You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Zone-Plate-Array Lithography for Mask Making and Military Integrated-Circuit (IC) Manufacturing

    SBC: LUMARRAY, INC.            Topic: N07035

    LumArray, Inc. proposes under Phase II to further improve its maskless zone-plate-array lithography system, to meet the requirements of manufacturers of custom chips for the DoD. Under Phase I, a prototype alpha tool was developed, the ZP-150ATM. Under Phase II we will develop and demonstrate a beta tool, the ZP-150BTM, which will have features beyond those available on the alpha tool. Specific ...

    SBIR Phase II 2008 Department of DefenseNavy
  2. Zero-HERO Inductive Link

    SBC: TRITON SYSTEMS, INC.            Topic: N171006

    Triton Systems will develop an inductive link for use in Navy aircrafts to send configuration data to individual rockets within a launcher before launch. The proposed solution will remove the need for umbilicals on the current system and provide a wireless connectivity capability. During Phase I, Triton proposes to build a test model to demonstrate our systems capability to send wireless data to i ...

    SBIR Phase I 2017 Department of DefenseNavy
  3. Yield Enhancing AR Treatment Process For Large Format Space FPAs

    SBC: TELAZTEC            Topic: MDA09022

    Imaging sensors, or focal plane arrays (FPAs), designed to detect the light signature of ballistic missiles, are a critical component of the Missile Defense Agency’s (MDA) space sensor program known as the Space Tracking and Surveillance System (STSS). The need to detect a missile at the greatest distance from its intended target, drives the advancement of sensor technology toward the increased ...

    SBIR Phase I 2010 Department of DefenseMissile Defense Agency
  4. Wireless self-powered covert area monitor (WisperCAM) for radiation detection

    SBC: RAYWATCH INC            Topic: AF151009

    This project seeks to design and manufacture a prototype WisperCAM detector and to tests its ability to covertly monitor for and detect isotopic radiation. The tasks to accomplish the WisperCAM will build on Phase I. The computer models from Phase I wil

    SBIR Phase II 2017 Department of DefenseAir Force
  5. Wireless Non-Invasive Advanced Control of Microprocessor Prostheses and Orthoses

    SBC: LIBERATING TECHNOLOGIES INC            Topic: DHA17A005

    There are several current and imminent orthotic and prosthetic (OandP) fitting scenarios that would greatly benefit from the ability to wirelessly collect and transmit physiological information from the user. Both upper- and lower- limb OandP fittings that: 1) use osseointegration, 2) have cable management issues, and 3) could benefit from physiological information from locations proximal to the ...

    STTR Phase I 2017 Department of DefenseDefense Health Agency
  6. Wireless Fire Detector

    SBC: BLAZETECH CORPORATION            Topic: AF073130

    The objective of the proposed work is the development of a micro-sized and intelligent, wireless fire detection system that can operate in the harsh environment of military aircrafts. The system will use optical sensors configured to discriminate between fires and false alarms particularly the flash from projectile impacts. The wireless aspect of the system will enable the sensors to be easily i ...

    SBIR Phase I 2008 Department of DefenseAir Force
  7. Wireless Brake and Tire Monitoring System (WBTMS)

    SBC: Templeman Automation, LLC            Topic: AF073144

    Templeman Automation, LLC (TALLC) proposes an innovative implementation of wireless brake and tire monitoring with its TaB-TaP (Tire and Brake Temperature and Pressure) long-range wireless telemetry system. TaB-TaP represents a significant opportunity to augment the safety and efficiency of flight and ground testing of manned and unmanned aircraft. By extending proven, commercial SmartStem techn ...

    SBIR Phase I 2008 Department of DefenseAir Force
  8. Wide Bandwidth Photonics Based Beamformer

    SBC: AGILTRON, INC.            Topic: AF081031

    An innovative concept for a scalable beamformer that can be applied to the full range of Air Force radars is proposed. The concept is photonics based and currently supports transmit/receive applications over the 0.1 to 20 GHz band. The design provides a digitally controlled True Time Delay beamformer effectively adapted to a phased array in any portion of the spectral coverage. Fine pointing resol ...

    SBIR Phase I 2008 Department of DefenseAir Force
  9. Wideband Photonic Sensor System

    SBC: MAGIQ TECHNOLOGIES, INC.            Topic: SB091002

    In our Phase I SBIR MagiQ Technologies developed and modeled optical signal processing techniques to enable simultaneous transmit and receive (STAR) from a single wideband aperture. Our method exploits the broadband linearity of optical components. In Phase II of this program we propose to further develop and prototype this system to show wideband high isolation from the transmitter to the receiv ...

    SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
  10. Wide Bandgap Amplifier Linearization

    SBC: Auriga Measurement Systems LLC            Topic: N08039

    This program addresses the challenges associated with power amplifiers used under multi-tone drive where high operating efficiency is required without adding false signals or errors (intermodulation distortion, IMD) to the output signal. The goal is to reduce all IMD levels below -30dBc without sacrificing the efficiency of the amplifier, under a signal drive condition of up to eight simultaneous ...

    SBIR Phase I 2008 Department of DefenseNavy
US Flag An Official Website of the United States Government