BY ETCHING THE SURFACE OF A SOLID SILICON LAYER. THE PROGRAM, WITH DR. FELDMAN AS C ...

    SBIR Phase I 1984 Department of DefenseNavy
  3. ACOUSTIC SEA BOTTOM CLASSIFICATION: A REQUIREMENT ANALYSIS

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  4. ADAPTIVE RESOURCE ALLOCATION FOR ADVACED ELINT\ESM SYSTEMS

    SBC: Greenbriar Systems Inc.            Topic: N/A

    THIS PROPOSAL ADDRESSES ELINT\ESM SIGINAL PROCESSING RESEARCH FOR REAL-TIME DETECTION IDENTIFICATION AND LOCATION OF THREAT RADAR EMITTERS ON THE BATTLEFIELD. GIVEN THE PREDICTED FUTURE GROWTH OF PULSE DENSITIES IN THE ELECTRONIC ENVIORNMENT, AND THE PROLIFERATION OF AGILE RADARS, IT IS NECESSARY TO DEVELOP MORE SOPHISTICATED ELINT\ESM SYSTEMS. AN ARCHITECTURE IS PRESENTED FOR A COMPUTER-BASED, AD ...

    SBIR Phase II 1984 Department of DefenseArmy
  5. A DIGITAL ENCODING SCHEME FOR THE ARCHIVAL, STORAGE, AND SUBSEQUENT TRANSMISSION OF COLOR GRAPHIC IMAGES WILL BE DEVELOPED.

    SBC: Dvp, Inc.            Topic: N/A

    A DIGITAL ENCODING SCHEME FOR THE ARCHIVAL, STORAGE, AND SUBSEQUENT TRANSMISSION OF COLOR GRAPHIC IMAGES WILL BE DEVELOPED. THIS SCHEME WILL ACCOMMODATE RAPID RESPONSE TIMES AND ALLOW FOR FUTURE IMPROVEMENTS AND MODIFICATIONS IN A WELL-DEFINED AND ECONOMIC MANNER. THE TECHNIQUE PROPOSED TO ACCOMPLISH THIS TASK IS BASED ON A PICTURE MATRIX TRANSFORMATION, WHICH IS BASED ON THE S-TRANSFORM CODING SC ...

    SBIR Phase I 1984 Department of DefenseNavy
  6. ADVANCED ASW WEAPONS TECHNOLOGY EVALUATION STRATEGY

    SBC: Defense Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  7. ADVANCED UNDERSEA TACTICAL COMMUNICATIONS TECHNIQUES

    SBC: Defense Systems Inc.            Topic: N/A

    THERE IS AN INCREASING NEED FOR LONG RANGE (200KM) APPROXIMATELY 10 BPS RATE ACOUSTIC COMMUNICATION AT LOW BIT ERROR RATES IN THE COMMAND AND CONTROL OF ACOUSTIC SURVEILLANCE SYSTEM ELEMENTS, UNDERWATER VEHICLES AND SENSORS. SIMULATED FISH NOISE, CODED TONE AND MULTITONE CW SIGNALS HAVE BEEN USED WITH VARYING SUCCESS. ONLY THE M-ARY, MULTITONE, LONG BAND LOW FREQUENCY WAVEFORMS ARE PRACTICAL FOR L ...

    SBIR Phase II 1984 Department of DefenseDefense Advanced Research Projects Agency
  8. AN AUTOMATIC DECISION AID, USEABLE ON A MINI/MICRO-COMPUTER WILL BE DEVELOPED TO ANALYZE CAUSES OF ACCIDENTS/MALFUNCTIONS IN U.

    SBC: Doty Associates Inc.            Topic: N/A

    AN AUTOMATIC DECISION AID, USEABLE ON A MINI/MICRO-COMPUTER WILL BE DEVELOPED TO ANALYZE CAUSES OF ACCIDENTS/MALFUNCTIONS IN U. S. AIR FORCE AIRCRAFT. THE PROTOTYPE MODEL WILL PROVIDE THE NUMBER OF OCCURRENCES OF EACH PROBLEM FOR BOTH INDIVIDUAL AIRCRAFT TYPES AND FOR THE AIR FORCE AS A WHOLE. DATA WILL BE EXTRACTED AS A FUNCTION OF DESIRED INPUT AIRCRAFT PARAMETERS, SUCH AS LOADING, MISSION, ETC. ...

    SBIR Phase I 1984 Department of DefenseAir Force
  9. AN INVESTIGATION WILL BE PERFORMED TO EVALUATE THE EFFECTIVENESS OF ESM CONCEPTS FOR ENHANCED CRUISE MISSILE SYSTEMS.

    SBC: Processing Research Inc            Topic: N/A

    AN INVESTIGATION WILL BE PERFORMED TO EVALUATE THE EFFECTIVENESS OF ESM CONCEPTS FOR ENHANCED CRUISE MISSILE SYSTEMS. THE OBJECTIVE IS TO EVALUATE THE PERFORMANCE OF VARIOUS RECEIVER AND RECOGNITION TECHNIQUES USING EMITTER SIGNAL CHARACTERISTICS, INCLUDING INTRAPULSE AND INTERPULSE. CHARACTERISTICS INCLUDE RF, FREQUENCY MODULATION ON PULSE, PHASE MODULATION ON PULSE, UNINTENTIONAL MODULATION ON P ...

    SBIR Phase I 1984 Department of DefenseNavy
  10. APPLICATION OF DIFFERENTIAL GPS TO EXPEDITIONARY AIR FIELD NAVIGATION AND SURVEILLANCE REQUIREMENTS

    SBC: Stanford Telecommunications            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government