You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of Metal-to-SiCf/Al2O3 Composite Brazing Methods for Turbine Engine Components

    SBC: Lanxide Corporation            Topic: N/A

    Lanxide Corporation proposes to demonstrate the feasibility of utilizing the active brazing method to join a Nicalon TM fiber reinforced alumina matrix composite to structural alloys for applications i advanced turbine engines. The high temperature capability of the ceramic matrix composite allows uncooled operation of several turbine engine components resulting in significant gains in specific fu ...

    SBIR Phase II 1995 Department of DefenseArmy
  2. Embedded UV Combustion Sensor

    SBC: ASTROPOWER, INC.            Topic: N/A

    AstroPower proposes to develop gallium phosphide (GaP) ultraviolet (UV) sensors for engine combustion control. The UV spectra from the free radial combustion components correlates with combustion effectivity in terms of predetonation, and provides a real time basis for central control of excess air ratio, internal combustion temperatures, and other fuel injector parameters. A system for the engine ...

    SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency
  3. GaInAsSb Infrared Laser Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  4. GaP ZnS for Blue Light Emitting Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    AstroPower is developing a two-junction monolithic tandem solar cell composed of (AlxGa1-x)0.51In.49P lattice matched to GaAs for use as the top cell in a three-junction, two-terminal tandem stack. This tunable bandgap material system is capable of current matching, at 2.03eV, in a two-junction monolithic tandem solar cell two terminal design of (AlxGa1-x)0.51In0.49P/GaAs yielding a best case pred ...

    SBIR Phase II 1993 Department of DefenseMissile Defense Agency
  5. High Efficiency Floating Junction Gallium Arsenide Solar Cell

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  6. High-Performance, Resonant Optical Cavity Light-Emitting Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    The Phase I Project will develop a comprehensive model to evaluate and optimize state-of-the-art light-emitting diodes for optical memories, optical computing, and fiber or free-space photonic interconnects. The innovation is the development of resonant optical cavity LEDs and a proprietary low-cost epitaxy technology for their fabrication. A unified approach to the design of LEDs with resonant op ...

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  7. High Specific Power, Electrostatically Bonded, Ultra-thin Gaas

    SBC: ASTROPOWER, INC.            Topic: N/A

    ASTROPOWER PROPOSES TO DEVELOP A LIGHTWEIGHT, HIGH PERFORMANCE, ULTRA-THIN ELECTROSTATICALLY BONDED GaAs SOLAR CELL WITH COPLANAR BACK CONTACTS. THE INNOVATIVE DESIGN INCORPORATES LIGHT TRAPPING, ADHESIVELESS COVER SLIDE BONDING, AND ELIMINATES GRID SHADING. THIS NOVEL DEVICE WILL EXHIBIT INCREASED EFFICIENCY AND SPECIFIC POWER DUE TO THE HIGHER OPEN CIRCUIT VOLTAGE AND SHORT CIRCUIT CURRENT OBTAI ...

    SBIR Phase I 1993 Department of DefenseMissile Defense Agency
  8. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    CSA PROPOSES TO DESIGN AND IMPLEMENT A STEADY-STATE SOLUTION FOR THE COMPLETE SYSTEM OF EQUATIONS SOLVED IN EITHER THE TRAC/PF1, TRAC/BD1, OF RELAP5 CODES. THE STEADY-STATE SOLUTION WILL UTILIZE THE STEADY-STATE FORM OF THE MODEL EQUATIONS AND WILL UTILIZE EXISTING EQUATION SOLVERS TO THE EXTENT POSSIBLE. ALL TIME-DEPENDENT CONSTITUTIVE AND COMPONENT MODELS WILL BE INCLUDED IN THE SOLUTION TO ENSU ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  9. LIGHTWEIGHT, LIGHT-TRAPPED, THIN GAAS SOLAR CELL FOR SPACECRAFT APPLICATIONS

    SBC: ASTROPOWER, INC.            Topic: N/A

    ASTROPOWER IS PROPOSING THE DEVELOPMENT OF AN ULTRA-LIGHTWEIGHT, HIGH PERFORMANCE, THIN LIGHT TRAPPING GAAS SOLAR CELL FOR ADVANCED SPACE POWER SYSTEMS. A THIN DEVICE LEADS TO HIGHER PERFORMANCE IN TERMS OF OPEN CIRCUIT VOLTAGE, RADIATION RESISTANCE, AND SPECIFIC POWER. IN A THIN DEVICE, THE INCORPORATION OF LIGHT TRAPPING TO EXTEND THE OPTICAL PATH LENGTH PERMITS GREATER CURRENT GENERATIC THAN CA ...

    SBIR Phase II 1993 Department of DefenseAir Force
  10. Metallic Ion Removal via Neutral Presipitation and Cross Flow MicroFiltration

    SBC: Environmental R & D, Inc.            Topic: N/A

    The objective of this proposal is to determine the chemical operating parameters and control parameters required to design a Neutral Precipitation/Cross Flow MicroFiltration wastewater treatment unit for removal of heavy metals from wastewater generated in the metal finishing operations generated at Department of Defense arsenals and depots. The proposed wastewater treatment process would permit t ...

    SBIR Phase II 1995 Department of DefenseArmy
US Flag An Official Website of the United States Government