You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Cavity Enhanced Terahertz Absorption Spectrometer (CETAS)

    SBC: ALPHASENSE, INC.            Topic: A08075

    In this proposal, AlphaSense, Inc. (AI) and the Oklahoma State University (OKState) detail the development of a novel Cavity Enhanced Terahertz Absorption Spectrometer (CETAS). Key innovations of the proposed system include: a) the use of a small Whispering- Gallery- Mode (WGM) cavity to achieve very long pathlength; and b) the integration of the WGM cavity with the conventional pulsed and continu ...

    SBIR Phase I 2008 Department of DefenseArmy
  2. A compact, low cost, in- process welding defects detection system based on thermal plasma emission

    SBC: ALPHASENSE, INC.            Topic: N08178

    In this proposal, AlphaSense, Inc. (AI) and the University of Michigan (UM) detail the development of a compact, portable, and low cost in-process weld defects detection system. Key innovations of the proposed system include: a) weld defects monitoring based on plasma emission characteristics; b) use the electron temperature of the plasma as an indicator of the weld quality, c) use multiple plasma ...

    SBIR Phase I 2008 Department of DefenseNavy
  3. Adaptive Distributed Aperture Radar Mainlobe Jammer Suppression

    SBC: Applied Radar, Inc.            Topic: MDA07037

    The mitigation of mainlobe jamming is essential to missile defense radar performance. Applied Radar is currently investigating distributed aperture and adaptive processing architectures that promise a new generation of advanced radar performance. Our proposed program will research the application of these distributed aperture radar techniques to determine the mainlobe jammer suppression possible w ...

    SBIR Phase I 2008 Department of DefenseMissile Defense Agency
  4. Adjustable Attachment Device for Aircraft Blankets

    SBC: HILLIER DEVELOPMENT            Topic: N06016

    A simple clamping U bracket to secure itself under pressure on both sides of the aircraft's structural frame ribs. A clamp will be placed on every section where the bonded studs currently exist. A cavity on the bottom of each clamp will hold a stud or other tool to secure the blankets. The outer surface of the bracket will be made of rubber and the inner core will be made of 9255 spring steel, ...

    SBIR Phase I 2006 Department of DefenseNavy
  5. Advanced Intelligent Web-Based Options to Acquire and Analyze Aircraft Health and Test Data

    SBC: SENTIENT SCIENCE CORPORATION            Topic: N08122

    Topic Synopsis: Current aircraft disposition tools are not designed to take advantage of predictive prognostic information that will be available on new systems such as the F-35 PHM system or the proposed Maintenance and Monitoring system for the E-2D Hawkeye. The central challenges in this topic are to (1) develop automated reasoner technologies to distill large volumes of PHM data into actionabl ...

    SBIR Phase I 2008 Department of DefenseNavy
  6. Advanced Phased-Array Module Interconnect Technology

    SBC: Applied Radar, Inc.            Topic: MDA07036

    The design and development of phased-array radars requires the integration of solid-state components and adequate thermal mitigation within the array lattice constraints. The current trend is towards increasingly planar designs and a reduction in the array depth. The MDA SPEAR program is one example in which a planar T/R “tile” architecture is utilized. System-on-a-chip technologies such as Si ...

    SBIR Phase I 2008 Department of DefenseMissile Defense Agency
  7. AGILE Sonobuoy Launcher

    SBC: SEACORP, LLC            Topic: N/A

    Current helicopter sonobuoy launchers are complex, heavy and will not meet future requirements for mission versatility. Because of the complexity of the launcher and its pneumatic subsystem, the launcher has many points of potential failure; itsreliability is poor. Further, as in other pneumatic systems involving stored compressed air, the system is subject to vagaries of pressure which can result ...

    SBIR Phase I 2003 Department of DefenseNavy
  8. AIMS: Agent-based Information Management System

    SBC: QUANTUM LEAP INNOVATIONS, INC.            Topic: AF05105

    Information Management is an important component in the development of viable information sharing systems, such as JBI, where shared information may be manipulated to derive further information. The qualities of such derived information depend on qualities of the contributing information and of their sources. Determining information quality requires propagation of qualitative and pedigree data abo ...

    SBIR Phase II 2006 Department of DefenseAir Force
  9. Aircraft Electrical Power System Diagnostics and Health Management

    SBC: SENTIENT SCIENCE CORPORATION            Topic: N06T007

    The military is actively implementing diagnostics, prognostics, and health management technologies across platforms in an effort to reduce maintenance costs, increase readiness and availability, and improve safety. In aircraft electric power systems, the largest maintenance driver is the generator, followed by the batteries. Common faults include winding shorts, pitting and spalling in bearings, a ...

    STTR Phase I 2006 Department of DefenseNavy
  10. Anti-Terrorism- Consequence Management and Recovery

    SBC: CCL Biomedical Inc.            Topic: N/A

    The threat of terrorist or military attack using biological, chemical or radiological weapons is one of the largest concerns to U.S. military forces. Development of defense initiatives that can be implemented to neutralize agents and decontaminatepersonnel, equipment and buildings are required to counter the potentially catastrophic effects of such an attack. A family of biocides has been identifi ...

    SBIR Phase I 2003 Department of DefenseNavy
US Flag An Official Website of the United States Government