You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ELECTRONIC COMBAT DIGITAL SIMULATION WORKSTATION

    SBC: COMPUTER SCIENCE & APPLICATIONS            Topic: N/A

    THE AIR FORCE CHIEF OF STAFF HAS DIRECTED PROGRAM OFFICES, OPERATING COMMANDS, AND TEST ORGANIZATIONS TO EMPLOY A DISCIPLINED TEST PROCESS THROUGHOUT ALL PHASES OF ELECTRONIC COMBAT (EC) SYSTEMS DEVELOPMENT AND MODIFICATION. THE EC TEST PROCESS CONSISTS OF DISCIPLINED EARLY EVALUATION TO DETERMINE IF THE SYSTEM UNDER DEVELOPMENT WILL MEET USER NEEDS FOLLOWED BY RIGOROUS TESTING AND EVALUATION TO D ...

    SBIR Phase II 1993 Department of DefenseAir Force
  2. REPLACEMENT REFRIGERANT AND SYSTEM EVALUATION

    SBC: APPLIED TECHNOLOGY ASSOC., INC.            Topic: N/A

    THE CURRENT REFRIGERANTS USED IN THE VAPOR CYCLE SYSTEMS ARE SCHEDULED TO BE PHASED OUT AND REPLACED WITH REFRIGERANTS THAT ARE ENVIRONMENTALLY LESS HAZARDOUS. THESE REFRIGERANTS ARE BEING DEVELOPED TO REPLACE THOSE CURRENTLY EMPLOYED IN RESIDENTIAL AND COMMERCIAL APPLICATIONS AND WILL ALSO FIND USE IN MILITARY APPLICATIONS. IN MOST REFRIGERATION SYSTEMS SOME TYPE OF COMPRESSOR OR PUMP IS REQUIRED ...

    SBIR Phase II 1993 Department of DefenseAir Force
  3. CERAMIC BRUSH SEALS

    SBC: Technetics Corp            Topic: N/A

    THE PURPOSE OF THIS PROPOSAL IS TO SECURE FUNDING FOR THE BUILDING AND INITIAL TESTING OF A CERAMIC BRUSH SEAL. THE TECHNICAL OBJECTIVES OF THE PROPOSED WORK ARE TO IDENTIFY APPROPRIATE CERAMIC MATERIALS FOR THE MANUFACTURE OF BRUSH SEALS, DEMONSTRATE THAT A CERAMIC BRUSH SEAL CAN BE BUILT AND TO TEST THE INTEGRITY OF THE CERAMIC SEAL. THE CERAMIC INDUSTRY WILL BE CALLED UPON TO PROVIDE BOTH CERAM ...

    SBIR Phase II 1993 Department of DefenseArmy
  4. LIGHTWEIGHT, LIGHT-TRAPPED, THIN GAAS SOLAR CELL FOR SPACECRAFT APPLICATIONS

    SBC: ASTROPOWER, INC.            Topic: N/A

    ASTROPOWER IS PROPOSING THE DEVELOPMENT OF AN ULTRA-LIGHTWEIGHT, HIGH PERFORMANCE, THIN LIGHT TRAPPING GAAS SOLAR CELL FOR ADVANCED SPACE POWER SYSTEMS. A THIN DEVICE LEADS TO HIGHER PERFORMANCE IN TERMS OF OPEN CIRCUIT VOLTAGE, RADIATION RESISTANCE, AND SPECIFIC POWER. IN A THIN DEVICE, THE INCORPORATION OF LIGHT TRAPPING TO EXTEND THE OPTICAL PATH LENGTH PERMITS GREATER CURRENT GENERATIC THAN CA ...

    SBIR Phase II 1993 Department of DefenseAir Force
  5. CLICHE-BASED SOFTWARE COMPONENT SELECTION

    SBC: MODUS OPERANDI, INC.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED PHASE I EFFORT IS TO DEFINE, DEMONSTRATE, AND VALIDATE THE CONCEPT FOR A CLICHE-BASED SOFTWARE COMPONENT SELECTION SYSTEM THAT CAN AUTOMATICALLY SELECT THE BEST POSSIBLE ASSETS FROM A REUSABLE SOFTWARE LIBRARY TO MEET THE DEVELOPERS NEED. THE APPROACH IS BASED UPON A CONCEPT OF CLICHES THAT ARE ABSTRACT, SKELETAL REPRESENTATIONS OF THE SEMANTICS AND STRUCTURE OF SOFTW ...

    SBIR Phase II 1993 Department of DefenseArmy
  6. A MMW POLARIZATION DIVERSE TRANSCEIVER SYSTEM PROVIDING BASE BAND FOUR PLANE MONOPULSE, DYNAMICALLY ADJUSTABLE NULLS & POLARIZATION

    SBC: UBC INC            Topic: N/A

    UBC, INC., AN ENGINEERING FIRM PERFORMING RESEARCH, DEVELOPMENT, AND LIMITED PRODUCTION OF ADVANCED TECHNOLOGY OVER THE ENTIRE ELECTROMAGNETIC SPECTRUM, SPECIALIZING IN MILLIMETER WAVE AND INFRARED SENSORS, PROPOSES AN SBIR PROGRAM TO PROVIDE DESIGN, SUPPORTING ANALYSIS AND BRASS-BOARD DEVELOPMENT LEADING TO A W-BAND POLARIZATION DIVERSE FOUR PLANE MONOPULSE RADAR WITH DYNAMICALLY ADJUSTABLE POLAR ...

    SBIR Phase II 1993 Department of DefenseAir Force
  7. DMD IR BACKGROUND SCENE GENERATOR

    SBC: Photonic Systems, Inc.            Topic: N/A

    EFFECTIVE GROUND TESTING OF LONG-WAVELENGTH INFRARED (LWIR) PROXIMITY FUSES REQUIRES A SYSTEM CAPABLE OF GENERATING REALISTIC IA SCENES IN THE 8-12 MICRON REGION OF THE ELECTROMAGNETIC SPECTRUM. IN ORDER TO ACCURATELY DEVELOP AND EVALUATE DEVICES UNDER TEST THE SCENE GEN$RATION SYSTEM MUST SIMULATE AS CLOSE AS POSSIBLE THE ACTUAL IR IMAGE SEEN BY THE PROXIMITY FUSE IN THE FIELD. THE NAVAL WEAPONS ...

    SBIR Phase II 1993 Department of DefenseNavy
  8. ISOPERFORMANCE AS A FRAMEWORK FOR HUMAN SYSTEMS INTEGRATION

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    ISOPERFORMANCE METHODOLOGY IS A SET OF FORMAL RELATIONS (TRADE-OFF FUN CTIONS) AMONG THE DETERMINANTS OF PERFORMANCE; IT IS DERIVED BY FIXING A DESIRED LEVEL OF PERFORMANCE AND THEN SOLVING FOR COMBINATIONS OF THE DETERMINANTS SUFFICIENT TO PRODUCE THAT LEVEL. THE ISOPERFORMANCE IDEA IS NOT ORIGINAL WITH THIS PROPOSAL. WHAT IS ORIGINAL HERE IS ITS USE AS A FRAMEWORK TO GUIDE THE ACQUISITION AND DE ...

    SBIR Phase II 1993 Department of DefenseAir Force
  9. DEVELOPMENT OF A FLIGHT SIMULATOR VISUAL SYSTEM RECORDING/EVALUATION DEVICE

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    TECHNOLOGICAL ADVANCES HAVE PLACED GREATER DEMANDS ON ABILITY TO MAINTAIN TOLERANCES ON SIMULATOR SUBSYSTEMS (E.G., RESPONSES OF VISUAL AND MOTION BASE SYSTEMS AND THEIR INTERACTION). A SYSTEM TO RECORD VISUAL SCENES IN FLIGHT SIMULATORS, WHICH INCLUDES MAN-INTHE-LOOP, IS NEEDED FOR RDTE AND ACQUISITION OF THESE TRAINING SYSTEMS. SUCH A SYSTEM WOULD BE EMPLOYED TO DETECT CHANGES IN SYSTEM OUTPUT ( ...

    SBIR Phase II 1993 Department of DefenseNavy
  10. DEVELOPMENT OF A NON-INTRUSIVE COGNITIVE WORKLOAD MEASUREMENT DEVICE

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    THE ACCELERATING TEMPO OF MILITARY OPERATIONS INCREASES THE TASK DEMANDS AND WORK RELATED STRESSES IMPOSED ON HUMAN OPERATORS. AS NEW TECHNOLOGICAL DESIGNS ARE INCORPORATED INTO MILITARY SYSTEMS, A METRIC IS REQUIRED TO ENSURE THAT HUMAN COGNITIVE WORKLOAD LIMITS ARE NOT EXCEEDED. SOME PROGRESS IN THIS ENDEAVOR HAS BEEN ACHIEVED IN USING AS OBJECTIVE WORKLOAD INDICATORS A VARIETY OF ELECTROPHYSIOL ...

    SBIR Phase II 1993 Department of DefenseNavy
US Flag An Official Website of the United States Government