List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. "AN INNOVATIVE DESIGN TOOL FOR RAPID BATTLE SCENARIO ASSESSMANT" (P-9156)

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseAir Force
  2. "VIRTUAL" AIR INTERCEPT CONTROL (AIC) ARCHITECTURES FOR TRAINING AIR INTERCEPT CONTROL PROCEDURES

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  3. 2 Micron Laser System for Next Generation Tactical Engagement Simulation (TES) System

    SBC: Schwartz Electro-Optics, Inc            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  4. A Decision Support Tool for Development Planning

    SBC: Decision Science Associates            Topic: N/A

    Decision Science Associates, Inc. (DSA) proposed to develop and demonstrate an automated decision support tool for long-range acquisition planning. This tool will support the assessment and prioritization of system concept alternatives and supporting technologies based on military operational requirements. Phase I consists of 3 tasks. In Task 1 we will identify the important aspects of the long-ra ...

    SBIR Phase I 1993 Department of DefenseAir Force
  5. A MMW POLARIZATION DIVERSE TRANSCEIVER SYSTEM PROVIDING BASE BAND FOUR PLANE MONOPULSE, DYNAMICALLY ADJUSTABLE NULLS & POLARIZATION

    SBC: UBC INC            Topic: N/A

    UBC, INC., AN ENGINEERING FIRM PERFORMING RESEARCH, DEVELOPMENT, AND LIMITED PRODUCTION OF ADVANCED TECHNOLOGY OVER THE ENTIRE ELECTROMAGNETIC SPECTRUM, SPECIALIZING IN MILLIMETER WAVE AND INFRARED SENSORS, PROPOSES AN SBIR PROGRAM TO PROVIDE DESIGN, SUPPORTING ANALYSIS AND BRASS-BOARD DEVELOPMENT LEADING TO A W-BAND POLARIZATION DIVERSE FOUR PLANE MONOPULSE RADAR WITH DYNAMICALLY ADJUSTABLE POLAR ...

    SBIR Phase II 1993 Department of DefenseAir Force
  6. A Multi-Processor Embedded Data Processor for Multi-Object Detection & Tracking

    SBC: Aeronix, Inc.            Topic: N/A

    The Aeronix Phase I task will demonstrate the application of an innovative parallel processing computer architecture and parallel processing programing envirorment to a class of problems associated with the real time detection, recognition, acquisition and tracking of multLple objects in a high rate image sensor environment. The Phase I task will examine the problems associated with the multiplici ...

    SBIR Phase I 1993 Department of DefenseArmy
  7. A NOVEL DIGITAL CONTROLLER FOR MAGNETIC BEARING SYSTEMS IN NEXT GENERATION TURBINE ENGINES

    SBC: Protos Technology, Inc.            Topic: N/A

    Protos Technology proposes to develop a novel digital controller for a flight-weight magnetic bearing system for future integration with a man-rated turbojet engine. The digital controller includes an innovative technique for sensing shaft position that permits a reduction in size and complexity, improved performance, and higher reliability. Other advanced features of the controller include redund ...

    SBIR Phase I 1993 Department of DefenseAir Force
  8. A Novel True Airspeed Indicator for Helicopters

    SBC: ANALYTICAL SERVICES & MATERIALS, INC.            Topic: N/A

    A completely new approach is proposed for the accurate measurement and display of the true airspeed of helicopters in hover, low-speed and forward flight. Unlike conventional instruments, the proposed innovation will be characterized by high-frequency response and high sensitivity across the range of helicopter flight speeds. The proposed device will provide accurate speed indication both at low a ...

    SBIR Phase I 1993 Department of DefenseNavy
  9. A NOVEL VERY-LOW-COST AIRBREATHING PROPULSION SYSTEM

    SBC: Adroit Systems, Inc.            Topic: N/A

    CURRENTLY, AIRBREATHING PROPULSION SYSTEMS WHICH OPERATE IN THE HIGH SUBSONIC REGIME ARE EXPENSIVE, COMPLEX, HEAVY AND USE PERISHABLE FUELS. TO OVERCOME THESE LIMITATIONS, A NOVEL PROPULSION CONCEPT BASED ON A PULSE DETONATION ENGINE (PDE) OR A CONVENTIONAL RAMJET COMBUSTOR (CRC) COUPLED WITH A BORON SOLID FUELED HYBRID GAS GENERATOR (HGG) IS PROPOSED. THE INNOVATION DRAWS FROM RECENT SUCCESSES IN ...

    SBIR Phase II 1993 Department of DefenseAir Force
  10. A Quantitative Method for Trading Off Dependability with Other System Attributes

    SBC: Decision Science Associates            Topic: N/A

    This research is aimed at producing a dependable system design prototype. It will serve as a testbed for research on the integration of dependability automation suport into the systems design process by assisting designers in quantifying tradeoffs between dependability and other system attributes. Phase I consists of three tasks. In Task 1, we will identify the important factors in systems design ...

    SBIR Phase I 1993 Department of DefenseNavy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government