You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FINITE ELEMENT-BOUNDARY INTEGRAL METHOD FOR SCATTERING AND RADIATION FROM MICROSTRIP ANTENNAS/ARRAYS

    SBC: Summitec Corp.            Topic: N/A

    A NEW HYBRED METHOD FOR THE ANALYSIS OF THE SCATTERING AND RADIATION BY CONFORMAL ANTENNAS AND ARRAYS. THE METHOD EMPLOYS A FINITE ELEMENT FORMULATION WITHIN THE CAVITY AND THE BOUNDARY INTEGRAL (EXACT BOUNDARY CONDITION) FOR TERMINATING THE MESH. BY VIRTUE OF THE FINITE ELEMENT DISCRETIZATION, THE METHOD HAS NO RESTRICTIONS ON THE GEOMETRY AND COMPOSITION OF THE CAVITY OR ITS TERMINATION. FURTHER ...

    SBIR Phase I 1991 Department of DefenseNavy
  2. EMERGING TECHNOLOGIES RESULTING IN LIGHTER AIRCRAFT WEIGHT INCREASED ENGINE PERFORMANCE (ISP) AND IMPROVED DESIGN TOOLS

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    WE WILL STUDY THE FEASIBILITY OF USING NEURAL NETWORKS (NN) IN FAULT DETECTION AND ISOLATION (FDI) SYSTEMS. WE HOPE TO DEMONSTRATE THE APPLICABILITY OF NEURAL NETWORK TECHNOLOGIES AND ALGORITHMS FOR THE DESIGN OF IMPORTANT SUBSYSTEMS TO BE USED ON BOARD THE HIGH VISABILITY NASP OR X-30. THIS RESEARCH PROJECT WILL CONTRIBUTE TO THE DEVELOPMENT OF THE MOST ADVANCED AVIONICS FOR USE IN THIS 21ST CENT ...

    SBIR Phase II 1991 Department of DefenseAir Force
  3. FAILURE INVESTIGATION OF CERAMIC ARMOR BACKED BY ALUMINUM OR ALUMINUM MATRIX COMPOSITE SUPPORT-PLATES

    SBC: Lanxide Corporation            Topic: N/A

    IT IS PROPOSED THAT THE BALLISTIC PERFORMANCE OF TIB2 CERMAIC ARMOR TILES BACKED UP BY A VARIETY OF LIGHTWEIGHT SUPPORT-PLATES BE INVESTIGATED BY 1MEV FLASH X-RAY EQUIPMENT DURING PENETRATION, AND BY MACROSCOPIC AND MICROSCOPIC OBSERVATIONS OF RECOVERED TARGETS. THE SUPPORT-PLATE TEST MATRIX INCLUDES TWO MATERIALS (A STRUCTURAL ALUMINUM ALLOY AND A CERAMIC REINFORCED ALUMINUM MATRIX COMPOSITE), TW ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  4. HIGH-PERFORMANCE RADIATION-HARD ULTRA-THIN SILICON-UNDER-GLASS SOLAR CELLS

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseMissile Defense Agency
  5. HIGH-PERFORMANCE RADIATION-HARD ULTRA-THIN SILICON-UNDER-GLASS SOLAR CELLS

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseMissile Defense Agency
  6. INVESTIGATION OF STRESS WAVES AND FAILURE PHENOMENOLOGY IN ALUMINUM METAL MATRIX COMPOSITE AND TIB2 LAMINATED ARMOR

    SBC: Lanxide Corporation            Topic: N/A

    TO UNDERSTAND BETTER HOW LAMINATED CERAMIC ARMOR PERFORMS, IT IS PROPOSED TO INVESTIGATE THE EFFECT OF THE IMPEDANCE MISMATCH AND INTERLAYER BOND STRENGTH (BETWEEN AI(2)0(3) REINFORCED ALUMINUM MATRIX COMPOSITES AND TIB(2)) ON STRESS WAVE PROPAGATION AND PENETRATION PHENOMENOLOGY DUE TO LONG ROD IMPACT. LANXIDE'S UNIQUE PROCESSING TECHNOLOGIES WILL BE USED TO FORM A STRONG METALLURGICAL BOND AT TH ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  7. IR/RF Expendable

    SBC: Alloy Surfaces Company, Inc.            Topic: N/A

    esign of the IR/RF payloads.

    SBIR Phase I 1991 Department of DefenseNavy
  8. MEASUREMENT OF PERFORMANCE OF ARMY TACTICAL UNITS

    SBC: Concord Assocs Inc            Topic: N/A

    THE TRADITIONAL MISSION/TASK DECOMPOSITION METHOD OF ANALYSIS HAS LEAD TO A TASK ORIENTED FOCUS INSTEAD OF A MISSION FOCUS. WHILE A TASK ANALYSIS IS NECESSARY TO DEFINE THE TASKS TO BE PERFORMED, A MISSION FOCUSED MOE DEFINES HOW WELL THOSE TASKS MUST BE PERFORMED TO EFFECTIVELY ACCOMPLISH THE MISSION OBJECTIVES. DESIGN OF TRAINING PROGRAMS TYPICALLY RELIES ON TASK ANALYSES TO SELECT TASKS FOR TRA ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. MODEL- BOURNE DATA MANAGEMENT SYSTEM

    SBC: Tesco Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES THE DEVELOPMENT OF A STAND ALONE WIND TUNNEL DATA PROCESSING AND ACQUISITION SYSTEM WHICH WHEN INTEGRATED INTO AN INSTRUMENTED WIND TUNNEL MODEL WILL ALLOW DATA TRANSMISSION AND CONTROL THROUGH A PAIR OF CABLES DESIGNED TO FIT SMALL DIAMETER STINGS AND FORCE BALANCES. THE SYSTEM USES A DESK TOP COMPUTER WHICH CAN BE SET UP PRIOR TO INSTALLATION OF THE MODEL IN THE TUNNEL AN ...

    SBIR Phase II 1991 Department of DefenseAir Force
  10. NEURAL NETWORKS FOR AUTONOMOUS MOTOR CONTROL

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    WE PROPOSE TO DEVELOP A ROBOTIC CONTROL SYSTEM WITH NEURAL NETWORK TECHNOLOGY WHICH CAN ADAPT TO VARIABLE PAYLOAD TRANSPORT CONDITIONS. TRADITIONAL TECHNOLOGIES HAVE DIFFICULTY PROVIDING ADAPTIVE AND AUTONOMOUS MOTOR CONTROL OR THE ABILITY TO GENERALIZE TO UNFORESEEN CONDITIONS. ADAPTIVE CONTROL IS NECESSARY BECAUSE THERE IS VARIATION OF COMPONENT MASSES AND INERTIA, DIRECTION OF GRAVITY AND LITTL ...

    SBIR Phase II 1991 Department of DefenseNavy
US Flag An Official Website of the United States Government