You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Developing a Standard Integrated Framework for Transit Assest Management Information

    SBC: Encada LLC            Topic: 131FT2

    Transit Agency Information required for managing Service centers on resources and assets that need to be available to operate the transit service as designed. An opportunity exists to design an Integrated Framework providing Service delivery and Maintenance Management Information to quantify the reliability and availability of the assets. This framework will incorporate modeling of the asset inven ...

    SBIR Phase I 2013 Department of Transportation
  2. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations. This project will deliver an individualized Fatigue Management Program (FMP) technology for trucking operations that in ...

    SBIR Phase I 2009 Department of Transportation
  4. INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEM SIMULATION- IEMS(3)

    SBC: Data Communications Corp.            Topic: N/A

    THE PURPOSE OF THIS RESEARCH PROJECT IS TO DETERMINE THE FEASIBILITY OF MERGING AN EMERGENCY MEDICAL SERVICES (EMS) SIMULATOR WITH GEOGRAPHICAL INFORMATION SYSTEMS (GIS) IN ORDER TO PRODUCE IEMS(3) (INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEMS SIMULATOR), A PC-BASED SYSTEM WHICH CAN BE USED FOR BOTH ADDRESSING STRATEGIC PLANNING ISSUES OF EMS SYSTEMS (E.G., SYSTEM CONFIGURATION; VEHICLE LOCATION ...

    SBIR Phase I 1994 Department of Transportation
  5. X-RAY DAMAGE THRESHOLD FOR FILM AND MAGNETIC RECORDING MEDIA

    SBC: United Dynamics, Inc.            Topic: N/A

    THE FEDERAL AVIATION ADMINISTRATION NEEDS STATISTICAL DATA ON THE X-RAY DAMAGE THRESHOLD OF PHOTOGRAPHIC FILM AND MAGNETIC MEDIA TO PREDICT POSSIBLE DAMAGING EFFECT OF HIGHER POWERED X-RAY FACILITIES BEING CONSIDERED AS PART OF INCREASED AIRPORT SECURITY. TECHNOLOGY DEVELOPMENT ASSOCIATES, INC. (TDA) PROPOSES AN EXPERIMENTAL PROGRAM TO STATISTICALLY EVALUATE DAMAGE THRESHOLDS. X-RAY TRANSPORT ANAL ...

    SBIR Phase I 1994 Department of Transportation
  6. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government