You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A CAD Tool for Rapid analysis of Repairs

    SBC: ADVANCED STRUCTURAL TECHNOLOGY, INC.            Topic: N06005

    The objective of this project is to develop and validate a CAD tool for the rapid design of mechanically fastened repairs, bonded repairs, and hybrid repairs involving both adhesive bonding and mechanical fasteners. To allow use by non-specialists, the CAD tool will replace the current process of manual construction of joint finite element models with CAD tinker toy assembly using parametric par ...

    SBIR Phase I 2006 Department of DefenseNavy
  2. A Cavity Enhanced Terahertz Absorption Spectrometer (CETAS)

    SBC: ALPHASENSE, INC.            Topic: A08075

    In this proposal, AlphaSense, Inc. (AI) and the Oklahoma State University (OKState) detail the development of a novel Cavity Enhanced Terahertz Absorption Spectrometer (CETAS). Key innovations of the proposed system include: a) the use of a small Whispering- Gallery- Mode (WGM) cavity to achieve very long pathlength; and b) the integration of the WGM cavity with the conventional pulsed and continu ...

    SBIR Phase I 2008 Department of DefenseArmy
  3. A compact, low cost, in- process welding defects detection system based on thermal plasma emission

    SBC: ALPHASENSE, INC.            Topic: N08178

    In this proposal, AlphaSense, Inc. (AI) and the University of Michigan (UM) detail the development of a compact, portable, and low cost in-process weld defects detection system. Key innovations of the proposed system include: a) weld defects monitoring based on plasma emission characteristics; b) use the electron temperature of the plasma as an indicator of the weld quality, c) use multiple plasma ...

    SBIR Phase I 2008 Department of DefenseNavy
  4. Adjustable Attachment Device for Aircraft Blankets

    SBC: HILLIER DEVELOPMENT            Topic: N06016

    A simple clamping U bracket to secure itself under pressure on both sides of the aircraft's structural frame ribs. A clamp will be placed on every section where the bonded studs currently exist. A cavity on the bottom of each clamp will hold a stud or other tool to secure the blankets. The outer surface of the bracket will be made of rubber and the inner core will be made of 9255 spring steel, ...

    SBIR Phase I 2006 Department of DefenseNavy
  5. A 3D Printed Head Phantom for Transcranial Direct Current Stimulation Current Model Validation

    SBC: ALPHASENSE, INC.            Topic: AF151026

    ABSTRACT:Cognitive skills/capabilities are important for the military personnel to fulfill tasks and to ensure mission efficiency and success. In the past decade, there are abundant researches suggesting that non-invasive brain stimulation via transcranial direct current stimulation (tDCS) holds great promise to enhance a soldier's cognitive performances. Although models to predict the tDCS curren ...

    SBIR Phase I 2015 Department of DefenseAir Force
  6. Advanced Intelligent Web-Based Options to Acquire and Analyze Aircraft Health and Test Data

    SBC: SENTIENT SCIENCE CORPORATION            Topic: N08122

    Topic Synopsis: Current aircraft disposition tools are not designed to take advantage of predictive prognostic information that will be available on new systems such as the F-35 PHM system or the proposed Maintenance and Monitoring system for the E-2D Hawkeye. The central challenges in this topic are to (1) develop automated reasoner technologies to distill large volumes of PHM data into actionabl ...

    SBIR Phase I 2008 Department of DefenseNavy
  7. Advanced Manufacturing Technologies

    SBC: Stutz Applied Technology, Inc.            Topic: DLA152001

    A method of utilizing 3D printed molds to produce low cost metal parts for obsolescence, engineering development prototypes, and low rate production is proposed for development and evaluation.This method is capable of producing parts of similar quality to mass production techniques such as green sand and lost wax casting at a fraction of the setup costs for those methods.

    SBIR Phase I 2015 Department of DefenseDefense Logistics Agency
  8. Advanced Manufacturing Technologies

    SBC: SENTIENT SCIENCE CORPORATION            Topic: DLA152001

    In response to Defense Logistics Agencys SBIR for Advanced Manufacturing Technologies, Sentient proposes to develop a life-cycle cost optimization tool based on its DigitalClone-ComponentTM (DCC) modeling technology.This tool will enable users to better understand the tradeoffs between manufacturing cost and performance/durability of the resultant components. This is particularly attractive for lo ...

    SBIR Phase I 2015 Department of DefenseDefense Logistics Agency
  9. AIMS: Agent-based Information Management System

    SBC: QUANTUM LEAP INNOVATIONS, INC.            Topic: AF05105

    Information Management is an important component in the development of viable information sharing systems, such as JBI, where shared information may be manipulated to derive further information. The qualities of such derived information depend on qualities of the contributing information and of their sources. Determining information quality requires propagation of qualitative and pedigree data abo ...

    SBIR Phase II 2006 Department of DefenseAir Force
  10. Aircraft Electrical Power System Diagnostics and Health Management

    SBC: SENTIENT SCIENCE CORPORATION            Topic: N06T007

    The military is actively implementing diagnostics, prognostics, and health management technologies across platforms in an effort to reduce maintenance costs, increase readiness and availability, and improve safety. In aircraft electric power systems, the largest maintenance driver is the generator, followed by the batteries. Common faults include winding shorts, pitting and spalling in bearings, a ...

    STTR Phase I 2006 Department of DefenseNavy
US Flag An Official Website of the United States Government