You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: 941DIn the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...
SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Novel schemes for highly reliable aerospace electromechanical primary actuation systems
SBC: LCDRIVES CORP. Topic: SB132005There is a need to achieve 10^-9 reliability for actuators for critical aerospace applications and this precludes single point failure for all but the simplest and most reliable electrical and mechanical components. LC Drives proposes a method of constructing a high reliability linear actuator for critical aerospace applications that is designed such that jams caused by conventional electrical a ...
SBIR Phase I 2013 Department of DefenseDefense Advanced Research Projects Agency -
Mobile Offshore Platform for Wind Turbine Power Generation
SBC: Applied Physical Sciences Corp. Topic: SB082056There is a Department of Defense need for a persistent, mobile power generating capability to service offshore bases and other temporary or mobile installations. In order to facilitate both persistence and mobility, the present concept is of a free floating wind turbine platform, convertible from generating mode to transit mode. Challenges to design of this concept include stability, seakeeping, c ...
SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency -
High Power Density TAG Motors for Hybrid Electric Air Platforms
SBC: D-Star Engineering Corporation Topic: SB082011The project aims to develop a strategy for a dramatically lighter and more efficient electric motor, with initial emphasis on a 7 hp class, 12” diameter fan for VTOL UAVs. For this, D-STAR is proposing a new motor architecture that combines and enhances the best features of contemporary motor architectures. For the Phase 1, the project tasks include : preliminary design and layout of the TAG Mot ...
SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency -
GPU-Based CFD Analysis for Modeling Complex UAV Flight Scenarios
SBC: EM PHOTONICS INC Topic: SB082024Recent advances in computing have produced special-purpose hardware comprised of vector processors streamlined for high-performance computations. Development of these devices, such as graphics processing units (GPUs) and the Cell Broadband Engine (Cell Processor), has been advanced by the videogame industry. In an effort to increase flexibility and enter new markets, vendors have increased platf ...
SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency -
Graph-Matching Accelerator (GMA)
SBC: EXOGI LLC Topic: SB082024We propose to explore the applicability of COTS general-purpose graphics processing units (GPGPU) to approximate graph matching problems, in order to dramatically improve the speed and utility of DoD-relevant processing areas such as machine vision, target recognition and social network analysis.
SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency -
Explosion-Proof Solid State Lighting Fixture for Extreme Environments
SBC: L. C. DOANE Topic: SB082054the l. c. doane company will leverage it's 10 years of design and manufacturing experience with LEDs to provide a design which will meet or exceed the requirements of the legacy mil-spec light fixture.
SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency -
Energy Rejection Systems for Very High Altitude Aircraft
SBC: THOUGHTVENTIONS UNLIMITED LLC Topic: SB082063High altitude aircraft are now being used for atmospheric sampling and other purposes, but significant advances in performance must be achieved for sustained flight at altitudes up to 30 km. It is proposed to replace the standard metal finned circulating glycol/water heat exchanger with a droplet heat exchanger developed in this program. A circulating liquid sprayed into a ducted airstream creat ...
SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AN/A
SBIR Phase I 1984 Department of Transportation -
FLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS.
SBC: Springborn Materials Science Topic: N/AFLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS. HOWEVER, SMOKE AND TOXIC GAS EVOLUTION IN THE EVENT OF FIRE IS A MAJOR PROBLEM. THE GOAL OF THIS PROGRAM IS TO CREATE A FIRE RESISTANT COMPOSITE FOAM STRUCTURE WHICH WILL GENERATE NEGLIGIBLE QUANTITIES OF TOXIC FUMES WHEN EXPOSED TO FI ...
SBIR Phase I 1984 Department of Transportation