You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Improved Decision Support Tools for State of Good Repair

    SBC: TWILIGHT TRAINING, L.L.C.            Topic: 131FT2

    Every asset ages. Pipes, roads, computers, cars, etc. This fact is inevitable. And, as a result of the aging process, every asset suffers a degradation in its intended capability or performance over time. Yet every day, millions of people in the U.S. get up in the morning expecting that they will be able to travel to work, drink clean water, use the Internet, and so on. It usually takes a catastro ...

    SBIR Phase I 2013 Department of Transportation
  2. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Microwave measurement of rail distance traveled

    SBC: Systems & Materials Research Corporation            Topic: 081FR3

    Rail vehicle distance traveled measurements don't currently meet the precision requirement of 5ft./mile. An innovative microwave technique is proposed using two X band transceiver assemblies separated by a known distance. Reflected energy from metal objects such as tie-plates or dielectric contrast between ties and rail bed are used as replicate pairs to measure the time passage between transcei ...

    SBIR Phase I 2009 Department of Transportation
  4. HOLD

    SBC: Airdex Corpon            Topic: N/A

    THE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...

    SBIR Phase I 1985 Department of Transportation
  5. COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY.

    SBC: Expert Systems Engineers            Topic: N/A

    COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY. SO LONG AS THE ENGINEER REMAINS ALERT, THE SYSTEM WORKS WELL, BUT WHEN THE ENGINEER IS NOT QUICK TO PERCEIVE AND REACT TO DANDER SIGNALS, THE SYSTEM FAILS. MAINTAINING ENGINEE ...

    SBIR Phase I 1985 Department of Transportation
  6. THIS PROJECT AIMS AT DEVELOPING A HIGHLY ACCURATE AND ECONOMICAL AIRCRAFT ALTIMETER.

    SBC: Gulf Applied Research Inc.            Topic: N/A

    THIS PROJECT AIMS AT DEVELOPING A HIGHLY ACCURATE AND ECONOMICAL AIRCRAFT ALTIMETER. THE MOTION OF AN EVACUATED BELLOWS WILL BE MONITORED BY AN OPTICAL POSITION SENSOR WHICH WILL GIVE AN ELECTRICAL ANALOG SIGNAL LINEARLY RELATED TO THE ATMOSPHERIC PRESSURE. WHILE THE SENSOR IS VERY SMALL, RUGGED AND INEXPENSIVE, IT HAS A LARGE DYNAMIC RANGE (100,000), HIGH LINEARITY (0.01%) AND HIGH SENSITIVITY (M ...

    SBIR Phase I 1984 Department of Transportation
  7. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government