You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ACTIVITIES
SBC: General Systems Group Topic: N/AGSG HAS OBSERVED LIMITED SUPPORT OF MODERN PROGRAMMING PRACTICE BY DOD SOFTWARE CONTRACTORS DUE TO THE RISKS INVOLVED AND THE ABSENCE OF PAY-OFF DATA. CONTRACTORS ALSO HAVE A DIFFICULT TIME ACCRATELY ESTIMATING AND SCHEDULING QUALITY RELATED ACTIVITIES ON SOFTWARE OF QUALITY RELATED ACTIVITIES IN ORDER TO PROVIDE THE MODELS WHICH CAN BE USED TO (A) DETERMINE THE VALUE OF SUCH ACTIVITIES TO CONTRAC ...
SBIR Phase I 1983 Department of DefenseArmy -
Advanced Avionics Support for Ground Based Munitions Testing
SBC: Wintec, Inc. Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseAir Force -
Advanced Gas Injector for MOCVD Reactor
SBC: CREARE LLC Topic: N/AMetalorganic chemical vapor deposition (MOCVD) of III-V semiconductor thin films will be improved through the development and application of unique gas injection hardware. The innovative hardware utilizes the vertical showerhead-type reactor configuration. It will enable for the first time detailed and active control over the transport of reactants to the surface of the substrate wafer, including ...
SBIR Phase I 1993 Department of DefenseAir Force -
Advanced Weapons Material: Exterior Surface
SBC: Applied Polymer Systems, Inc. Topic: N/AApplied Polymer Systems, Inc (APS) has developed a new plasma spray process capable of applying a polymetric resin binder with high filler levels in coating form over various substrates. The process can be robotically controlled and is environmentally friendly. A vacuum collection system captures vapors, and no solvents are used in the process. The filters can be functional and contribute to surfa ...
SBIR Phase I 1993 Department of DefenseNavy -
A Low Cost Compressor for Spacecraft Cryocoolers
SBC: CREARE LLC Topic: N/AThe objective of the proposed project is to reduce by more than an order of magnitude the cost of reliable and contemination-free hermetically sealed compressors for long life Stirling and Pulse Tube Cryocoolers for spacecraft. State-of-the art compressors use unlubricated flexure bearings and non-contact seals to eliminate contamination and wear, approaches requiring expensive high precision manu ...
SBIR Phase I 1993 Department of DefenseAir Force -
A MMW POLARIZATION DIVERSE TRANSCEIVER SYSTEM PROVIDING BASE BAND FOUR PLANE MONOPULSE, DYNAMICALLY ADJUSTABLE NULLS & POLARIZATION
SBC: UBC INC Topic: N/AUBC, INC., AN ENGINEERING FIRM PERFORMING RESEARCH, DEVELOPMENT, AND LIMITED PRODUCTION OF ADVANCED TECHNOLOGY OVER THE ENTIRE ELECTROMAGNETIC SPECTRUM, SPECIALIZING IN MILLIMETER WAVE AND INFRARED SENSORS, PROPOSES AN SBIR PROGRAM TO PROVIDE DESIGN, SUPPORTING ANALYSIS AND BRASS-BOARD DEVELOPMENT LEADING TO A W-BAND POLARIZATION DIVERSE FOUR PLANE MONOPULSE RADAR WITH DYNAMICALLY ADJUSTABLE POLAR ...
SBIR Phase II 1993 Department of DefenseAir Force -
A Multi-Processor Embedded Data Processor for Multi-Object Detection & Tracking
SBC: Aeronix, Inc. Topic: N/AThe Aeronix Phase I task will demonstrate the application of an innovative parallel processing computer architecture and parallel processing programing envirorment to a class of problems associated with the real time detection, recognition, acquisition and tracking of multLple objects in a high rate image sensor environment. The Phase I task will examine the problems associated with the multiplici ...
SBIR Phase I 1993 Department of DefenseArmy -
AN EXPENDABLE DEVICE FOR MEASURING SUPERCOOLED LIQUID WATER IN CLOUDS
SBC: Atek Data Corp Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
An Innovative Approach to Man-Atr Interaction
SBC: CREATIVE OPTICS, INC. Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseAir Force -
A SOFTWARE MODELING ENVIRONMENT FOR VIRTUAL PROTOTYPING OF SEMICONDUCTOR FABRICATION EQUIPMENT
SBC: CREARE LLC Topic: N/AAPPLICATION OF SIMULATION AND MODELLING TO THE DESIGN OF SEMICONDUCTOR FABRICATION EQUIPMENT WILL REDUCE DEVELOPMENT TIME AND COSTS AND PROMOTE INNOVATION IN SEMICONDUCTOR MANUFACTURING. THIS PROJECT PROPOSES TO DEMONSTRATE THE FEASIBILITY OF AN INNOVATIVE SOFTWARE ENVIRONMENT FOR VIRTUAL PROTOTYPING OF THIS EQUIPMENT. USING THIS SOFTWARE, DESIGNERS CAN PERFORM CRITICAL MODELLING AND DESIGN TRADES ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency